DC1 SUBMISSION FOR LUSAIL PROJECT WITH SUBSTATION

 SLD
 SSP
 SUBSTATION DETAILS
 DIGITAL SITE PLAN WITH SITE COORDINATES AND
SUBTATION COORDINATES SHOWING CABLE TRENCH
 BP
 LOAD BREAK DOWN
 LOAD VERIFICATION
 IN CASE THE SUBSTATION IN GROUND FLOOR WE WILL PUT
SUBSTATION WITH ALL INFORMATION AND COORDINATES
AND ROUTING OF CABLE TRAY AND CABLE TRENCH

ALSO NEED BASEMENT FLOOR AND CABLE TRAY ROUTING