Step 1 : Created the scrum module project and post created
the epic as per peroject requirement. Step2: Created the stories and change the priority which need to be done and assigned the story point for each stories.
Step 3: Assigne the stroies into the epic which we have
already created and arranged as per work need to be done. Step 4: Assign the story into the sprint 1,2 which need to be finished in given sprint. Burndown Chart for sprint 1
Step 5 : Sprint 2 i have initiated post sprint 1 completion.
Burndown chart from sprint 2 Jira Profile :https://iakshaykr.atlassian.net/people/5d71d2be608c0a0dae6f883d