Organogram showing two levels above and below applicant (if present), with individual’s name and ECSA’s
registration category, if required. Identify the applicant’s supervisor
Consultant/Owner
The problem addressed in this period was to provide infrastructural design that met client’s need at the most
economical cost.
The method of analysis included the followings
Open channel flow analysis
Hydraulic modelling using Hardy Cross Equation
Storm water analysis using the rational formula
Pavement analysis using the CBR method of design
Pavement life cycle analysis using net present value and cost /benefit ratio
I prepared the construction drawings under supervision, the construction drawings included plans, profiles of the
road, water and sewer infrastructures as well as standard and specific details.
I also included road cross sections at specific stations in the construction drawings.
Health and safety considerations; hazards and environmental considerations, other legislation
The Environmental Impact Report for these projects were prepared by environmental consultants.
I was working towards demonstrating competencies in the design of water, sewer and road infrastructures in
accordance with South Africa’s Builders Standards.
I was also working towards demonstrating competencies in writing specifications