DANGOTE REFINERY AND

PETROCHEMICALS PROJECT

MANAGEMENT OF CHANGE

To: EIL Contractor: GTA POWER MECH FZE


Cc: DORC Contract No.: TR_0015_3007
Block / Unit: RODM Date: 27/05/2020
Reference Documents: MOC No: 3007-GTAPM-MOC-001
□Civil □Architecture □Structure□Mechanical□Electric□Instrument □HAVC
Discipline
Piping□Insulation□ Painting □Tank□Pre-commissioning□Fire Proofing □Welding
SUBJECT:
Issued: Top Urgent  Urgent  Normal
Contractor Evaluation:  Cost Impact Schedule Impact  Design Impact
ISSUE DESCRIPTION AND REASON FOR MOC:

Prepared by: Approved by( GTAPM Manager):

Date: Date:
Reply(DORC&EIL):

Reply by(DORC&EIL): Approved by (DORC&EIL):

Date: Date:
Attached Documents:
1.
2.