PROJECT:
Sentral Riveria Brickfields
Glostrext Instrumentation Method : A novel technology empowering You to make decisions based on Facts
CONTENTS
Page
1. Introduction 1
1. INTRODUCTION
This report presents the results of static axial compression load tests carried out on the
instrumented bored pile, called PTP2, at the above mentioned proposed site.
The pile has a nominal diameter of 900 mm and a penetration depth of 10.705 m from piling
platform level. The pile was to be tested to 18900 kN (3 x WL) or failure load whichever
comes first, in the test programme.
The main objective of the instrumented load test is to establish / verify the following for the
use in the design of working piles which are to be constructed in soil strata having similar
geological structure and by adopting similar construction practices :-
(i) To determine/confirm the bearing capacity of bored pile and its apportionment
into shaft friction for various soil/rock strata and end bearing;
(ii) To evaluate the design parameters in relation to the ultimate shaft friction and
end bearing; and
(iii) To study the behaviour of pile settlement and structural shortening under the applied
loads.
The load-movement relationship, the distribution of axial load along the pile and the load
transfer characteristics of the pile will be presented and discussed in details in this test report.
Results will be presented both in tabulated and graphical formats for easy discussion.
1
2. LOCATION OF TEST PILE AND SUBSURFACE CONDITIONS
Test pile location plan, installation record (including description of actual subsurface
condition encountered during boring) and relevant SI borehole information at the proposed
site are attached in Appendix A for ease of reference.
2
Ext. Lev 2a & 2b at interval from 1.5 m to 6.5 m depth;
Ext. Lev 3a & 3b at interval from 6.5 m to 7.5 m depth;
Ext. Lev 4a & 4b at interval from 7.5 m to 9.7 m depth and
Ext. Lev 5a & 5b at interval from 9.7 m to 10.7 m depth accordingly.
During static load testing, deformation of the pile under loading produces relative movement
between each and every two anchored intervals causing a change in the strain gauge wire
tension in the vw precision transducers and a corresponding change in its resonant frequency
of vibration. The resonant frequency is measured by plucking the Glostrext sensors to readout
box / datalogger, which also measures the frequency and displays the shortening reading and
strain reading.
3
3.3 PILE MOVEMENT MONITORING SYSTEM
The pile top settlement was monitored using the following instruments:
(i) Vertical scale rules fixed to pile top sighted by a precise levels with
micrometer attached, with the use of TBM reference for correction purposes;
and
(ii) 4 nos of Linear Variation Displacement Transducers (LVDTs) mounted to the
reference beams, with plunger pressing vertically against glass plates fixed to
pile top. Vertical scales were also provided on the reference beams to monitor
any movement during load testing.
4
datalogger is given in Appendix E). The large quantity of high quality data collected
from these instruments is able to produce reliable information for meaningful
interpretation.
5
strain gauge readings and estimated pile properties (steel content, cross-section areas
and modulii of elasticity). Computations made for test pile are based on as-built
details (including concreting record) known from the construction record.
For the test pile, the concrete pile modulus, Ec was back-calculated by measuring the global
strains near the pile top (collar casing debonded level from interval from 0.5 m to 1.5 m for
this case, sensor 1a & 1b) and the pile top loads. For each stage of loading, Ec is back-
calculated by assuming that the load at the level A is equal to the applied load at the pile top.
The values obtained for the loading stages of the test cycle are given in Table S1. Ec values
are also known to be strain dependant, therefore the back-calculated concrete values for test
pile are plotted against measured strain in Figure Ec (i) to obtain best fit curve to further
increase the accuracy of analysis. The difference between the loads at any two levels
represents the shaft load carried by the portion of pile between the two levels.
6
GL to Level B (4.0m depth bgl) :
At 6362 kN (1st Cycle) pile top load, fs attained was 78.0 kN/m2, at 12664 kN (2nd
Cycle) fs was 171.4 kN/m2 and at 18863 kN (3rd Cycle) fs was 286.1 kN/m2 .
7
TABLES
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
Table T1a:
Summary Of Pile Top Settlement, Pile Base Settlement & Total Pile Shortening.
(2nd Cycle)
20/08/2019 15:50 0 1.58 0.09 1.49
20/08/2019 16:57 3367 4.34 0.87 3.47
20/08/2019 17:58 6368 6.02 1.58 4.44
20/08/2019 19:00 7947 7.32 1.97 5.35
20/08/2019 19:58 9373 8.96 2.35 6.61
20/08/2019 20:56 10881 10.72 2.77 7.95
21/08/2019 20:57 12664 14.82 3.43 11.39
21/08/2019 21:38 9653 14.11 2.87 11.24
21/08/2019 22:08 6272 12.66 2.09 10.57
21/08/2019 22:42 3023 10.41 1.18 9.22
22/08/2019 04:53 0 6.59 0.25 6.34
(3rd Cycle)
22/08/2019 04:53 0 6.59 0.25 6.34
22/08/2019 05:52 3239 9.25 1.12 8.13
22/08/2019 06:52 6474 11.62 1.96 9.66
22/08/2019 07:52 9296 13.26 2.64 10.63
22/08/2019 08:54 12457 15.32 3.38 11.94
22/08/2019 09:59 13930 16.63 3.75 12.87
22/08/2019 10:58 15512 18.39 4.18 14.21
22/08/2019 11:58 17091 20.94 4.63 16.32
23/08/2019 00:38 18863 25.12 5.28 19.84
23/08/2019 01:26 15788 24.68 4.71 19.97
23/08/2019 02:10 12377 23.42 3.96 19.46
23/08/2019 02:48 9552 22.29 3.27 19.02
23/08/2019 03:24 6512 20.68 2.47 18.21
23/08/2019 04:34 3414 18.25 1.55 16.71
23/08/2019 10:40 0 13.00 0.39 12.61
T-1a
Static Load Test On Instrumented Test Pile PTP2
Table T-1b :
Summary Of Average Pile Top Settlement From Corrected LVDTs And Scale Readings
Date/Time Total Total Pile Top Pile Top Pile Top Pile Top Scale Scale Reference Scale Level Corrected Scale Scale Corrected Average
Load Pile Top LVDT LVDT LVDT LVDT Reading Reading Beam Reading Station Total Pile Top Reading Reading Total Pile Top Corrected
Settlement S1 S2 S3 S4 R1 R1 Movement TBM 1 Movement Settlement T1 T2 Settlement Total Pile Top
(kN) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) Settlement
(Fr LVDTs) (Fr Precise (mm)
Level)
(1st Cycle)
19/08/2019 16:08 0 0.00 0.00 0.00 0.00 0.00 52.30 48.10 0.00 62.10 0.00 0.00 20.40 22.30 0.00 0.00
19/08/2019 17:12 1783 1.25 1.09 1.21 1.38 1.32 52.50 48.40 0.25 62.10 0.00 1.50 21.75 23.70 1.38 1.44
19/08/2019 18:13 3320 2.35 2.06 2.20 2.53 2.61 52.50 48.50 0.30 62.10 0.00 2.65 22.70 25.00 2.50 2.58
19/08/2019 19:15 4851 3.67 3.22 3.32 4.04 4.08 52.60 48.20 0.20 62.20 -0.10 3.77 24.10 26.10 3.65 3.71
20/08/2019 07:09 6362 5.15 4.50 4.58 5.74 5.78 52.75 48.65 0.50 62.30 -0.20 5.45 25.75 27.90 5.28 5.36
20/08/2019 07:40 4689 4.60 4.02 4.17 5.09 5.13 52.50 48.40 0.25 62.30 -0.20 4.65 25.00 27.10 4.50 4.58
20/08/2019 08:10 2976 3.78 3.28 3.41 4.19 4.23 52.30 48.40 0.15 62.30 -0.20 3.73 24.15 26.20 3.63 3.68
20/08/2019 08:40 1559 2.94 2.51 2.60 3.29 3.34 52.50 48.40 0.25 62.20 -0.10 3.09 23.50 25.45 3.03 3.06
20/08/2019 15:50 0 1.74 1.65 1.57 1.83 1.91 52.10 48.00 -0.15 61.95 0.15 1.74 21.60 23.65 1.43 1.58
(2nd Cycle)
20/08/2019 15:50 0 1.74 1.65 1.57 1.83 1.91 52.10 48.00 -0.15 61.95 0.15 1.74 21.60 23.65 1.43 1.58
20/08/2019 16:57 3367 4.03 3.20 4.08 4.18 4.67 52.50 48.10 0.10 61.80 0.30 4.43 23.95 26.65 4.25 4.34
20/08/2019 17:58 6368 5.73 4.53 5.77 5.94 6.69 52.30 48.50 0.20 61.80 0.30 6.23 25.30 28.40 5.80 6.02
20/08/2019 19:00 7947 7.20 5.85 7.22 7.46 8.26 52.50 48.30 0.20 61.80 0.30 7.70 26.60 29.40 6.95 7.32
20/08/2019 19:58 9373 8.96 7.47 8.83 9.35 10.20 52.00 48.30 -0.05 61.80 0.30 9.21 28.10 31.40 8.70 8.96
20/08/2019 20:56 10881 11.14 9.51 10.84 11.69 12.52 52.10 48.40 0.05 62.00 0.10 11.29 30.15 32.65 10.15 10.72
21/08/2019 20:57 12664 15.22 13.42 14.69 15.97 16.78 51.95 47.90 -0.28 62.00 0.10 15.04 34.35 37.35 14.60 14.82
21/08/2019 21:38 9653 14.14 12.62 13.63 14.82 15.51 52.30 48.20 0.05 62.00 0.10 14.29 33.55 36.80 13.93 14.11
21/08/2019 22:08 6272 12.59 11.00 12.13 13.25 13.98 52.40 48.20 0.10 62.00 0.10 12.79 32.25 35.30 12.53 12.66
21/08/2019 22:42 3023 10.14 8.58 9.81 10.75 11.42 52.70 48.50 0.40 61.90 0.20 10.74 29.75 32.70 10.08 10.41
22/08/2019 04:53 0 5.71 5.27 5.25 6.05 6.26 52.70 48.40 0.35 61.90 0.20 6.26 26.85 29.30 6.93 6.59
(3rd Cycle)
22/08/2019 04:53 0 5.71 5.27 5.25 6.05 6.26 52.70 48.40 0.35 61.90 0.20 6.26 26.85 29.30 6.93 6.59
22/08/2019 05:52 3239 8.77 7.67 7.99 9.52 9.89 52.50 48.50 0.30 61.90 0.20 9.27 29.25 31.50 9.23 9.25
22/08/2019 06:52 6474 11.13 9.76 10.27 11.95 12.55 52.50 48.30 0.20 61.90 0.20 11.53 31.80 33.90 11.70 11.62
22/08/2019 07:52 9296 12.98 11.51 12.01 13.88 14.52 52.30 48.30 0.10 61.80 0.30 13.38 33.00 35.40 13.15 13.26
22/08/2019 08:54 12457 15.28 13.82 14.16 16.28 16.88 52.25 48.25 0.05 61.80 0.30 15.63 34.80 37.30 15.00 15.32
22/08/2019 09:59 13930 16.90 15.48 15.65 17.97 18.51 51.90 47.60 -0.45 61.70 0.40 16.85 36.10 38.60 16.40 16.63
22/08/2019 10:58 15512 19.25 17.96 17.81 20.41 20.83 51.80 47.40 -0.60 61.80 0.30 18.95 37.90 39.85 17.83 18.39
22/08/2019 11:58 17091 22.09 20.93 20.37 23.46 23.59 51.60 47.20 -0.80 61.90 0.20 21.49 40.55 42.55 20.40 20.94
23/08/2019 00:38 18863 26.78 25.79 24.67 28.47 28.22 51.30 47.20 -0.95 62.20 -0.10 25.73 44.90 47.00 24.50 25.12
23/08/2019 01:26 15788 25.63 24.65 23.65 27.23 26.98 51.60 47.50 -0.65 62.20 -0.10 24.88 45.05 46.80 24.48 24.68
23/08/2019 02:10 12377 24.16 23.00 22.26 25.81 25.58 51.80 47.80 -0.40 62.10 0.00 23.76 43.75 45.10 23.08 23.42
23/08/2019 02:48 9552 22.73 21.54 20.94 24.31 24.13 52.10 47.80 -0.25 62.10 0.00 22.48 42.60 44.30 22.10 22.29
23/08/2019 03:24 6512 20.86 19.63 19.25 22.34 22.20 52.10 47.90 -0.20 62.00 0.10 20.76 40.90 42.80 20.60 20.68
23/08/2019 04:34 3414 18.21 17.06 16.81 19.59 19.37 52.20 48.10 -0.05 61.90 0.20 18.36 38.60 40.00 18.15 18.25
23/08/2019 10:40 0 12.46 11.85 11.46 13.47 13.05 52.70 48.20 0.25 61.90 0.20 12.91 33.65 34.85 13.10 13.00
Note : +ve value denotes settlement, and -ve value denotes heave
T-1b
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
Table T2a :
Summary Of Vibrating Wire Glostrext Extensometer Readings and
Pile Settlement at Various Extensometer Levels
Date/ Total Ave. Structural Ave. Structural Ave. Structural Ave. Structural Ave. Structural Total Total Total Pile Total Pile Total Pile Total Pile Total Pile
Time Load Shortening Shortening Shortening Shortening Shortening Shortening Pile Top Settlement at Settlement at Settlement at Settlement at Settlement at
From VW From VW From VW From VW From VW From VW Settlement Extensometer Extensometer Extensometer Extensometer Extensometer
Extensometer Extensometer Extensometer Extensometer Extensometer Extensometer Level 1 Level 2 Level 3 Level 4 Level 5 (toe)
Sensor 1a, 1b Sensor 2a, 2b Sensor 3a, 3b Sensor 4a, 4b Sensor 5a, 5b (whole pile) (1.5m depth) (6.5m depth) (7.5m depth) (9.7m depth) (10.7m depth)
(kN) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
(1st Cycle)
19/08/2019 16:08 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19/08/2019 17:12 1783 0.06 0.25 0.03 0.03 0.00 0.36 1.44 1.38 1.13 1.11 1.08 1.07
19/08/2019 18:13 3320 0.12 0.50 0.05 0.06 0.01 0.75 2.58 2.46 1.95 1.90 1.84 1.83
19/08/2019 19:15 4851 0.20 0.75 0.08 0.10 0.01 1.14 3.71 3.51 2.76 2.68 2.58 2.56
20/08/2019 07:09 6362 0.27 1.04 0.12 0.15 0.02 1.60 5.36 5.09 4.05 3.93 3.78 3.76
20/08/2019 07:40 4689 0.23 0.84 0.09 0.11 0.02 1.28 4.58 4.35 3.52 3.42 3.31 3.30
20/08/2019 08:10 2976 0.17 0.58 0.06 0.06 0.01 0.88 3.68 3.51 2.93 2.86 2.80 2.79
20/08/2019 08:40 1559 0.11 0.35 0.04 0.02 0.00 0.53 3.06 2.94 2.59 2.56 2.53 2.53
20/08/2019 15:50 0 0.04 0.06 0.00 -0.01 0.00 0.09 1.58 1.54 1.48 1.48 1.49 1.49
(2nd Cycle)
20/08/2019 15:50 0 0.04 0.06 0.00 -0.01 0.00 0.09 1.58 1.54 1.48 1.48 1.49 1.49
20/08/2019 16:57 3367 0.16 0.57 0.06 0.06 0.01 0.87 4.34 4.18 3.61 3.54 3.48 3.47
20/08/2019 17:58 6368 0.27 1.02 0.12 0.14 0.02 1.58 6.02 5.75 4.72 4.61 4.46 4.44
20/08/2019 19:00 7947 0.33 1.27 0.15 0.19 0.03 1.97 7.32 6.99 5.73 5.58 5.39 5.35
20/08/2019 19:58 9373 0.39 1.50 0.18 0.24 0.04 2.35 8.96 8.57 7.07 6.89 6.65 6.61
20/08/2019 20:56 10881 0.45 1.75 0.22 0.29 0.05 2.77 10.72 10.27 8.52 8.30 8.01 7.95
21/08/2019 20:57 12664 0.55 2.15 0.27 0.37 0.08 3.43 14.82 14.27 12.12 11.85 11.47 11.39
21/08/2019 21:38 9653 0.47 1.79 0.23 0.31 0.06 2.87 14.11 13.64 11.85 11.62 11.30 11.24
21/08/2019 22:08 6272 0.36 1.32 0.17 0.21 0.04 2.09 12.66 12.30 10.98 10.81 10.61 10.57
21/08/2019 22:42 3023 0.22 0.75 0.10 0.09 0.02 1.18 10.41 10.18 9.43 9.33 9.24 9.22
22/08/2019 04:53 0 0.07 0.15 0.02 0.00 0.01 0.25 6.59 6.52 6.37 6.35 6.35 6.34
(3rd Cycle)
22/08/2019 04:53 0 0.07 0.15 0.02 0.00 0.01 0.25 6.59 6.52 6.37 6.35 6.35 6.34
22/08/2019 05:52 3239 0.21 0.71 0.09 0.09 0.02 1.12 9.25 9.04 8.33 8.24 8.15 8.13
22/08/2019 06:52 6474 0.34 1.24 0.16 0.19 0.03 1.96 11.62 11.28 10.04 9.88 9.69 9.66
22/08/2019 07:52 9296 0.44 1.66 0.21 0.28 0.05 2.64 13.26 12.83 11.17 10.96 10.68 10.63
22/08/2019 08:54 12457 0.54 2.11 0.27 0.37 0.08 3.38 15.32 14.77 12.66 12.39 12.02 11.94
22/08/2019 09:59 13930 0.60 2.34 0.31 0.42 0.09 3.75 16.63 16.03 13.69 13.39 12.96 12.87
22/08/2019 10:58 15512 0.66 2.59 0.34 0.48 0.10 4.18 18.39 17.73 15.13 14.79 14.32 14.21
22/08/2019 11:58 17091 0.73 2.86 0.38 0.53 0.12 4.63 20.94 20.21 17.35 16.96 16.44 16.32
23/08/2019 00:38 18863 0.84 3.26 0.44 0.60 0.15 5.28 25.12 24.28 21.02 20.58 19.98 19.84
23/08/2019 01:26 15788 0.75 2.89 0.40 0.54 0.13 4.71 24.68 23.93 21.03 20.64 20.10 19.97
23/08/2019 02:10 12377 0.64 2.43 0.33 0.44 0.10 3.96 23.42 22.77 20.34 20.01 19.57 19.46
23/08/2019 02:48 9552 0.55 2.02 0.28 0.35 0.08 3.27 22.29 21.74 19.73 19.45 19.10 19.02
23/08/2019 03:24 6512 0.43 1.53 0.21 0.24 0.05 2.47 20.68 20.25 18.72 18.50 18.26 18.21
23/08/2019 04:34 3414 0.29 0.97 0.13 0.12 0.03 1.55 18.25 17.96 17.00 16.86 16.74 16.71
23/08/2019 10:40 0 0.09 0.24 0.04 0.01 0.02 0.39 13.00 12.91 12.67 12.64 12.63 12.61
T-2a
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
Table T2b :
Summary Of Vibrating Wire Glostrext Extensometer Readings
Date/ Total Structural Structural Structural Structural Structural Structural Structural Structural Structural Structural Total Structural
Time Load Shortening Shortening Shortening Shortening Shortening Shortening Shortening Shortening Shortening Shortening Shortening
From VW From VW From VW From VW From VW From VW From VW From VW From VW From VW for whole pile
Extensometer Extensometer Extensometer Extensometer Extensometer Extensometer Extensometer Extensometer Extensometer Extensometer
Sensor 1a Sensor 1b Sensor 2a Sensor 2b Sensor 3a Sensor 3b Sensor 4a Sensor 4b Sensor 5a Sensor 5b
(kN) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
(1st Cycle)
19/08/2019 16:08 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.00
19/08/2019 17:12 1783 0.063 0.051 0.256 0.242 0.021 0.032 0.041 0.017 0.005 0.002 0.36
19/08/2019 18:13 3320 0.137 0.103 0.527 0.479 0.044 0.064 0.085 0.037 0.010 0.006 0.75
19/08/2019 19:15 4851 0.200 0.193 0.782 0.722 0.070 0.097 0.134 0.062 0.016 0.011 1.14
20/08/2019 07:09 6362 0.277 0.271 1.054 1.026 0.100 0.136 0.194 0.098 0.026 0.020 1.60
20/08/2019 07:40 4689 0.228 0.224 0.853 0.818 0.077 0.111 0.152 0.065 0.020 0.013 1.28
20/08/2019 08:10 2976 0.167 0.168 0.595 0.567 0.049 0.079 0.097 0.027 0.012 0.004 0.88
20/08/2019 08:40 1559 0.105 0.118 0.351 0.349 0.025 0.049 0.049 0.000 0.006 -0.001 0.53
20/08/2019 15:50 0 0.025 0.050 0.057 0.069 -0.005 0.011 -0.003 -0.023 0.002 -0.005 0.09
(2nd Cycle)
20/08/2019 15:50 0 0.025 0.050 0.057 0.069 -0.005 0.011 -0.003 -0.023 0.002 -0.005 0.09
20/08/2019 16:57 3367 0.183 0.142 0.624 0.520 0.051 0.078 0.094 0.035 0.010 0.006 0.87
20/08/2019 17:58 6368 0.301 0.240 1.102 0.941 0.099 0.136 0.189 0.097 0.027 0.020 1.58
20/08/2019 19:00 7947 0.363 0.297 1.342 1.190 0.127 0.171 0.246 0.134 0.037 0.029 1.97
20/08/2019 19:58 9373 0.421 0.356 1.562 1.434 0.158 0.205 0.304 0.174 0.047 0.038 2.35
20/08/2019 20:56 10881 0.483 0.420 1.793 1.707 0.191 0.244 0.368 0.220 0.060 0.049 2.77
21/08/2019 20:57 12664 0.584 0.517 2.162 2.136 0.240 0.308 0.461 0.289 0.087 0.068 3.43
21/08/2019 21:38 9653 0.499 0.439 1.805 1.781 0.198 0.262 0.389 0.236 0.072 0.052 2.87
21/08/2019 22:08 6272 0.388 0.331 1.334 1.298 0.140 0.197 0.269 0.147 0.046 0.029 2.09
21/08/2019 22:42 3023 0.248 0.199 0.761 0.749 0.075 0.118 0.127 0.058 0.022 0.011 1.18
22/08/2019 04:53 0 0.059 0.076 0.103 0.204 0.005 0.036 0.012 -0.009 0.013 0.001 0.25
(3rd Cycle)
22/08/2019 04:53 0 0.059 0.076 0.103 0.204 0.005 0.036 0.012 -0.009 0.013 0.001 0.25
22/08/2019 05:52 3239 0.221 0.199 0.689 0.724 0.073 0.110 0.123 0.059 0.021 0.013 1.12
22/08/2019 06:52 6474 0.353 0.320 1.244 1.238 0.135 0.181 0.241 0.138 0.037 0.026 1.96
22/08/2019 07:52 9296 0.452 0.422 1.652 1.668 0.185 0.240 0.343 0.211 0.060 0.044 2.64
22/08/2019 08:54 12457 0.558 0.531 2.081 2.140 0.240 0.309 0.453 0.287 0.090 0.067 3.38
22/08/2019 09:59 13930 0.611 0.586 2.291 2.383 0.266 0.345 0.505 0.341 0.104 0.077 3.75
22/08/2019 10:58 15512 0.676 0.651 2.526 2.657 0.296 0.387 0.572 0.379 0.120 0.088 4.18
22/08/2019 11:58 17091 0.744 0.723 2.771 2.959 0.329 0.436 0.626 0.428 0.139 0.099 4.63
23/08/2019 00:38 18863 0.850 0.825 3.126 3.388 0.370 0.511 0.697 0.503 0.172 0.118 5.28
23/08/2019 01:26 15788 0.771 0.732 2.777 3.009 0.327 0.463 0.627 0.449 0.157 0.101 4.71
23/08/2019 02:10 12377 0.661 0.627 2.321 2.541 0.271 0.398 0.516 0.370 0.130 0.078 3.96
23/08/2019 02:48 9552 0.566 0.526 1.917 2.117 0.219 0.338 0.419 0.284 0.103 0.056 3.27
23/08/2019 03:24 6512 0.453 0.407 1.441 1.623 0.158 0.265 0.287 0.196 0.070 0.033 2.47
23/08/2019 04:34 3414 0.309 0.273 0.870 1.062 0.090 0.180 0.143 0.105 0.041 0.018 1.55
23/08/2019 10:40 0 0.083 0.103 0.108 0.365 0.002 0.071 0.005 0.016 0.028 0.008 0.39
T-2b
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
2
Modulus of steel = 200 kN/mm
2
Modulus of concrete= Ec kN/mm
TABLE S1: LOAD DISTRIBUTION AND TRANSFER COMPUTATION FOR TEST CYCLES
FROM VIBRATING WIRE GLOSTREXT STRAIN GAUGES TEST RESULTS
Reading at Level A strain Ec-lev.B strain Ec-lev.C strain Ec-lev.D strain Ec-lev.E strain
2 -6 2 -6 2 -6 2 -6 2 -6
( kN ) (kN/mm ) (x 10 ) (kN) (kN/mm ) (x 10 ) (kN) (kN/mm ) (x 10 ) (kN) (kN/mm ) (x 10 ) (kN) (kN/mm ) (x 10 ) (kN)
1st CYCLE
1783 42.8 58 1783 35.7 51 1348 35.8 28 749 35.8 14 364 35.9 4 107
3320 37.1 121 3320 35.5 101 2688 35.7 56 1488 35.8 28 760 35.9 8 227
4851 32.3 197 4851 35.3 151 3978 35.5 85 2272 35.7 45 1203 35.8 14 378
6362 30.0 275 6362 35.0 209 5480 35.4 120 3177 35.6 67 1784 35.8 24 632
2nd CYCLE
3367 36.0 125 3367 35.5 102 2701 35.6 61 1629 35.7 35 941 35.9 10 256
6368 36.7 233 6368 35.1 192 5042 35.4 115 3037 35.6 71 1886 35.8 25 673
7947 36.4 293 7947 34.9 241 6295 35.3 146 3857 35.5 92 2453 35.8 34 915
9373 35.7 351 9373 34.7 287 7476 35.1 178 4690 35.4 114 3034 35.7 44 1179
10881 35.0 415 10881 34.5 337 8744 35.0 214 5622 35.3 140 3689 35.7 56 1487
12664 32.4 513 12664 34.1 417 10726 34.7 271 7078 35.1 176 4648 35.6 79 2092
3rd CYCLE
3239 29.3 142 3239 35.4 110 2926 35.6 71 1887 35.7 41 1090 35.9 9 252
6474 31.4 269 6474 35.0 217 5705 35.3 138 3636 35.5 85 2268 35.8 24 650
9296 33.2 369 9296 34.6 301 7836 35.1 192 5057 35.4 125 3319 35.7 45 1190
12457 34.8 477 12457 34.2 391 10088 34.8 254 6638 35.2 168 4425 35.6 71 1888
13930 35.0 531 13930 34.0 437 11204 34.7 285 7427 35.1 192 5040 35.5 83 2215
15512 34.7 596 15512 33.8 488 12446 34.5 322 8348 35.0 215 5651 35.5 97 2574
17091 34.1 666 17091 33.6 542 13763 34.4 362 9370 34.9 239 6249 35.4 112 2965
18863 32.1 770 18863 33.2 621 15627 34.1 420 10802 34.7 272 7102 35.3 138 3643
T-3
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
TABLE S2 :
SUMMARY OF MOBILISED UNIT SHAFT FRICTION AND UNIT END BEARING
FROM VIBRATING WIRE GLOSTREXT STRAIN GAUGES TEST RESULTS
Load as Total Total Base Mobilised Unit Shaft Friction Average movement of pile between soil stratum Total Mobilised Pb / Ptop
2
per VW Pile Top Shaft Resistance, (kN/m ) (mm) Pile Base Unit End
Load Cell Settlement Resistance Pb GL Lev B to Lev C to Lev D to GL Lev B to Lev C to Lev D to Settlement Bearing
Reading, Ptop, to Lev B Lev C Lev D Lev E to Lev B Lev C Lev D Lev E
( kN ) (mm) (kN) (kN) (0.0m to (4.0m to (7.0m to (8.6m to (0.0m to (4.0m to (7.0m to (8.6m to
4.0m) 7.0m) 8.6m) 10.2m) 4.0m) 7.0m) 8.6m) 10.2m) (mm) (kN/m2) (%)
1st CYCLE
1783 1.44 1676 107 38.4 70.7 85.1 56.8 1.32 1.19 1.10 1.08 1.07 167.5 6
3320 2.58 3093 227 55.9 141.4 161.1 117.8 2.33 2.06 1.90 1.85 1.83 356.7 7
4851 3.71 4474 378 77.2 201.2 236.2 182.5 3.32 2.93 2.67 2.60 2.56 593.6 8
6362 5.36 5730 632 78.0 271.4 308.0 254.6 4.83 4.28 3.92 3.81 3.76 993.5 10
2nd CYCLE
3367 4.34 3112 256 58.9 126.4 152.1 151.5 4.04 3.73 3.54 3.49 3.47 401.7 8
6368 6.02 5695 673 117.2 236.4 254.3 268.2 5.49 4.95 4.60 4.49 4.44 1057.4 11
7947 7.32 7032 915 146.0 287.5 310.3 339.9 6.68 6.01 5.57 5.43 5.35 1438.7 12
9373 8.96 8194 1179 167.7 328.5 366.2 410.0 8.19 7.40 6.87 6.70 6.61 1852.7 13
10881 10.72 9395 1487 189.0 368.1 427.2 486.9 9.83 8.90 8.28 8.07 7.95 2336.9 14
12664 14.82 10573 2092 171.4 430.1 537.0 565.1 13.73 12.59 11.82 11.55 11.39 3288.0 17
3rd CYCLE
3239 9.25 2987 252 27.7 122.5 176.1 185.3 8.86 8.48 8.24 8.17 8.13 396.5 8
6474 11.62 5824 650 68.0 243.9 302.3 357.7 10.97 10.31 9.87 9.73 9.66 1021.8 10
9296 13.26 8106 1190 129.1 327.6 384.3 470.5 12.41 11.53 10.94 10.73 10.63 1870.9 13
12457 15.32 10568 1888 209.4 406.8 489.1 560.8 14.25 13.12 12.36 12.09 11.94 2968.4 15
13930 16.63 11715 2215 241.1 445.3 527.5 624.5 15.44 14.20 13.36 13.05 12.87 3482.0 16
15512 18.39 12939 2574 271.1 483.1 596.3 680.1 17.08 15.70 14.76 14.41 14.21 4045.8 17
17091 20.94 14126 2965 294.2 517.9 689.9 726.0 19.49 17.97 16.93 16.54 16.32 4660.4 17
18863 25.12 15219 3643 286.1 568.8 817.9 764.5 23.47 21.73 20.54 20.10 19.84 5727.2 19
T-4
FIGURES
Project : Sentral Riveria
Figure A:
Instrumentation levels for Preliminary Test Pile PTP2 (900mm Ø)
Pile length = 10.705m from Existing Platform of RL 28.051 m
150
Depth below original ground level (m)
6 136
Scist, RQD = 0%
7.5 m Anchored Lev. A-3 Extensometer 3a, 3b
11
Pile toe at 10.705m depth
Scist, RQD = 6%
12
F-A
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
FIGURE P1 :
PLOT OF PILE TOP LOADS (kN) VS PILE TOP SETTLEMENT (mm)
FOR TEST CYCLES OF MAINTAINED LOAD TESTING
20000
19000
18000
17000
16000
15000
14000
13000
Pile Top Load (kN )
12000
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
Pile Top Settlement (mm)
1st Cycle 2nd Cycle 3rd Cycle
F-1
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
FIGURE P2 :
PLOT OF PILE TOP LOADS (kN) VS PILE BASE SETTLEMENT (mm)
FOR TEST CYCLES OF MAINTAINED LOAD TESTING
20000
19000
18000
17000
16000
15000
14000
13000
Pile Top Load (kN )
12000
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
Pile Base Settlement (mm)
1st Cycle 2nd Cycle 3rd Cycle
F-2
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
FIGURE P3 :
PLOT OF PILE TOP LOADS (kN) VS TOTAL SHORTENING (mm)
FOR TEST CYCLES OF MAINTAINED LOAD TESTING
20000
19000
18000
17000
16000
15000
14000
13000
Pile Top Load (kN )
12000
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Total Shortening (mm) fr Glostrext Extensometer
1st Cycle 2nd)Cycle 3rd Cycle
F-3
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
FIGURE P4a :
PLOT OF PILE TOP LOADS (kN) VS PILE TOP SETTLEMENT (mm),
PILE BASE SETTLEMENT (mm) & TOTAL SHORTENING
20000
19000
18000
17000
16000
15000
14000
13000
12000
Pile Top Load (kN )
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
F-4a
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
FIGURE P4b:
PLOT OF PILE TOP LOADS (kN) VS PILE SETTLEMENT (mm) AT VARIOUS
EXTENSOMETER LEVELS
20000
19000
18000
17000
16000
15000
14000
13000
Pile Top Load (kN )
12000
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
Pile Settlement (mm) at various depths
Piletop Settlement Sett at 1.5m Sett at 6.5m
Sett at 7.5m Sett at 9.7m Sett at 10.7m
F-4b
Static Axial Compression Load Testing on Instrumented Test Pile PTP2
FIGURE P4c:
PLOT OF PILE TOP LOADS (kN) VS PILE SHORTENING (mm)
20000
19000
18000
17000
16000
15000
14000
13000
Pile Top Load (kN )
12000
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
0.5m to 1.5m 1.5m to 6.5m 6.5m to 7.5m 7.5m to 9.7m 9.7m to 10.7m
F-4c
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
2
Modulus of steel = 200 kN/mm
Modulus of concrete= Ec kN/mm2
FIGURE Ec :
PLOT OF BACK CALCULATED CONCRETE MODULUS VALUES, EC, VERSUS MEASURED AVERAGE AXIAL
STRAIN AT LEV A FROM VW STRAIN GAUGES DURING LOADING CYCLES
60
58
56
54
52
50
48
46
Secant Modulus of concrete, Ec ( kN/mm 2 )
44
42
40
y = -4.27E-03x + 3.59E+01
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850
F-Ec
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
Loads ( kN)
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
0 6362
1 6362
2
Depth below platform level (m)
4 5480
7 3177
1784
9
10
632
11
F-5(i)
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
Loads ( kN)
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
0.0 12664
1.0 12664
2.0
Depth below platform level (m)
3.0
4.0 10726
5.0
6.0
7.0 7078
8.0
4648
9.0
10.0
2092
11.0
F-5(ii)
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
2
Modulus of steel = 200 kN/mm
2
Modulus of concrete= Ec kN/mm
Loads ( kN)
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
0.0 18863
1.0 18863
2.0
Depth below platform level (m)
3.0
4.0 15627
5.0
6.0
7.0 10802
8.0
7102
9.0
10.0
3643
11.0
P =3239 kN P =6474 kN P =9296 kN P =12457 kN
P =13930 kN P =15512 kN P =17091 kN P =18863 kN
F-5(iii)
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
2
Modulus of steel = 200 kN/mm
2
Modulus of concrete= Ec kN/mm
FIGURE S2a:
LOAD TRANSFER CHARACTERISTICS DURING LOADING STAGES FOR TEST CYCLES
(DERIVED FROM GLOSTREXT STRAIN GAUGES RESULTS)
1000
Mobilised Unit Shaft Friction ( kN/m 2 )
GL to Lev B
900
Lev B to Lev C
800
500
400
300
200
100
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
FIGURE S2b:
PLOT OF MOBILISED UNIT END BEARING VERSUS PILE BASE SETTLEMENT
(DERIVED FROM GLOSTREXT STRAIN GAUGES RESULTS)
10000
Mobilised Unit End Bearing ( kN/m2 )
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
F-6(i)
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
2
Modulus of steel = 200 kN/mm
Modulus of concrete= Ec kN/mm2
FIGURE S2c:
PLOT OF APPLIED PILE TOP LOAD, TOTAL SHAFT RESISTANCE AND BASE RESISTANCE VS PILE TOP SETTLEMENT
20000
Q (Applied Load)
18000
Total Shaft Resistance
16000
Base Resistance
14000
12000
Load ( kN )
10000
8000
6000
4000
2000
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
Pile Top Settlement (mm)
FIGURE S2d:
PLOT OF Pb / Ptop (%) VERSUS PILE TOP SETTLEMENT (mm)
50
45
40
35
Pb/Ptop ( % )
30
25
20
15
10
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
Pile Top Settlement (mm)
F-6(ii)
Project : Riveria Sentral , Brickfield
2
Main steel : 30 T32,(As = 24,127 mm )
2
X-Area of concrete :Ac,Nominal= 612,045 mm
2
Modulus of steel = 200 kN/mm
2
Modulus of concrete= Ec kN/mm
FIGURE S2e:
PLOT OF MOBILISED UNIT SHAFT FRICTION VERSUS DEPTH
0
1
P =6362 kN (1st Cycle)
2
3
4
5
6
7
8
9
10
11
0
1 P =12664 kN (2nd Cycle)
2
3
4
5
6
7
8
9
10
11
0
1 P =18863 kN (3rd Cycle)
2
3
4
5
6
7
8
9
10
11