SAFETY CHECKLIST FOR CASTING

Page 1 of 1 Format No.: INF-RIL-RVL-BLTSC-008-00

: Construction of Double Line Ballastless Track (BLT) for Elevated Viaduct from Approach of Joka Depot having
Project Ch. (-) 1823.985 to beyond Majerhat metro station, up to Ch. 8038.559 including points and crossings, etc. in
connection with construction of Metro Railway Corridor from Joka to Majerhat, in the city of Kolkata.”.

Client : RAIL VIKAS NIGAM LIMITED


Contractor : RAHEE INFRATECH LIMITED
Sl No. Activity Paticulars Yes No N/A
Approved Formwork design/drawing /sketch.
1
Adequate Surface /Bed preparation for staging as per site condition.
2
Formwork Materials quality checked.
3
Gaps between primary & secondary members closed.
4
5 Safe Access & Ingress Constructed.
Adequate lighting is available at casting area.
6
Before Starting pouring ,all workers removed except required no. of
7 carpenters nearby slab soffit.
8 Concrete pipe line scaffolding checked.
9 All staging panels are interlocked.
Hard Barricading /Lifeline is available all around the periphery of
10 the slab.
11 TBT Conducted at the selected area
12 Before Pouring ,all staging checked by comptent person.
13 Workers are inducted for casting/concrete work.
14 Necessary clearance are taken/Work Permit.
15 All Workers with Proper PPES.
16 Traffic Marshals are available.
17 Proper Illumination is available at Batching Plant area.
18 Millers are in good condition.
19 Any Environment impact by Concrete Chemical/water.
20 Miller are washing in designed place.

Date:
Signature:

RIL's Representative RVNL's Representative