Professional Documents
Culture Documents
ATTENTION: BAI
REPAIR WORKS
1. A)To dismental pattion and glass 600 sqft, redo the RM 1950.00
damage wall and clear the debris from site
TOTAL RM 1950.00
------------------------- -----------------------------