Report Mining Agustus 2021
Report Mining Agustus 2021
`
Hours Meter
Total Activity Remarks
Finish
31.3 3.8 Trimming Coal PLO
36.1 4.8 Trimming Coal PLO
4498.8 2.7 HRM
15269 2.8 Clearing Control Box
407.2 1.4 Repair Loading & Dumping Point
4964.5 5.3 Loading Coal to Hopper
45.2 9.1 Trimming Coal PLO
4507.7 8.8 HRM
339965 0 Haul OB HM Error ( 6 Hrs )
295651 0 Haul OB HM Error ( 5 Hrs )
337201 0 Haul OB HM Error ( 6 Hrs )
337201 0 Haul OB HM Error ( 5 Hrs )
4967.2 2.4 Loading Coal to Hopper
4976.3 9.1 Trimming Coal PLO
15274.6 5.5 Clearing Control Box
14101.1 6.1 Loading OB
423.6 7.2 Repair Loading & Dumping Point
4516.8 9 HRM
340051 0 Haul OB HM Error ( 3 Hrs )
340051 0 Haul OB HM Error ( 3 Hrs )
334778 0 Haul OB HM Error ( 6 Hrs )
29508.2 0 Haul OB HM Error ( 6 Hrs )
213751 0 Haul OB HM Error ( 6 Hrs )
340071 0 Haul OB HM Error ( 7 Hrs )
48 2.8 Loading Coal to Hopper
15282 7.4 Loading OB
437.3 4.6 Repair Stock File PLO
4982.5 6.2 Trimming Coal PLO
441.3 4 Repair Stock File PLO
51.6 3.5 Dump Maintenance Reject
14105 1 Make Drainace
53.5 1.9 Trimming Coal PLO
4985.5 3 Trimming Coal PLO
448.3 7 Repair Stock File PLO
61.1 7.5 Loading Coal to Hopper
4993.6 7.8 Trimming Coal PLO
14106.5 1.4 Reinstal Pipe at Acces Road Lp
62.4 0.5 Stockpile Jig
34007.7 0.6 Hauling OB
334778 0 Hauling OB HM Error ( 2 Hrs )
15287.8 4.9 Loading OB
14111.6 5 Loading OB
4524.4 3.3 HRM
16772.3 1.9 HRM
4999.6 6 Trimming Coal PLO
5347 2.5 HRM
5002.2 2.6 Stockpile Jig
65.7 4.2 Loading Coal to Hopper
5008.1 5.9 Loading Coal to Hopper
5012.2 4.1 Trimming Coal PLO
4526.4 1.9 HRM
5347.2 0.2 HRM
5015.5 3.3 Trimming Coal PLO
5350.6 3.4 HRM
16775.8 3.5 HRM
9 3 Trimming Coal PLO
5016.1 0.6 Travel from SbL to Jig
69 3.3 Stockpile Jig
16779.3 3.5 HRM
463.2 3.5 Trimming Coal PLO
5354.3 3.7 HRM
4529.5 3.1 HRM
5023 6.8 Loading Coal to Hopper
18.4 9.4 Trimming Coal PLO
73.2 4.1 Loading Coal to Hopper
5033.6 9.8 Loading Coal to Hopper
28.2 9.8 Trimming Coal PLO
467.2 4 Trimming Coal PLO
5034.1 0.5 Travel from Jig to SBL
15291.3 3 Clearing Control Box
75.2 2 Dump Maintenance Reject
15293.3 2 Make Acces Road Pit 20
32.7 4.5 Trimming Coal PLO & Barging
471.6 4.4 Trimming Coal PLO
5357.7 3.4 HRM
16782.5 3.2 HRM
43.1 10.4 Loading Barging
15293.3 2 Clearing Control Box
15299.4 3.1 Clearing Control Box
474.3 2.7 Travel from SbL to Jig
5044.2 10.1 Loading Coal to Hopper
50.2 7.1 Trimming Coal PLO
16782.5 0 Stand by Weather- Raian
477.7 3.3 Repair Loading & Dumping Point
87.5 9.3 Reject Dp, Trimming Coal PLO & Loading Coal To Hopper
5357.7 0 Stand by Weather- Raian
5049.1 4.4 Loading Coal to Hopper
57.3 7.1 Trimming Coal PLO
15302.5 2 Instal Pipe & Make Drainace
15310.5 8 Loading OB
340083 6 Haul OB
295112 6 Haul OB
295114 2 Haul OB
340085.4 2.4 Haul OB
295116 2 Haul OB
484.2 6.5 Repair Acces Road Pit 20
66.5 9.2 Trimming Coal PLO
4538.4 1.8 Added Water Tank Magazine 1&2
5056.8 7.8 Loading Coal to Hopper
5357.7 0 Stand by Weather- Raian
97.5 10 Loading Coal to Hopper
99.3 2.1 Trimming Coal PLO
102.8 3.5 Loading Coal to Hopper
5060.7 3.9 Loading Coal to Hopper
4542.4 3.7 HRM
16786.3 3.8 HRM
5361.6 3.9 HRM
15314.7 4.2 Make Drainace
485.5 1.2 Prepare Loading & Dumping Point
72.8 6.3 Trimming Coal PLO
340090 4 Haul OB
295118 2 Haul OB
489.8 4.3 Repair Acces Road Pit 20
103.5 1.5 Dump Maintenance Reject
73 0.8 Trimming Coal PLO
5361.6 0 Stand by Weather- Raian
16786.5 0 Stand by Weather- Raian
79 6.2 Trimming Coal PLO
108.4 4.8 Loading Coal to Hopper
15321.4 2 Make Drainace
83.4 4.4 Trimming Coal PLO
111.4 2.9 Dump Maintenance Reject
495 1.9 Prepare Loading & Dumping Point
15323.9 1.7 Maked Drainace
16786.6 0 Stand by Weather- Raian
5361.6 0 Stand by Weather- Raian
131881 12 Added Fuel Tank & Genset Quary
120 8.6 Loading Coal to Hopper
5065 4.2 Dump Maintenance Reject
16792.9 6.3 HRM
5367.9 6.1 HRM
4547.1 4 HRM
499 3.9 Prepare Loading & Dumping Point
506.4 7.4 Prepare Loading & Dumping Point
86.7 3.3 Trimming Coal PLO
15327.2 2.7 Loading OB
15335.9 8.7 Loading OB
295118 0 Haul OB HM Error ( 1 Hrs )
340094 4 Haul OB
340108 14 Haul OB HM Error ( 5 Hrs )
295128 10 Haul OB HM Error ( 5 Hrs )
0 0 Haul OB HM Error ( 3 Hrs )
257217 0 Haul OB HM Error ( 3 Hrs )
5371.4 3.5 HRM
16797.1 4.2 HRM
15338.4 2.5 Re-Instal Pipe Mine Pit 20
5066.5 1.5 Trimming Coal JBA Room JIG
5070.6 4.2 Trimming Coal JBA Room JIG
5073.2 2.6 Trimming Coal JBA Room JIG
96 9.3 Barging PLO
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
`
plan wh PG 2012
ID TANGGAL SHIFT
EWH STB BD PA MA
1 2 3 4 8 9 10 11 12
0.00 2.00 74% 74% 100% 6.32 0.00 1.50 81% 81%
7.82 100% 0% 0% 7.82 0.00 100% 100%
0.00 1.50 80% 80% 100% 3.32 0.00 4.00 45% 45%
0.00 100% 100% 100% 0.00 0.00 7.32 0% 0%
0.00 100% 100% 100% 0.00 0.00 7.82 0% 0%
0.00 100% 100% 100% 0.00 0.00 7.82 0% 0%
0.00 100% 100% 100% 0.00 0.00 7.82 0% 0%
7.82 100% 0% 0% 7.82 0.00 100% 100%
0.00 100% 100% 100% 0.00 0.00 7.82 0% 0%
0.00 100% 100% 100% 0.00 0.00 7.82 0% 0%
0.00 100% 100% 100% 4.82 0.00 2.50 66% 66%
7.32 100% 0% 0% 3.32 0.00 4.00 45% 45%
0.00 7.82 0% 0% 0% 4.82 0.00 3.00 62% 62%
0.00 7.82 0% 0% 0% 4.82 0.00 3.00 62% 62%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
6.82 100% 0% 0% 0.00 6.82 100% 0%
6.82 100% 0% 0% 0.00 6.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
0.00 7.82 0% 0% 0% 0.00 0.00 7.82 0% 0%
0.00 7.82 0% 0% 0% 0.00 0.00 7.82 0% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.32 100% 0% 0% 0.00 7.32 100% 0%
7.32 100% 0% 0% 0.00 7.32 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
6.82 100% 0% 0% 0.00 6.82 100% 0%
6.82 100% 0% 0% 0.00 6.82 100% 0%
0.00 0% 0% 0% 0.00 0.00 0% 0%
6.53 100% 0% 0% 0.00 6.53 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.32 100% 0% 0% 0.00 7.32 100% 0%
7.32 100% 0% 0% 0.00 7.32 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
6.82 100% 0% 0% 0.00 6.82 100% 0%
6.82 100% 0% 0% 0.00 6.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.32 100% 0% 0% 0.00 7.32 100% 0%
7.32 100% 0% 0% 0.00 7.32 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
6.82 100% 0% 0% 0.00 6.82 100% 0%
0.00 100% 100% 100% 6.82 0.00 100% 100%
7.82 100% 0% 0% 0.00 7.82 100% 0%
7.82 100% 0% 0% 0.00 7.82 100% 0%
85% 53% 56% 48% 35%
86% 0% 0% 86% 0%
93% 0% 0% 93% 0%
100% 0% 0% 100% 0%
100% 25% 25% 100% 25%
PGEX 03
UA HM Awal HM Akhir EWH STB BD PA MA UA HM Awal
58 59 60 61 62 63 64 65 66 67
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
PG 2012 PG 2013 PG 2011 2014 2015 2016
ID TANGGAL SHIFT
HINO 500
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17 18 19
112
427
253
301 179
407
151
373 299 247
399 274
300
224
351
200 293 169
502
200
150 133
312 133
103 193
200 94 148
149
150
428
59
200 262
35 34 132
54
28 73
16
48 50 50
30 42 30
66
21 90
51 50
34
35
17
40
63 41 32 21
58 37 71
25
35 37
25
25 35 42
52 65 215 106
22 30 20
35 39 42
40
52
58 34 46
FUEL FUEL FUEL FUEL
PGWT 03 PGFT 02 REFUELING
CONS I CONS I CONS I REMAINING REMARKS
WATER TRUCK
FUEL TRUCK MINING JIG HRM I II
39 40 41 42 43 44 45 46 47
1 2 3 4 5 6 7 8
44 45 46 47 48 49 53
762,768.500 - - 13,130
PROD/DAY
FUEL/DAY Safety
(COAL) REMARKS
I II III IV
54 55 56 57 58 59 60 61
.0 928.0PGEX 03 Mansyur
BD (trackPG lepas)
2012readyBD (kampas
PG
pukul201513.00
kopling)
BD (low power) PG 2013 BPG 2016 BD (filter fuel longgar) pukul 15
PGEXPG03
Mansyur
BDstel
2013 (lampu
kopling kerja) ready
dan handel pukul
transmisi 20.25
pukul 21.00 dan ready pukul 22.00
.0 1007.0 PGMansyur
2013 BD (high low
PG 2016 bermasalah)
PG 2015
BD (kampas PG 2012
BD (low kopling
power) pukul BD
habis) (kampas
09.05, kopling
ready pukul 10.24 habis)
Mansyur
PG 2011 ready pukul 21.10
PG 2014 BD (kampas
PG 2011 PG 2016PG
kopling)
BD (masuk BD2013
(kampas
angin) BD (high
kopling)
low bermasalah)
.0 1007.0 Mansyur
PG 2016 BD (kampas kopling) HujanPerbaikan
11.0 front dan disposal
Mansyur
PG 2016 BD (kampas PG 2014 BDkopling)
(kampas kopling)
.0 735.0 Mansyur
Hujan 06.30 - 09.00 PGDZ 01 BD pukul 09.0PG PG2016
2014 BBD (kampas kopling)
01 BD (relay batrey)Dumpingan
PGDZMansyur dari awal shift penuh karena shift 1 free dump
.0 837.0 PG 2016 BD (kampasHujan
Mansyur kopling) pukul 16.30
Mansyur
PG 2016 BD (kampasAwal kopling)shift slippery dan prepare front
.0 1176.0 Mansyur
Hujan 09.45 - 11.00 PG 2012 BPG 2016 BD (handel transmisi rusak) pukul 15.30
Mansyur PG 2012 BPG 2016 BD (handel transmisi rusak)
.0 1412.0
PG 2014 BDMansyur
PG
(engine
2016 BD mounting
(handelputus)
transmisi)pukul
PG 2015
ready
09.25
PGBD 2012
pukul
(AC)BD13.25
(gigi mundur)
PG Mansyur
2014 BD (engine mounting PG 2015 putus)
PG 2016
BD (AC)
BD (hose dump) pukul 01.30
.0 .0 Mansyur Libur Tes Antigen
Mansyur Libur Tes Antigen
.0 40.0 Mansyur Libur Tes Antigen 0
Mansyur Libur Tes Antigen
.0 616.0 Mansyur Libur Tes Antigen 0
PG 2012
Mansyur
BD ( Gigi Mundur Bermasalah )
.0 1514.0 EX03 B/D ( Track
Mansyur PG2015
Lepas PG2012
B/D
15.50 ( Ac
B/D
) Mati( Kopling
) masalah ) 3
Mansyur
PG 2015 B/DPG( AC Standby
20111mati
BD ( )Battery
Repair
EX03 Low
B/DLp() Track
01.50-02.15
lepas ) dan standby material habis
.0 476.0 Mansyur
EX03 B/D ( Track lepas ) 0
Mansyur
EX03 B/D ( Track lepas )
.0 128.0 Mansyur
EX03 B/D ( Track lepas ) 0
Mansyur
EX03 B/D ( Track lepas )
.0 272.0 Mansyur
EX03 B/D ( Track lepas ) 0
Mansyur
EX03 B/D ( Track lepas )
.0 25.0 Mansyur
EX03 B/D ( Track lepas ) 0
Mansyur
EX03 B/D ( Track Lepas )
.0 102.0 Mansyur
EX03 B/D ( Track lepas ) 0
Mansyur
EX03 B/D ( Track lepas )
.0 .0 Mansyur Libur 17 Agustus 0
Mansyur Libur 17 Agustus
.0 656.0 Mansyur
EX03 B/D ( Track lepas ) 0
Mansyur
EX03 B/D ( Track lepas )
.0 478.0 Mansyur
EX03 B/D ( Track lepas ) 0
Mansyur
EX03 B/D ( Track lepas ) 0
.0 116.0 Mansyur
EX03 B/D ( Track lepas ) 0
Mansyur
EX03 B/D ( Track lepas ) 0
.0 606.0 Mansyur
EX03 B/D DZ01
( Track
B/Dlepas
( Cyl Adjuster
) Leak ) 0
Mansyur
EX03 B/D ( Track lepas ) 0
.0 52.0 Mansyur
EX03 B/D Weather-Rain
( Track
DZ01Loose
B/D Cyl )06.00-11.00
Adjuster Leak, Ready at 01:000
Mansyur
EX03 B/D ( Track Loose
DZ01 B/D )
( Cyl Adjuster Leak ) 0
.0 462.0 Mansyur
EX03 B/D Weather-Rain
( Track Loose )06:00-11:00 0
Mansyur
EX03 B/D ( Track Loose )
Weather-Rain 01:00 - 06:00 0
.0 485.0 Mansyur
EX03 B/D Weather-Rain
( Track Loose )06:00-16:00 0
Mansyur
EX03 B/D ( Track Loose )04:00-06:00
Weather-Rain 0
.0 .0 Mansyur
EX03 B/D Weather-Rain
( Track EX04
LooseInstal
)06:00-11:30
Pipe & Make Drainace 0
Mansyur
EX03 B/D ( Track Loose )
Waiting
EX04Prepare
Loading Loading
OB 23:30
Point to Dumping
Start Loading
Point 19:30-23:30
23:30
Hard Material
.0 .0 Mansyur
EX03 B/D Weather-Rain
( Track Loose )06:00-18:00 0
Mansyur
EX03 B/D ( Track Loose )18:00-06:00
Weather-Rain 0
.0 .0 Mansyur
EX03 B/D Weather-Rain
( Track Loose
Weather )06:00-13:25
Recovery 13:25-18:00 0
Mansyur
EX03 B/D ( Track Loose )
Weather Recovery
Exca 0418:00-21:00
Pin teeth bucket
Weather-Rain
loose 23.10
24:50-06:00 2
.0 .0 Mansyur
EX03 B/D Weather-Rain
( Track Loose )06:00-18:00 0
Mansyur
EX03 B/D ( Track LooseWeather
Weather-Rain )18:00-23:00
Recovery 23:00-01:30 01:30-06:00 0
Weather-Rain
.0 .0 Bryan
EX03 B/D Weather-Rain
( Track Loose )06:00-18:00 0
Bryan
EX03 B/D ( Track Loose )
Weather-Rain 18:00-06:00 0
.0 .0 Bryan
EX03 B/D Weather-Rain
( Track Loose
Weather )06:00-14:00
Recovery Start
14:00-16:00
Loading 16:00 3
Bryan
EX03 B/D ( Track Loose
Repair )
Lp 18:00-19:00 3
.0 .0 Bryan
EX03 B/DEX04
( Track Loose
Cyl Adjuster ) (atBlade
DZ 01 Leak
B/D 13:00-18:00
Low Power ) 06:00-18:00 0
Bryan
EX03 B/D ( Track Loose )
EX04 Cyl Adjuster
DZ 01 Leak
B/D (at
Blade
18:00-06:00
Low Power ) 18:00-06:00 1
0
QTT Rain - Act (Hrs)
Rain Fall 1 2 3 4 5 6 7 8
Manggis
Pit 20
Sembilang
Aug-21
9 10 11 12 13 14 15 16 17 18 19
17 19 21 23 25 27 29 31 33 35 37
- - 21.3 87.9 15.8 10.0 2.0 2.4 53.0 67.4 36.0
1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
- - - - 14.0 5.0 0.5 1.5 8.0 10.0 11.5
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
- - 1.0 - - - - - - - -
0% 0% 0% 0% 1308% 467% 47% 140% 748% 935% 1075%
0% 0% 208% 0% 0% 0% 0% 0% 0% 0% 0%
Aug-21
9 10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25 26 27 28 29 30
39 41 43 45 47 49 51 53 55 57 59
17.0 53.7 5.5 10.8 17.0 3.0 21.0 43.0 40.0 19.0 18.0
1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
6.0 20.0 10.0 10.0 12.0 6.5 24.0 12.5 21.5 21.0 8.0
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
- - - - - 4.0 - 7.6 4.0 3.0 2.0
561% 1869% 935% 935% 1121% 607% 2243% 1168% 2009% 1963% 748%
0% 0% 0% 0% 0% 833% 0% 1583% 833% 625% 417%
20 21 22 23 24 25 26 27 28 29 30
38 0 18
40 19 8
0 0
31
61 961.0
7.0 575.1
1.1 33.2
2.1 223.1
0.5 14.9
- 30.15
196% 208.5
0% 62.8
31 Total
0 56
7 74
0 0
DAILY EQUIPMENT STATUS UNIT DEPT. PRODUKSI
PT. PRAGER KENCANA SERVICES PERIODE MEI 2021
NO Type unit No. Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Remarks
UNIT DIGGER
1 HITACHI 330 PGEX 03 ### ### - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 HITACHI 350 PGEX 04 - - 15.64 7.82 - - - 15.64 13.64 7.82 - 15.64 14.64 15.64 7.82 13.64 6.53 15.64 15.64 14.64 15.64 15.64 13.64 15.64 7.82 15.64 7.32 15.64 15.64 - 15.64
Siti Hardini
Production 1 2 3 4 5 6 7 8
Avg. Dist-Plan 300 300 300 300 300 300 300 300
Avg. Dist-Actual 302 304 338 327 346 358 392 392
Accum-Plan 300 300 300 300 300 300 300 300
Accum-Actual 302 304 338 327 346 358 392 392
Ach. Dist-Daily 101 101 113 109 115 119 131 131
Ach. Dist-Accum 101 101 113 109 115 119 131 131
Aug-21
9 10 11 12 13 14 15 16 17 18
300 300 300 300 300 300 300 300 300 300
100 100 100 100 100 100 100 100 100 100
300 300 300 300 300 300 300 300 300 300
100 100 100 100 100 100 100 100 100 100
33 33 33 33 33 33 33 33 33 33
33 33 33 33 33 33 33 33 33 33
19 20 21 22 23 24 25 26 27 28
300 300 300 300 300 300 300 300 300 300
100 100 100 100 100 100 100 100 100 100
300 300 300 300 300 300 300 300 300 300
100 100 100 100 100 100 100 100 100 100
33 33 33 33 33 33 33 33 33 33
33 33 33 33 33 33 33 33 33 33
29 30 31
300 300 300
100 100 100
300 300 300
100 100 100
33 33 33
33 33 33
PT. PRAGER KENCANA SERVICES
Coal Mining Subcontractor & Heavy Equipment Rental
Kinanti Building Lt.2 Zone 3 Jl. Epicentrum Tengah No.03, Jakarta Selatan
STATUS UNIT
Digger Hauler Support
PGEX 03 BD PG 2011 STB PG 2014 STB PGDZ 01 STB
PGEX 04 RFU PG 2012 STB PG 2015 STB PGLO 2203 RFU
PG 2013 STB PG 2016 STB PGLO 2204 STB
PRODUKSI/FLEET ON SHIFT
Fleeet 01
Material OB
Total Ritase 0 RIT
Plan 000.00 Bcm
Actual 000.00 Bcm
Achievement 0%
Produksi / Jam .000
REVIEW PRODUKSI SHIFT 1
Total OB - Bcm
Total COAL - Ton -
Fuel cons - Liter
Fuel Ratio -
TOTAL PRODUKSI/DAY
Total OB - .0 BCM
Total Coal - .00 0 TON
MONTH TO DATE (MTD)
Plan OB 79,721.00 BCM Plan Coal 000.00 Ton Total Fuel Consumption 13,130 Liter
Actual 15,892.50 BCM Actual 000.00 Ton Total Fuel Ratio 0.83
Achievement 19.94 % Achievement 0.00 % Fuel on Hand Liter
Remain 63,829 BCM Remain 000 Ton 0.00 #REF!
REMARKS
Bryan
EX03 B/D ( Track Loose )
EX04 Cyl Adjuster Leak at 13:00-18:00
DZ 01 B/D ( Blade Low Power ) 06:00-18:00
0
PT. PRAGER KENCANA SERVICES
Coal Mining Subcontractor & Heavy Equipment Rental
Kinanti Building Lt.2 Zone 3 Jl. Epicentrum Tengah No.03, Jakarta Selatan
STATUS UNIT
Digger Hauler Support
PGEX 03 BD PG 2011 STB PG 2014 STB PGDZ 01 STB
PGEX 04 BD PG 2012 STB PG 2015 STB PGLO 2203 RFU
PG 2013 STB PG 2016 STB PGLO 2204 STB
PRODUKSI/FLEET ON SHIFT
Fleeet 01
Material COAL
Total Ritase 0 RIT
Plan 000.00 Bcm
Actual 000.00 Bcm
Achievement 0%
Produksi / Jam .000
REVIEW PRODUKSI SHIFT 2
Total OB - Bcm
Total COAL 15,892.50 Ton 12,225.00
Fuel cons - Liter
Fuel Ratio -
TOTAL PRODUKSI/NIGHT
Total OB - .0 BCM
Total Coal 15,892.500 12225 TON
MONTH TO DATE (MTD)
Plan OB 79,721.00 BCM Plan Coal 000.00 Ton Total Fuel Consumption 13,130 Liter
Actual 15,892.50 BCM Actual 000.00 Ton Total Fuel Ratio 0.83
Achievement 19.94 % Achievement 0.00 % Fuel on Hand Liter
Remain 63,829 BCM Remain 000 Ton 0.00 #REF!
REMARKS
Bryan
EX03 B/D ( Track Loose )
EX04 Cyl Adjuster Leak at 18:00-06:00
DZ 01 B/D ( Blade Low Power ) 18:00-06:00
-
Week 1
Production
1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
1 3 5 7 9 11
OB-Plan (Bcm) 2316 2168 2316 2316 2316 2168
OB-Actual (Bcm) 1755 1839.5 1521 552.5 1566.5 1807
Coal-Plan (MT) - - - - - -
Coal-Actual (MT) - - - - - -
SR-Plan - - - - - -
SR-Actual -
Act-OB 76% 85% 66% 24% 68% 83%
Act-Coal 0% 0% 0% 0% 0% 0%
Week 1
Rain & Slippery
1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
Rain Fall - Act (mm) - - - - 5.4 2.7
Rain - Plan (Hrs) 1.1 1.1 1.1 1.1 1.1 1.1
Rain - Act (Hrs) - - 5.0 4.0 1.5 1.5
Slippery - Plan (Hrs) 0.5 0.5 0.5 0.5 0.5 0.5
Slippery - Act (Hrs) - - 2.3 1.8 0.7 0.7
% Rain 0% 0% 467% 374% 140% 140%
% Slippery 0% 0% 469% 375% 141% 141%
Week 1
Distance
1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
Avg. Dist-Plan 300.0 300.0 300.0 300.0 300.0 300.0
Avg. Dist-Actual 301.7 304.0 338.4 326.5 346.5 357.6
Accum-Plan 300.0 300.0 300.0 300.0 300.0 300.0
Accum-Actual 301.7 314.6 327.4 340.3 353.1 366.0
Ach. Dist-Daily 101% 101% 113% 109% 115% 119%
Ach. Dist-Accum 101% 105% 109% 113% 118% 122%
90 12.857143
Week 1
MINING
1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
PLAN 2,821 2,643 2,821 2,821 2,821 2,643
ACTUAL 928 1,007 1,007 735 837 1,176
Week 1
HRM
1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
PLAN 329 308 329 329 329 308
ACTUAL 167 28 16 - 30 90
Week 1
JIG
1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
PLAN 3,380 3,164 3,380 3,380 3,380 3,164
ACTUAL - - - 546 274 810
Week 2
7-Aug 8-Aug 1 s.d 8 9-Aug 10-Aug 11-Aug 12-Aug 9 s.d 12 13-Aug
13 15 17 19 21 23 25
2316 2316 18,232 2020 2316 2316 2316 8,968 2168
2398.5 0 11,440 0 988 1664 0 2,652 0
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
104% 0% 63% 0% 43% 72% 0% 30% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
Week 2
7-Aug 8-Aug 1 s.d 8 9-Aug 10-Aug 11-Aug 12-Aug 9 s.d 12 13-Aug
0.7 15.5 24.3 - - 21.3 87.9 152.4 15.8
1.1 1.1 8.6 1.1 1.1 1.1 1.1 16.1 1.1
1.0 6.0 19.0 - - - - 27.5 14.0
0.5 0.5 3.8 0.5 0.5 0.5 0.5 7.2 0.5
0.5 2.7 8.6 - - 1.0 - 13.4 -
93% 561% 222% 0% 0% 0% 0% 171% 1308%
94% 563% 223% 0% 0% 208% 0% 186% 0%
Week 1
7-Aug 8-Aug 1 s.d 8 9-Aug 10-Aug 11-Aug 12-Aug 9 s.d 12 13-Aug
300.0 300.0 300 300 300 300 300 300 300
391.8 391.8 345 100 100 100 100 189 100
300.0 300.0 300 300 300 300 300 300 300
378.9 391.8 347 100 100 100 100 190 100
131% 131% 115% 33% 33% 33% 33% 63% 33%
126% 131% 116% 33% 33% 33% 33% 63% 33%
Week 2
7-Aug 8-Aug 1 s.d 8 9-Aug 10-Aug 11-Aug 12-Aug 9 s.d 12 13-Aug
2,821 2,821 22,213
1,412 - 7,102 40 616 1,514 476 2,646 128
Week 2
7-Aug 8-Aug 1 s.d 8 9-Aug 10-Aug 11-Aug 12-Aug 9 s.d 12 13-Aug
329 329 2,587
- 17 348 - 63 150 58 271 -
Week 2
7-Aug 8-Aug 1 s.d 8 9-Aug 10-Aug 11-Aug 12-Aug 9 s.d 12 13-Aug
3,380 3,380 26,605
169 1,340 3,139 1,437 1,349 1,798 - 4,584 1,418
Week 3 Week 4
14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 13 s.d 18 19-Aug 20-Aug 21-Aug
27 29 31 33 35 37 39 41
2316 1878 1638 784 1878 10,662 1878 1758 1878
0 305.5 0 0 0 306 0 0 0
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
0% 16% 0% 0% 0% 3% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
Week 3 Week 4
14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 13 s.d 18 19-Aug 20-Aug 21-Aug
10.0 2.0 2.4 53.0 67.4 150.6 36.0 17.0 53.7
1.1 1.1 1.1 1.1 1.1 6.4 1.1 1.1 1.1
5.0 0.5 1.5 8.0 10.0 39.0 11.5 6.0 20.0
0.5 0.5 0.5 0.5 0.5 2.9 0.5 0.5 0.5
- - - - - - - - -
467% 47% 140% 748% 935% 607% 1075% 561% 1869%
0% 0% 0% 0% 0% 0% 0% 0% 0%
Week 3 Week 4
14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 13 s.d 18 19-Aug 20-Aug 21-Aug
300 300 300 300 300 300 300 300 300
100 100 100 100 100 100 100 100 100
300 300 300 300 300 300 300 300 300
100 100 100 100 100 100 100 100 100
33% 33% 33% 33% 33% 33% 33% 33% 33%
33% 33% 33% 33% 33% 33% 33% 33% 33%
Week 3 Week 4
14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 13 s.d 18 19-Aug 20-Aug 21-Aug
272 25 102 - 656 1,183 478 116 606
Week 3 Week 4
14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 13 s.d 18 19-Aug 20-Aug 21-Aug
- - - - 552 552 22 - 40
Week 3 Week 4
14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 13 s.d 18 19-Aug 20-Aug 21-Aug
Week 4 Week 5
22-Aug 23-Aug 24-Aug 25-Aug 19 s.d 25 26-Aug 27-Aug 28-Aug 29-Aug
5.5 10.8 17.0 3.0 143.0 21.0 43.0 40.0 19.0
1.1 1.1 1.1 1.1 7.5 1.1 1.1 1.1 1.1
10.0 10.0 12.0 6.5 76.0 24.0 12.5 21.5 21.0
0.5 0.5 0.5 0.5 3.4 0.5 0.5 0.5 0.5
- - - 4.0 4.0 - 7.6 4.0 3.0
935% 935% 1121% 607% 1015% 2243% 1168% 2009% 1963%
0% 0% 0% 833% 119% 0% 1583% 833% 625%
Week 4 Week 5
22-Aug 23-Aug 24-Aug 25-Aug 19 s.d 25 26-Aug 27-Aug 28-Aug 29-Aug
300 300 300 300 300 300 300 300 300
100 100 100 100 100 100 100 100 100
300 300 300 300 300 300 300 300 300
100 100 100 100 100 100 100 100 100
33% 33% 33% 33% 33% 33% 33% 33% 33%
33% 33% 33% 33% 33% 33% 33% 33% 33%
Week 4 Week 5
22-Aug 23-Aug 24-Aug 25-Aug 19 s.d 25 26-Aug 27-Aug 28-Aug 29-Aug
52 462 485 - 2,199 - -
Week 4 Week 5
22-Aug 23-Aug 24-Aug 25-Aug 19 s.d 25 26-Aug 27-Aug 28-Aug 29-Aug
-
- - - - 62 - 5,000
Week 4 Week 5
22-Aug 23-Aug 24-Aug 25-Aug 19 s.d 25 26-Aug 27-Aug 28-Aug 29-Aug
-
476 738 2,298 - 7,921 - 5,000
Week 5
MTD
30-Aug 31-Aug 26 s.d 31
59 61
1638 1878 10908 50,648
799.5 0 1001 15,893
- - -
- - -
- - -
- - -
49% 0% 9% 31%
0% 0% 0% 0%
Week 5
MTD
30-Aug 31-Aug 26 s.d 31
18.0 7.0 148.0 470.3
1.1 1.1 6.4 38.5
EQ ID
8.0 2.1 89.1 161.5
0.5 0.5 2.9 17.3 PGEX 03
2.0 - 16.6 25.9 PGEX 04
748% 196% 1388% 419%
417% 0% 576% 150% EQUIPMENT PER
EQ ID
PGDZ 01
Week 5
MTD
30-Aug 31-Aug 26 s.d 31
EQ ID
300 300 300 300
100 100 100 345 PG 2011
300 300 300 300 PG 2012
100 100 100 347 PG 2013
33% 33% 33% 115% PG 2014
33% 33% 33% 116% PG 2015
PG 2016
UNIT HAULING
PT. PG
Week 5 MTD TOTAL
30-Aug 31-Aug 26 s.d 31 1 s.d 25
96,089
5,000 - 13,130 FUEL
PLAN
ACTUAL
Week 5
MTD
30-Aug 31-Aug 26 s.d 31
9,722 EQUIPMENT
- - 1,233
EQ ID
PGGR 01
PGCM 01
Week 5 PGWT 03
MTD
30-Aug 31-Aug 26 s.d 31 EX 1102
73,492
- - 22,290
EQUIPMEN
EQ ID
PGLO 2203
PGLO 2204
Review Productio
3000
2500
2000
1500
1000
500
0
1-Aug 2-Aug 3-Aug 4-Aug
OB-Plan (Bcm)
6
5.9892
EQUIPMENT PERFORMANCE DIGGER
PA UA PRODUCTIVITY
TYPE
PLAN ACT ACH PLAN ACT ACH PLAN ACT
HITACHI 350 85% 97% 115% 59% 76% 129% 163 97.80
HITACHI 330 85% 75% 88% 59% 6% 10% - -
1000 2.0
1.0
500
-
1-Aug 2-Aug 3-Aug 4-Aug 5-A
0
1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug 7-Aug 8-Aug
Rain - Plan (Hrs) Rain - Act (Hrs
OB-Plan (Bcm) OB-Actual (Bcm) Slippery - Act (Hrs) % Rain
LOSS AND GAIN WEEKLY I AUGUST 2021
PLAN 60,000
MOHH 123.1
PA 85.0%
UA 59.0%
Prod'ty 163.0
Rain 8.6
Slippery 3.8 - 667
50,000 -
1,143
- 699
ACTUAL - 545
-
MOHH 97.3
50,648 4,026
PA 79.4%
UA 52.7% - -
PRODUCTION
ACH
105%
94%
113%
74%
88%
62%
eview Rain & Slippery Week 1 Average Distance Weekly
450.0
400.0
350.0
300.0
250.0
200.0
150.0
100.0
50.0
-
ug 3-Aug 4-Aug 5-Aug 6-Aug 7-Aug 8-Aug 1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug 7-Aug
Plan (Hrs) Rain - Act (Hrs) Slippery - Plan (Hrs) Avg. Dist-Plan Avg. Dist-Actual Accum-Plan
ry - Act (Hrs) % Rain % Slippery Accum-Actual Ach. Dist-Daily Ach. Dist-Acc
LOSS AND GAIN MONTHLY AUGUST 2021
PLAN 60000
MOHH 123.1
50000 0 4096.80726756368
PA 85.0% 0
UA 59.0% 40000
Prod'ty 140.0 0 1486.89579627497
0
30000
Rain -
Slippery - 20000
33563.4
6
ACTUAL 10000
MOHH 237.7 0
PA #DIV/0! Plan UA Rain -8463.17
Slippery
-10000 -17609.8662494947
UA #DIV/0!
Prod'ty 480.6 -20000
Rain -
Slippery - -30000
7.7744
Dist-Actual Accum-Plan
Dist-Daily Ach. Dist-Accum
ONTHLY AUGUST 2021
plan actual
0 0 0 MOHH 123.12 237.70
0 4096.80726756368
0 Rain 0 -
PA 85% #DIV/0!
UA 59% #DIV/0!
079627497
54052.7351991503 Prod'ty 140 481
Slippery - -
PRODUKSI - -
WH 330.00 250.00
UA Rain -8463.17201349426
Slippery PA Prod'ty Actual Maintenan 46.00 29
-17609.8662494947
Standby - 252.88 (41.30)
-
- -
123.12 237.7
Loss Total
- -
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 53388.53
- 21,030 41000
(4,602) 4,602 12388.53
- -
- -
#DIV/0!
(114.58)
-
#DIV/0!
#DIV/0!
- 340.59
-
-
0%
0%
Week 1 Week 2 Week 3 Week 4
Production
1 s.d 5 6 s.d 12 13 s.d 18 19-Jul 20-Jul 21-Jul
OB-Plan (Bcm) - - - - - -
OB-Actual (Bcm) 4,514 5,234 1,183 478 116 606
Coal-Plan (MT) - - - - - -
Coal-Actual (MT) - - - - - -
SR-Plan - - - - - -
SR-Actual - - - - - -
Act-OB 0% 0% 0% 0% 0% 0%
Act-Coal 0% 0% 0% 0% 0% 0%
Week 4 MTD
22-Jul 23-Jul 24-Jul 25-Jul 19 s.d 25 1 s.d 25
5.5 10.8 17.0 3.0 143.0 427.1
1.1 1.1 1.1 1.1 7.5 26.8
10.0 10.0 12.0 6.5 76.0 134.0
0.5 0.5 0.5 0.5 3.4 12.0
- - - 4.0 4.0 13.6
935% 935% 1121% 607% 1015% 501%
0% 0% 0% 833% 119% 113%
Week 4 MTD
22-Jul 23-Jul 24-Jul 25-Jul 19 s.d 25 1 s.d 25
300 300 300 300 300 300
100 100 100 100 100 195
300 300 300 300 300 300
100 100 100 100 100 194
33% 33% 33% 33% 33% 65%
33% 33% 33% 33% 33% 65%
Week 4 MTD
22-Jul 23-Jul 24-Jul 25-Jul 19 s.d 25 1 s.d 25
1,051.3 1,149.3 1,247.3 1,692.2 6,387.4 52536.49
0.0 0.0 0.0 0.0 - -
Week 4 MTD
22-Jul 23-Jul 24-Jul 25-Jul 19 s.d 25 1 s.d 25
-
0.0 200.0 0.0 0.0 200.0 3,211
Week 4 MTD
22-Jul 23-Jul 24-Jul 25-Jul 19 s.d 25 1 s.d 25
-
0.0 0.0 234.0 0.0 234.0 234
EQUIPMENT PERFORMANCE DIGGER
PA UA PRODUCTIVITY
EQ ID TYPE
PLAN ACT ACH PLAN ACT ACH PLAN
PGEX 03 HITACHI 350 85% 0% 0% 59% 0% 0% 163
PGEX 04 HITACHI 330 85% 95% 111% 59% 35% 59%
PLAN 20000
MOHH 123.1
PA 85.0% 429.6974
1978.67475048564
UA 59.0%
Prod'ty 15,892.5 0
0 518.471572640573
10000
Rain 20.0
Slippery 9.0
11438
ACTUAL
MOHH 97.3 0
PA 16.1% Plan UA-2640.1921008456
Rain Slip
UA 585.2%
Prod'ty 0.3
Rain -
Slippery - -10000
2.6243
GER
PRODUCTIVITY PRODUCTION
ACT ACH PLAN ACT ACH
3795.25 2328% 61556 15892.5 26%
PRODUCTION
ACT ACH
0 0%
266 6%
266 6%
AND GAIN WEEKLY I AUGUST 2021
plan
MOHH 123.12
429.697481632653
1978.67475048564 0 0 0 Rain 20
PA 85%
0
0 518.471572640573 UA 59%
Prod'ty 15,893
15642.2618427016
Slippery 9
11438
PRODUKSI -
WH 97.58
-1634.89
Plan UA-2640.1921008456
Rain Slippery PA Prod'ty
-1131.5109003624 Actual Maintenan 16.25
Standby 25.17
29.0
94.12
###
Gain Loss Total
- - -
- 41,982 (41,982)
- 24,605 (24,605)
- 805 (805)
661 - 661
2,482 - 2,482
- - -
Harus Sama" (64,249)
CONSUMPTION FUEL WEEK III FUEL CONSUMPTION JULY
2,500.0
35% 60000.00
30%
2,000.0 50000.00
25%
1,500.0
20% 40000.00
15%
1,000.0 30000.00
10%
5%
500.0 20000.00
0%
25-Jul - 10000.00
19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul 25-Jul
0.00
um PLAN ACTUAL MTD
LOSS AND GAIN MONTH
7.7744
MTD
LOSS AND GAIN MONTHLY JULI 2021
60000
0 0 0 MOHH
50000 04096.80726756368
0
Rain
40000 PA
01486.89579627497 UA
0
30000
54052.7351991503 Prod'ty
20000 Slippery
33563.4
PRODUKSI
10000
0 WH
Plan UA Rain -8463.17201349426
Slippery PA Prod'ty Actual Maintenan
-10000 -17609.8662494947
Standby
-20000
-30000
(41,079)
Com-Act Gain Loss Total
- - -
- 114,982 (114,982)
- 55,717 (55,717)
- 1,662 (1,662)
2,325 - 2,325
8,168 - 8,168
- - -
"Harus Sama" (161,868)
plan actual
234.44 237.70 (3.26)
103 109.00 (5.67)
85% 77% 8% 0%
59% 49% 10% 0%
140 105 34.85
46.50 - 46.50
### ### ###
330.00 250.00
46.00 29
- 141.56 (41.30)
-
149.8 109.0
84.61 128.7
53388.53
41000
12388.53
PIT Seam JIG ROM Washing Feed PLO Barging Remark
SNKR 3,653.00
SU 26,719.00 20,156.00 6,647.00 EHS
CLS SM 1,2 15,499.00
SL 1,2 14,673.00 LS
Total 60544 20,156.00 6,647.00 -
DMP 43,520.00 7,035.00 7,359.00 3,916.00
LS
AI Air Tawar 2,252.00
Total 45,772.00 7,035.00 7,359.00 3,916.00
CLS EHS 25,715.00
LS 14,673.00
40,388.00
AI EHS 0.00
LS 38,737.00
38,737.00
ASH SULFUR
ID TANGGAL JIG FEED JIG PRODUCT REJECT
FEED PRODUCT REJECT FEED
1 2 3 4 5 6 7 8 9
1 01 Juli 2021
2 01 Juli 2021
3 02 Juli 2021
4 02 Juli 2021
5 03 Juli 2021
6 03 Juli 2021
7 04 Juli 2021
8 04 Juli 2021
9 05 Juli 2021
10 05 Juli 2021
11 06 Juli 2021 1342 977 294 8.41 3.06
12 06 Juli 2021
13 07 Juli 2021 2934 2403 439
14 07 Juli 2021
15 08 Juli 2021 3884 3267 484 17.09 9.36 61.54
16 08 Juli 2021
17 09 Juli 2021 3838 3356 394 20.76 12.9 64.48 0.35
18 09 Juli 2021
19 10 Juli 2021 3943 3369 452 20.39 11.37 60.78 0.34
20 10 Juli 2021
21 11 Juli 2021
22 11 Juli 2021
23 12 Juli 2021
24 12 Juli 2021
25 13 Juli 2021
26 13 Juli 2021
27 14 Juli 2021
28 14 Juli 2021
29 15 Juli 2021
30 15 Juli 2021
31 16 Juli 2021
32 16 Juli 2021
33 17 Juli 2021
34 17 Juli 2021
35 18 Juli 2021 4215 3584 457 17.09 10.21 59.17 3.17
36 18 Juli 2021
37 19 Juli 2021
38 19 Juli 2021
39 20 Juli 2021
40 20 Juli 2021
41 21 Juli 2021
42 21 Juli 2021
43 22 Juli 2021
44 22 Juli 2021
45 23 Juli 2021
46 23 Juli 2021
47 24 Juli 2021
48 24 Juli 2021
49 25 Juli 2021
50 25 Juli 2021
51 26 Juli 2021
52 26 Juli 2021
53 27 Juli 2021
54 27 Juli 2021
55 28 Juli 2021
56 28 Juli 2021
57 29 Juli 2021
58 29 Juli 2021
59 30 Juli 2021
60 30 Juli 2021
61 31 Juli 2021
62 31 Juli 2021
20156 16956 2520 83.743333 46.9 245.9733 3.86
SULFUR ASH
Feedrate
PRODUCT F. Product Tailling
10 11 12 13
0.36
1 01 Juli 2021
2 01 Juli 2021
3 02 Juli 2021
4 02 Juli 2021
5 03 Juli 2021
6 03 Juli 2021
7 04 Juli 2021
8 04 Juli 2021
9 05 Juli 2021
10 05 Juli 2021
11 06 Juli 2021 690 0 977
12 06 Juli 2021
13 07 Juli 2021 0 0 2403
14 07 Juli 2021
15 08 Juli 2021 3267
16 08 Juli 2021
17 09 Juli 2021 3300
18 09 Juli 2021
19 10 Juli 2021 3369
20 10 Juli 2021
21 11 Juli 2021
22 11 Juli 2021
23 12 Juli 2021
24 12 Juli 2021
25 13 Juli 2021
26 13 Juli 2021
27 14 Juli 2021
28 14 Juli 2021
29 15 Juli 2021
30 15 Juli 2021
31 16 Juli 2021
32 16 Juli 2021
33 17 Juli 2021
34 17 Juli 2021
35 18 Juli 2021
36 18 Juli 2021
37 19 Juli 2021
38 19 Juli 2021
39 20 Juli 2021
40 20 Juli 2021
41 21 Juli 2021
42 21 Juli 2021
43 22 Juli 2021
44 22 Juli 2021
45 23 Juli 2021
46 23 Juli 2021
47 24 Juli 2021
48 24 Juli 2021
49 25 Juli 2021
50 25 Juli 2021
51 26 Juli 2021
52 26 Juli 2021
53 27 Juli 2021
54 27 Juli 2021
55 28 Juli 2021
56 28 Juli 2021
57 29 Juli 2021
58 29 Juli 2021
59 30 Juli 2021
60 30 Juli 2021
61 31 Juli 2021
62 31 Juli 2021
7359 0 6647
10637