Data input: Data input:

Blok Model Exploration Yearly Mining Target


Parameter Economy Chemistry Specification
Operating Cost Data input: Hauling Distance
Capital Cost Geitechnical Parameter Capital Expenditures
Mining Parameter Sterillized Boundary Revenue
Grade Tonnage Curve IUP Boundary Operating & Total Cost

Cut-off Grade Ultimate Pit Design


Mine Schedulling Economically Yes
Determination Pit Design Reporting
Final Projection Viable?
Optimization In Pit Resource Estimation

No
Output: Output: Output: Reporting
Applied Cut-off Grade Ultimate Pit Design Mine Schedulling KCMI
Grade Tonnage Curve Pit Shell design Financial Model
Reserve Estimation Reserve within Pit Shell NPV
IRR
PBP
ITERATION