You are on page 1of 1

How the seven “Muda” can revolutionise your operations

Muda 5 – Eliminating complex processing

When applying lean production methods, companies should start by planning


for the minimum and then improve the existing infrastructure gradually.

Second-generation lean production building kit systems are


based on a small number of basic elements that can be ad-
apted and extended as necessary using highly specialised

Lean Production
elements, so that changes can be made at any time.

Second-generation building kit system solutions use stable aluminium


fasteners and tube protectors made of flexible foam that are fitted separately.

in industry
Second-generation building kit systems boast impressive simplicity and thus
eliminate waste caused by complex processing.

Boost the efficiency of production processes!


Learn more about the 7 Mudas of lean production. Download the free white paper

Explore the award-winning Lean Production Building Kit Systems from item

Get the latest industry news from item

Stay up to date with item on industry news and innovations on

item. Your ideas are worth it.®

You might also like