Survey Inspection Checklist

Page 1 of 1 JOKA-MAJERHAT Metro Project, RVNL Format No.:INF-RIL-RVNL-BLTSRV-001-00

Project :Construction of Double Line Ballastless Track (BLT) for Elevated Viaduct from Approach of Joka Depot having Ch. (-) 1823.985 to beyond Majerhat metro station, up to
Ch. 8038.559 including points and crossings, etc. in connection with construction of Metro Railway Corridor from Joka to Majerhat, in the city of Kolkata.”.

Client : RAIL VIKAS NIGAM LIMITED


Contractor : RAHEE INFRATECH LIMITED
Drawing Nos:
REFERENCE TBM : LINE:

Offset from Track


Rail Level As Cable trench Top Applicable
Sr. No. Chainage Plinth No. Actual Level Centre (+1005 SE Remarks
Per GAD level (+25 mm) Tolerance
mm)

Name

Signature

RIL's Representative RVNL's Representative