You are on page 1of 1

TERRENO SECTOR SEGUNDA CELDA DE FLOTACIÓN ROUGHER ÁREA FLOTACIÓN COLUMNAR

GABINETE 4250 - PLC - 0001A

CAJA DE CONEXIÓN 4230 - JBI - 0001

4230- HV- 3220

TS02-1
TS02-2
TS02-3 4230HV3220-L
4230HV3220-N
4230HV3220-TP

4230 - FISL - 3220


TS03-2
TS03-1
TS03-3 4230FISL3220-C 1
4230FISL3220-NO 1
4230FISL3220-NC

Firmado Digitalmente 26-02-2021


Ing Coordinador Disciplina R.T/E.G
Gerente de Ingenieria P.V.
Gerente del Proyecto J.L

THIS DRAWING WAS PREPARED FOR THE EXCLUSIVE USE OF MANTOS COPPER (“CLIENT”) AND IS ISSUED PURSUANT TO CONTRACT BETWEEN CLIENT AND OHLI.
UNLESS OTHERWISE AGREED IN WRITTING WITH CLIENT OR SPECIFIED ON THIS DRAWING, (A) OHLI DOES NOT ACCEPT AND DISCLAIMS ANY AND ALL LIABILITY OR RESPONSIBILITY AIRISING
FROM ANY USE OF OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY OR ANY MODIFICATION OR MISUSE OF THIS DRAWING BY CLIENT, AND (B) THIS DRAWING IS CONFIDENTIAL AND MANTOS BLANCOS
ALL INTELLECTUAL PROPERTY RIGHTS EMBODED OR REFERENCED IN THIS DRAWING REMAIN THE PROPERTY OF OHLI.

. . . . . . . . . E. CONSTANZO 18-FEB-2021
. . . . . . . . . C. FONSECA 18-FEB-2021
MANTOS BLANCOS DEBOTTLENECKING PROJECT
. . . . . . . . . . EPC CONTRACT
. . . . . . . . . E. GOMEZ 18-FEB-2021
. . . . . . . . . A. LAZO 18-FEB-2021 DIAGRAMA DE LAZO INSTRUMENTACIÓN
. . . . . . . . . H. CALLE 18-FEB-2021 FLUJO BAJOAGUA DE SELLO BOMBA 4220-PU-3003
. . 1 EMITIDO PARA CONSTRUCCIÓN E.C. C.F. A.L. J.L. 18-FEB-2021
. . 0 EMITIDO PARA CONSTRUCCIÓN M. D. R. H. A. L. H. C. 07-05-2020 . .
E-0020-4250-INS-SLD-001 DIAGRAMA UNILINEAL ÁREA CONCENTRADORA A EMITIDO PARA REVISION INTERNA M.D. R.H. A.L. D.J. 11-01-2020
E-0020-4230-INS-LPD-002
1
MBDP05-4230-INS-LPD-0002