Review Document Description: Submittal

Review Document Submittal Ref: C2020/45-MAR-QM-00096 Revision No. 2

Response by: Submission Date

Review Reference: Review/Comment Date

Consent Classification:

Category: Cat 4: major comment Cat 3: technical comment Cat 2: non-technical comment Cat 1: important for future submissions Cat 0: Observation/Note

Reviewer

Category
No Reference Consultant Comments Contractor's Response PORR CDM Smith
Closed/Open Closed/Open

Subject to maintain the Valid Registrations of Manufacturer & Noted. Commercial registration and trade License
1 Valid Registrations Installer, as per Authorities Requirement and compliance with the Umer Cat 4 Certificates are being maintained. Refer Attached CR & Closed Closed
Contract Terms & Conditions. trace License certificate in Section-8

Adherance to QCS 2014 Section 16 , Project Specifications & BoQ Noted And Material are complied as per QCS 2014 Section-
2 Umer Cat 4 Closed Closed
must be ensured. 16 Part 2 and Project specification

Noted and All the work Execution are followed as per


Work execution shall be in accordance with IFC drawings approved
3 shop drawings and manufacturer technical data sheets. Umer Approved Shop drawings,IFC Drawings and Project Closed
Compliance Specification
Cat 4
Fabrication Inspection Request for underbelly subframe of
3.1 Provide reference document of fabrication approval. Franklyn EC-50 pedestrian bridge was carried out kindly refer to INR Closed
No: C2020/45-EC-50-WIR-AR-00433.

Mock up to be conducted to verify the compliance with project Noted mock up inspection Will be arrange during
4 Umer Closed
requirements and overall quality of work. Fabrication/Site
Mock-Ups Cat 3
Noted, mock-up inspection was carried out kindly refer to
4.1 Provide reference document of Mock up approval. Franklyn INR no: C2020/45-EC-50-WIR-AR-00496. Closed

566393964.xlsx Page 1 of 4
Review Document Description: Submittal

Review Document Submittal Ref: C2020/45-MAR-QM-00096 Revision No. 2

Response by: Submission Date

Review Reference: Review/Comment Date

Consent Classification:

Category: Cat 4: major comment Cat 3: technical comment Cat 2: non-technical comment Cat 1: important for future submissions Cat 0: Observation/Note

Reviewer

Category
No Reference Consultant Comments Contractor's Response PORR CDM Smith
Closed/Open Closed/Open

Noted and Coating thickness will be Followed as per


5 DFT to be followed as per Design drawing General notes. Umer Approved Paint System Closed

Cat 4 Reference MAR : C2020_45-MAR-QM-00034 is not


Coating shall be in compliance with the comments & requirements applicable for this submittal.
5.1 Franklyn Closed
mentioned on document C2020/45-MAR-QM-00034. Staircase structure is protective coated and underbelly/lift
ACP sub-structure part are hot dip galvanized.

Protective Coating
Coating repair to be followed as per QCS 2014, Section 16, part 10 Noted And Coating Repair will be Followed as per QCS 2014
6 Clause 10.3.3 & 10.3.4. Umer Section 16 Part 10 and approved Method statement Closed

Cat 3
Galvanization procedures & touch-ups shall be as per QCS 2014, Noted. Shall be followed QCS/other international
6.1 Franklyn Closed
Section 16, Part 10, Clause 10.4 recommended procedure for galvanization and touch up.

Storage and handling procedures shall ensure that damage to the Noted and Storage and Handling are followed as per Paint
7 Umer Cat 2 Closed Closed
protective system is minimised. Manufacturer recommendation.

Routine sampling and testing to be followed as per QCS 2014 Section Noted and sampling will be select and submit During
8 Umer Closed
2, part 14 . Material Inspection

Sampling and Testing Cat-4

566393964.xlsx Page 2 of 4
Review Document Description: Submittal

Review Document Submittal Ref: C2020/45-MAR-QM-00096 Revision No. 2

Response by: Submission Date

Review Reference: Review/Comment Date

Consent Classification:

Category: Cat 4: major comment Cat 3: technical comment Cat 2: non-technical comment Cat 1: important for future submissions Cat 0: Observation/Note

Reviewer

Category
No Reference Consultant Comments Contractor's Response PORR CDM Smith
Closed/Open Closed/Open

Sampling and Testing Cat-4 Sampling and testing was carried out under INR reference
no: C2020/45-EC-50-WIR-ST-00077, However overall steel
8.1 Provide reference document of sampling & testing carried out. Franklyn structure sampling and testing shall be meet as per QCS Closed
requirements.

Material delivered to the site must be in compliance with QCS 2014


9 Material Delivery
and as per approved drawings.
Umer Cat-4 Noted Closed Closed

Contractor to submit corresponding method statement and ITP for Noted. Method statement and ITP will be submit
10 Method statement
approval.
Umer Cat-4 separately. Reference Number:C2020/45-MST-QM-00039 Closed Closed

Manufacturer in house Qa/Qc documents Shall be availed with


material delivery. Noted and Material Dossier will be Provide During Delivery
11 Documents and Test Results Umer Cat 4 Closed Closed
to site

566393964.xlsx Page 3 of 4
Consent and Withholding of Consent to Submissions

The Engineer's Decision on documents submitted for his consent shall follow the classification below:

Decision "I": As CDM Smith is not yet employed in the capacity of Supervision Consultant on the Artscape works,
a review has been performed on the this submittal for information only. This review is only for the
general conformance of the submittal, based upon the information available in the Project
documentation. Any errors, omissions and/or deviation from the project shall not relieve the
Contractor of his responsibility under the Contract.