You are on page 1of 12

Department of Mechanical Engineering

School of Engineering and Architecture


Saint Louis University
Baguio City

ME 4141L: CONTROL ENGINEERING (LAB)

CLTD METHOD

COMPUTATION OF COOLING LOAD

BAGSAO, Yancy A.
FALLORINA, Brian F. November 19, 2021
Submitted by: Date Performed:
BSME- IV December 2, 2021
Course/Year: Date Due:
November 30, 2021
Date Submitted:

ENGR. MAURICE LICDAN


Instructor
FLOOR PLAN OF DESIGNED HOUSE
Construction
Components Value Units
Design
Tight,
ACH Energy- 0.35
efficient
Outdoor
95.54 ⁰F
Temperature

Indoor Design
69.8 ⁰F
Temperature

Room Height 9 ft
COMPUTATION OF SENSIBLE COOLING LOAD FROM INFILTRATION/VENTILATION
• Single Family Residence
• Located at Zambales, Philippines
• Month of May (Hottest month in Philippines)
• Design dry bulb temperature for the hottest month is 35.3 ⁰C (95.54 ⁰F)
• DB range for the hottest month is 5.3⁰C or 9.64⁰F (Low)
• Inside Desired Temperature Condition = 21⁰C (69.8 ⁰F)

I. Bedroom 1

Given:

▪ Area of the room = (3.5 m x 2.7 m) (3.28 ft) = 30.9960 ft2


▪ Height of the room = 9 ft (2.7439 m)
▪ ACH = 0.35

Solution:

q infil (Bedroom 1) = 0.33 ∙ 𝐴𝐶𝐻 ∙ 𝑉 ∙△ T


q infil (Bedroom 1) = (0.33)(0.35)(30.9960 𝑓𝑡 2 𝑥 9 𝑓𝑡)(95.54 − 69.8)⁰F
q infil (Bedroom 1) = 𝟖𝟐𝟗. 𝟑𝟓𝟏𝟔 𝐁𝐓𝐔
II. Bedroom 2

Given:

▪ Area of the room = (3.7 m x 2.7 m) (3.28 ft) = 32.7672 ft2


▪ Height of the room = 9 ft (2.7439 m)
▪ ACH = 0.35
Solution:
q infil (Bedroom 1) = 0.33 ∙ 𝐴𝐶𝐻 ∙ 𝑉 ∙△ T
q infil (Bedroom 1) = (0.33)(0.35)(32.7672 𝑓𝑡 2 𝑥 9 𝑓𝑡)(95.54 − 69.8)⁰F
q infil (Bedroom 1) = 𝟖𝟕𝟔. 𝟕𝟒𝟑𝟏 𝐁𝐓𝐔

III. Bedroom 3
Given:

▪ Area of the room = (3.55 m x 3.1 m) (3.28 ft) = 36.0964 ft2


▪ Height of the room = 9 ft (2.7439 m)
▪ ACH = 0.35
Solution:

q infil (Bedroom 1) = 0.33 ∙ 𝐴𝐶𝐻 ∙ 𝑉 ∙△ T


q infil (Bedroom 1) = (0.33)(0.35)(36.0964 𝑓𝑡 2 𝑥 9 𝑓𝑡)(95.54 − 69.8)⁰F
q infil (Bedroom 1) = 𝟗𝟓𝟔. 𝟖𝟐𝟏𝟔 𝐁𝐓𝐔

IV. Comfort Room

Given:

▪ Area of the room = (3.7 m x 2.45 m) (3.28 ft) = 29.7332 ft2


▪ Height of the room = 9 ft (2.7439 m)
▪ ACH = 0.35
Solution:

q infil (Bedroom 1) = 0.33 ∙ 𝐴𝐶𝐻 ∙ 𝑉 ∙△ T


q infil (Bedroom 1) = (0.33)(0.35)(29.7332 𝑓𝑡 2 𝑥 9 𝑓𝑡)(95.54 − 69.8)⁰F
q infil (Bedroom 1) = 𝟕𝟗𝟓. 𝟓𝟔𝟑𝟐 𝐁𝐓𝐔

V. Living Room
Given:

▪ Area of the room = (9.85 m x 3.7 m) (3.28 ft) = 119.5396 ft2


▪ Height of the room = 9 ft (2.7439 m)
▪ ACH = 0.35
Solution:
q infil (Bedroom 1) = 0.33 ∙ 𝐴𝐶𝐻 ∙ 𝑉 ∙△ T
q infil (Bedroom 1) = (0.33)(0.35)(119.5396 𝑓𝑡 2 𝑥 9 𝑓𝑡)(95.54 − 69.8)⁰F
q infil (Bedroom 1) = 𝟑𝟏𝟗𝟖. 𝟒𝟖𝟖𝟖 𝐁𝐓𝐔

VI. Kitchen

Given:

▪ Area of the room = (7.8 m x 3.5 m) (3.28 ft) = 89.544 ft2


▪ Height of the room = 9 ft (2.7439 m)
▪ ACH = 0.35
Solution:

q infil (Bedroom 1) = 0.33 ∙ 𝐴𝐶𝐻 ∙ 𝑉 ∙△ T


q infil (Bedroom 1) = (0.33)(0.35)(89.544 𝑓𝑡 2 𝑥 9 𝑓𝑡)(95.54 − 69.8)⁰F
q infil (Bedroom 1) = 𝟐𝟑𝟖𝟐. 𝟖𝟕𝟑𝟑 𝐁𝐓𝐔
VII. HVAC

Given:

▪ Area of the room = (1.4 m x 0.75 m) (3.28 ft) = 3.444 ft2


▪ Height of the room = 9 ft (2.7439 m)
▪ ACH = 0.35
Solution:

q infil (Bedroom 1) = 0.33 ∙ 𝐴𝐶𝐻 ∙ 𝑉 ∙△ T


q infil (Bedroom 1) = (0.33)(0.35)(3.444 𝑓𝑡 2 𝑥 9 𝑓𝑡)(95.54 − 69.8)⁰F
q infil (Bedroom 1) = 𝟗𝟏. 𝟔𝟒𝟗𝟎 𝐁𝐓𝐔

𝑞𝑖𝑛𝑓𝑖𝑙(𝑡𝑜𝑡𝑎𝑙)= 829.3516 BTU + 876.7431 BTU + 956.8216 BTU + 795.5632 BTU


+ 3198.4888 BTU + 2382.8733 BTU + 91.6490 BTU

𝑞𝑖𝑛𝑓𝑖𝑙(𝑡𝑜𝑡𝑎𝑙) =𝟗𝟏𝟑𝟏.𝟒𝟗𝟎𝟔 𝑩𝑻𝑼


COMPUTATION OF SENSIBLE COOLING LOAD FROM INTERNAL HEAT GAINS (FOR THE
WHOLE BUILDING)

Given Data:
• Single Family Residence
• Located at Zambales, Philippines
• Month of May (Hottest month in the Philippines)
• Design dry bulb temperature for the hottest month is 35.3 ⁰C
• DB range for the hottest month is 5.3 ⁰C or 9.64 ⁰F (Low)
• Inside Desired Temperature Condition = 21 ⁰C (69.8 ⁰F)
• Number of Persons in the house = 4 Persons
• Cooling load per person = 230 BTU/hr/person
• Relative humidity desired inside the building = 40 %
• Cooling load of appliances for whole building = 1600 BTU/hr/person

Solution:
q Internal Heat Gain (Whole Building) = (# of occupants)(cooling load per person) +
cooling load of appliances for whole building

𝐵𝑇𝑈
q Internal Heat Gain (Whole Building) = (4 persons) (230 /𝑝𝑒𝑟𝑠𝑜𝑛) + 1600 BTU/hr
ℎ𝑟

q Internal Heat Gain (Whole Building) = 𝟐𝟓𝟐𝟎 𝐁𝐓𝐔


COMPUTATION OF COOLING LOAD FROM MOISTURE (LATENT LOAD)

Given Data:
• Single Family Residence
• Located at Luzon Island, Philippines
• Month of May (Hottest month in the Philippines)
• Design dry bulb temperature for the hottest month is 35.3 ⁰C(
• DB range for the hottest month is 5.3 ⁰C or 9.64 ⁰F (Low)
• Inside Desired Temperature Condition = 21 ⁰C (69.8 ⁰F)
• Number of Persons in the house = 4 Persons
• Cooling load per person = 230 BTU/hr/person
• Relative humidity desired inside the building = 40 %
• Cooling load of appliances for whole building = 1600 BTU/hr/person
• Humidity Ratio (W) from Psychrometric Chart = 0.001437 lb /lb da
• Actual LF is less than 2% from the computed LF

Solution:
LF = 0.58 + 42W
lb
LF = 0.58 + (42)(0.001437 )
lb𝑑𝑎
LF = 𝟎. 𝟔𝟒𝟎𝟒

Actual LF = LF − 0.02LF
Actual LF = 0.6404 − 0.02(0.6404)
Actual LF = 𝟎. 𝟔𝟐𝟕𝟔

Total Sensible Load


= Total Cooling Load Transmission
+ Total Cooling Load Infiltration/Ventilation
+ Total Cooling Load from Internal Heat Gain
Total Sensible Load
= (4424.3404 BTU + 6294.406 BTU + 4356.5936 BTU
+ 3700.653 BTU + 13425.6114 BTU + 6501.2747 BTU
+ 1092.3996 BTU) + (9131.4906 BTU) + (2520 BTU)
Total Sensible Load = 51,446.7366 BTU

Total Latent Load = Total Sensible Load x Actual LF


Total Latent Load = 51,446.7366 BTUx 0.6276
Total Latent Load = 𝟑𝟐𝟑𝟎𝟎. 𝟓𝟐𝟑𝟗 𝐁𝐓𝐔
COMPUTATION OF TOTAL COOLING LOAD (WHOLE BUILDING)

Given Data:
• Total Sensible Load = 51,446.7366 BTU
• Total Latent Load = 32,300.5239 BTU

Solution:
Total Cooling Load = Total Sensible Load + Total Latent Load
Total Cooling Load = 51,446.7366 BTU + 32,300.5239 BTU

Total Cooling Load = 𝟖𝟑, 𝟕𝟒𝟕. 𝟐𝟔𝟎𝟓 𝐁𝐓𝐔