Professional Documents
Culture Documents
Handover Flow Chart
Handover Flow Chart
A .Installation Phase 1) Inspection of Work Installation 2) Testing for the Installation 3) Pre-Requisite for T&C
1) 3) Pre- 4) Start –
B. Integrated Testing & 2) Installation 5) Operational 6) Functional
Commissioning Functional up & Initial
Commissioning Completion Performance Performance
Plan Checks Checkout
Phase verification Test Test
Phased
Handover
C. Closeout Phase