France Vacancies project cost estimation

1. The project cost estimation is given in the description in the Assessment Brief.
2. The yearly benefits of implementing the system are also provided in the Assessment
Brief.
3. You need to create the cost estimation and benefits Excel spreadsheet similar to the
template provided (cost_estimate.xls file). Assuming that all software development
budget will include only payments for the services provided E-con company. The list
of the services is given in page 4 of the Assessment Brief. To distribute the cost
estimation proportionally for each project phase you can use (as an example ) a
picture

https://www.smashingmagazine.com/2009/06/effective-strategy-to-estimate-time-
for-your-design-projects/

Assume that the maintenance per year after implementing the system is $20,000.
The discount rate is 8%.

Your spreadsheet should also include the ROI, Payback and NPV calculations.