You are on page 1of 2

TOP DOWN SURALLAH PAPAYA

MATERIALS

ANGLE BAR 4MMx2 = 2PCS.

FLAT BAR 4MMx2= 3PCS.

FLAT BAR 3/8x ½= 20FT

GI PIPE #1-G-40 =4PCS.

GI PIPE H ½=G40 = 8PCS .

PLAIN BAR = 16MM= 1L

1 SET SPRING. COMET 3

2 MOTHER SPRING

1SET SIDE WHEEL = NO.12

BOLT

7/16X 3 ½= 7PCS

7/16 X 2 ½ = 6PCS

7/16X 1 = 4PC S

5/8 X 4 =1PC

3/8 X 3 ½ = 1PC

3/8 X 2 = 1PC

RUBBBER BOSHING = 7PCS

W-ROD N55 =6KLS.

CUTTING DISK NO.4 15PCS

LABOR PHP. 10,000.00


STAINLESS TOP DOWN BREADS AND BLENDS

MATERIALS

PLAIN SHEET = 1.O 4PCS (STEEL SHEET)

ANGLE BAR 4MM= 2PCS.

ANGLE BAR- 3/16X1= 7PCS

PLAIN BAR 16MM= 1L

1 SET SPRING COMET 3

2 MOTHER SPRING

1 SET SIDE WHEEL NO.12

FLAT BAR 3/8 X1 ½ = 10FT.

BOLT

7/16X 3 ½= 7PCS.

7/16X 2 ½ = 6PCS

7/16 X 3 ½ = 1PC

5/8 X 4= 4PCS.

W-ROD STAINLESS 2KLS.

W-ROD N555= 6KLS

CUTTING DISC = 10PCS NO.4

RUBBER BOSHING = 7PCS

G-1 PIPE #1-G 40 4PCS

G-1 PIPE # ½ G40 = 4PCS

LABOR COST PHP. 16,000.00

You might also like