MATERIAL VERIFICATION AND INSPECTION

REPORT ( MVR )

Project: JETTY 2 CONSTRUCTION PROJECT


Project No.: Date: 25 NOV 2001
Drawings: Area: Wasco Yard 3
Inspection Ref : REB-RFI-020 Location: FABRICATION RE-BAR

Acceptance Inspection
CHECK POINT Accept Reject N/A Comments
1. Documentation

2. Shipping Damage

3. Phisyical Damage

4. Identification/ Marking

5. Dimention

6. Cleanliness

7. Protective Cover / Seals

8. Caoting / Preservatives

9. Inert Gas Blanket

10. Desiccant

11. Lubricants / Oils

12. Storage status

13. Others, if any

QA/QC CLIENT
PT. REKO ERA BARU PT. WASCO ENGINEERING INDONESIA

Name Pandar Name

Signature Signature

Date Date