Agile Scrum Master(ASM®) Project - Smart Weather

Step 1 : Created the scrum module project and post created


the epic as per peroject requirement.
Step2: Created the stories and change the priority which need
to be done and assigned the story point for each stories.

Step 3: Assigne the stroies into the epic which we have


already created and arranged as per work need to be done.
Step 4: Assign the story into the sprint 1,2 which need to be
finished in given sprint.
Burndown Chart for sprint 1

Step 5 : Sprint 2 i have initiated post sprint 1 completion.


Burndown chart from sprint 2
Jira Profile :https://iakshaykr.atlassian.net/people/5d71d2be608c0a0dae6f883d