You are on page 1of 8
‘PHYSICAL INFRASTRUCTURE ~ DRAINAGE SYSTEM Lucknow ey is stustesalong the rer Gon and has, lan topography with lope toned the rer sie. The ‘rion: betisen the aus ae very esha pnd 103 m oly The ot tyson ray {nd Tans Gant. Apart. there ae fe natural pos With dain agit the tanger of 100% Low ing areas along the Gort ver ‘maori lc dranage term hence these areas are Mh prone eo wate gang ‘Sewerage ne bythe publ resign choking of ewer nes Chola erin: Most ofthe dso ate cole with old wast and coutng water loging stustion in many of he esr ores. Increase ano Orsinage newer of Leno was atablned amare decade {ow Punping capacity: Purping machines at the Flood Pumping Staton and Sewerage Pumping avons eno suticet fr exsting quantity of waste water fowing te sri ‘iting Indes: Regular and proper cleaning of eens not beng done. Major Crane are cleaned once na yer before the mensoon oI any como ther enw sting of rane reutinito overtiow of ster ana wate laine ston Primary Drainage system: Primary drainage stem of Lcknew comprises of Ree ‘Cnt Hader Caral end Kula River [Now Toning as an). ter the major ood of 1960 in eno bund ave Boe contracted on both he bake ofthe rer Dang ‘pumped into th er though 42 food pumping atone oated varius parts Secondary Draloage Systm: Tere are 26 mao ain in Lucknow fowng tough ‘auton ana Bharwra STP. Treatee water fom Both the SPs ican to L000 Puntrns STATIONS (F5) Dring the rem water evel of Gon in monsoons he sewage aswell cy orm ‘here re warus sal steams scaring thai water te Kral Nalh bal are Based on the ey topoprapmy. major eos, easing rata tans ana rier rosin Luemow cy as ben de nto sx Sranage length in tack ey 2701 km whieh 80% ft strength esknese Snag stemin loon . est i Negara Dreln No serrate tx or chrges for Oainage stem Dumping of abode intr water in Noung of untested ewags nt drains ers 1 Absence of eralnage network inthe ums 5 Fung sources se wale lo ew ports ‘opportunity eats > Promoting ran water harvesing Untreated senage mix wt open rans and opportu otreat the stom water and useitas "River Gome pote wster + Fleoing and Water ging P20 sx am-20) GRour-3 INSTITUTE OF ARCHITECTURE sca| INSTITUTE OF ARCHITECTURE INSTITUTE OF ARCHITECTURE West Manogement Flow Chart For “ucknow cy ‘Thetooming section Iss the ssues mSWM shouldbe noted that priate sector operator hasbeen pponted fr SW rom any 201. Lk of Sanitary landfil ste Curent, theres no sanitary engineered anit, and MSW is dumped in open an, whieh ea o ground water hcl polation, vector nuisance, ee However sanitary Indi te under contraction under the SWM eject whch Being implemented Inappropriate primary collection of solid waste: Wat is charged by esabshments (residential and nonresident) nto open pot, open rin, ste. Thre unorantes spor methods Rave rested inthe asenltion fells wt on rsdedes, scat pls, a orm water Grin Tra reutedin number ofhyloe lated poser such a breeding morons and prerene of ay anal. ‘Tanspertaton of solid waste In open vides: Sold was transpoted primarily n open tvs, thee wheels, nd wales es so observed ‘hat these veils are overloaded wth wate, esting Inthe tering of eas rig wansporation. reload ad unloading of waste sone ‘manly, nsf laramehars vlvedin thi att da not re ry personal protec equipment PPE, Inappropiste colecion and apart of construction waste: The consrctin/demtion waste generated by oc esident I Wansprte in ‘war totes and aspsea at ether secondary allection pts aper/owrying areas inthe ey. Mixing of suger house warts with MSW” nt rom Hauahter house dose in open dumping tes athough thee are provions fr separate ispoig slaughterhouse wast in ico ey. tio treatment facty for E waste: As of now theres no testment ty aatable for waste in Lucnow: The cys gnerating huge amour of ‘tate when cemartedumsetfiealy in zor ofthe mares. fer emantng process alee te 0d an over pots ae trou ‘a nearby aumpng plas. The lt overt irhaardoe and posting he enionment Inadequate number of community dustin: Almost 20% ofthe Hsin the cy ate dump waste in ape ate, One the reser for thsi the lek tedequate number femme bis Dumping Sle At Dubogge sworanarss Mutipe handing of waste: Wat shana tpl times leading o pote hath haz forthe workers 5 al types of wastes ncn ospl waste, eran waste, ele re dapose at he same storage pois Samar werkt af nol gen ay rte Sang ck of community volvement: There ar er fw Reident Welle araciatons [Wf of NEOs Inoled le sty snd the commun t [ages ot nave In ective SN door t+ Only 57 wares cut of HO wars ae coveredunger Ove to huge quamty of waster prornce of publ towards wast oor ta dor eaten fenetion theres opportunity to Management. Dove to oor colton system wil Soon be» Waste sil being dumped in open plcesleadingmpemert. ew technoloesIME> Low lee ter charges colton can esd ‘rolerered ine over ware twenionmenta depadton ast to energy composing to” poor mantenance of the WM Processing actutes at lanl se and» Sepregaton cf ast lst happenings of now. > ist with maret vale cn be nfasructre processing lan wis soon People ae not willing to pay ur charge for waste eusedthouphresngcentres. > Contmuoiscumping of waste in open ees {Me i actly working {0 change the SWM” coecton, + raohement of Tag pikes in” spouting crear seenario nLucnow + People re ot aware of the consequences of” ransed waste colecton systems upg ef wos Indy and water bodies ‘mienanaging te wast. ‘Gnprovdethememsloyent. ead to are flow of rin and water lesing Dumping of waste ro open ris and ve Inmanyares. 2 Unig conditions at dhleos are creting > Gusting smping sites are wuneabe fr Fire neat conan the nearby reset areas Incidents na rou water contamination. M4 T=91D en INSTITUTE OF ARCHITECTURE sem (2120-21) GRoUP-3 verona | Ay FUFR2? sea omer [rrr crowns [ROUTESrAROMTEEIES T 1 conmunrwesnon Sah ‘ovate wom FURS p erness GRour-3 INSTITUTE OF ARCHITECTURE rood length in Luchnow cy 3387 kn, whch includes 73k of N12 km (of sian et ae rer osu ater ond National Mnvay hry ‘finan maintains atonal highway, PD and LMC tat care of the 3 ‘ther ey network oan Lek Zone 439 2 a7 Zones 703 5¢ 778 Read Dens n Zon of Zone 6590 e 337 Tekno Zone Wise Length And Deny Of Rods eed ‘ood Deny Comparvon Of ucknow Wit ili Bs Porvrtan Cask Uickrom cy a presen atthe stage cf cnior-nade development in which the ng on concep and coor conept in ntpeted The rt ofthe Lucknow read system Is owas ing radial concep wich is suitable for {he yale. The ran spn ieknow ha akon lace inal rector slang the Nana S.A rom the pry, sje ist Road [MOR 96) radiates frm te cy cate. The ceil cre atea ofthe cy hat ‘etwonk toning of commonly ane une ros that ka mk of Biron patern and ral pater, Shing hgh ders of aaa. Te inta-tyWatfe moving betwen these thre seme ha o uaa ess Intrmaton gen n Cy Moby an of Lucknow, 37% of he rad network nthe study afea ave Right of Way (Gow between 2039 meer, 32% of rad network hae ROW ot 1020 mete and 3% ofthe network hae ROW Shove 5 mater The average crageway width 14 meter 30% ofthe oad netwarks have stn nd se 3 ‘med ine TRANSPORTATION SYSTEM at nial Grown snd Compoeion sie ee = fl | | | | | mr og “Category of Vehicles Number of Vehicles Se a ee ae ee inane 1 “Growth Of Registered Vile Lucknow (1994-2009) = 5 — = PURE TTT OF ARTETA cHouP- an] A cours | aT A INSTITUTE OF ARCHITECTURE

You might also like