NO :
MATERIAL RECEIVING REPORT DATE :
PROJECT : JETTY 2 CONSTRUCTION PROJECT NO :
SUPPLIER : AMSTEEL MILLS SDN BHD KLANG SELANGOR, MLYS PO NO :
D.O No : 15334/15335 DATE 24/Nov/21
CARRIER : XINTEEEL SDN STORAGE LOC : FABRICATION
Received Dimension Weight Vol REMARK
NO DESCRIPTION
Unit Qty W H/t L Kg M3
TOTAL 35,000
Note : _________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
PREPARED BY : CHECKED BY :
COMPANY PT. REKO ERA BARU PT. WASCO ENGINEERING INDONESIA
SIGNATURE
NAME
DATE
JETTY 2 CONSTRUCTION PROJECT
PREPARED BY : CHECKED BY :
COMPANY PT.REKO ERA BARU PT. WASCO ENGINEERING INDONESIA
SIGNATURE
NAME
DATE
JETTY 2 CONSTRUCTION PROJECT
GOODS DESCRIPTION
CASE NO :
PAKAGE TYPE : A. CONTAINER
B. CASE / BOK
C. CRATE
D. PALLET
E. PC PILE
F. LOOSE ITEM
G. ______________
DICIPLINE :
MATERIAL CODE / ITEM NO :
QUANTITY SHIPMENT :
CHECK REPORT
DESCRIPTION :
A. MATERIAL
Quantity : Complete Over Shortage
Others :
B. DOCUMENT
Packing list : YES NO
Others :
PREPARED BY : CHECKED BY :
SIGNATURE
NAME
DATE
JETTY 2 CONSTRUCTION PROJECT
INSPECTION REPORT
Sub Contractor : Date :
Client : Location :
Project : Report no. :
3. Inspection Result
4. Remarks
5. Decision Accepted
Refused
________
PREPARED BY : CHECKED BY :
COMPANY PT.REKO ERA BARU
SIGNATURE
NAME
DATE