You are on page 1of 6
KN KEWPUMP’ Keays Bamaeind fa (GENERAL APPLICATION PUMP RWJ} = COMPLIES WITH ISO 2858 eo STANDARD WN KEWPUMP © KS-SR sich Fearures Design ‘The KS-SR range of pumps is manufactured for a wide range of flow and head requirements and fully ‘complies with ISO 2858:1975 standard. Back pull-out design to give instant access to most parts for simple and ‘quick maintenance. Materials of Construction All standard pump components in contact with the fluid are made of Stainless Steel 304 (CF-8). Stainless Steel 816 (CF-8M) and Cast Iron are also available upon request. FLANGES casine IMPELLER SHAFT * Flangos ate dilled Highly efficient one-piece Enclosed type wih twisted Fobust and st solid ‘accorting to voluto type with itoaraly vane design for maximum ‘ensures loss cetaction TSO 7008-1:1992- PN cast feet End suctan with performance. Swept back the seal face to extend the Vertical cenraine bearing vanes o- impeler ‘mechanical seal ite, siocharge nozzle. running rings are cast onto the back shroud to balance ‘al tust and relieve pressure on the stung box by extending bearing ‘and mechanical seal reliably. Open impetirs aro also avaiable on Fequest for certain pump ‘SHAFT SLEEVE ‘STUFFING BOX COVER BEARING BRACKET BEARINGS For gland packing sealing, Cast in one-pieco with lage igi sinote-piace cast ton Heavy duty, single com, renewable hook ie shalt ove seal chamber available constuction and in ‘deep groove bal earns ‘sleeve is fited to prevent fon al pumps furnished with ‘connection with the ‘aro designed with ol bath shaft damage under the ‘mechanical seal. Standard ‘Support fot. Designed wth lubrication, Each beating is sland packing bore stuffing box cover can large ol reservoir for better protected by a cast ron De ited wih a packed gland ——_lisipation of neat, and ‘over with iui ol seal to as an allerative ‘standard al level ensure an exceptionally bulls-oye sight glass for Jong, rouble fee beanng ‘easy monitaring, ie IN KEWPUMP” KS-SR cenenat pimensions SR ( BARESHAFT ) SRM ( CLOSE-COUPLED } e mer cpt on a We att i ie. : Lees PUMP san mae = a a eae ok a See |o eee eels Bees 10 a et eelealt) aie i Ss tea eaten te ea Sere stn 0-160 2° es “°° [a2 [260] s0 | 100 70 |240/ 190) 2es | 24 | 50 [279 8 | oy Bedell ctacft meee Cato load | ae eseaed Shes] : fooe| (set apl am) || [Seay mp @ 3 | = ea Reade SEH | oo ee etal” sleet lal ed | » ee ae ea arn se es 2 eee ay | fe vl ws [=]ee] [ae] EY as Se iofel ie =| Farts vo | | | | [ss] |e haba ei eae le serie 8 = obs 80-200 500 128) 98 us | 2a0 B. 32/80 353 10 | 198 cere SON 100, sls eee o/s es vali eee = re tn) in SL ae 100-260" 109 125. a ze tore]? |"* [sane asi | 2m er habae alse : sea aia pee = 125-260") 5, 459 140 385 ee ee asleolee Step a eee falas ps ete | PS" p| nay apg d aad ee es = 1200-800". 209 200 | 1 310 | 355/450 129 | 250 190 82050 tay 29 1800 040° e| oo 00 82 oma jen es [ral [al = ee Boe. s-as| aT ty {£3} iS x “Hand tw Sundae BoepneKurber, oto Sear Power I. Stndaazee LEC. ry as |W | Tout 8 | ee | ‘ose te nits cg Da KN KEWPUMP™ KS-SR 2225 ust SR ( BARESHAFT ) out J001e 402) 124) OL TEAIM BOA Aer BHOIM BEY LO RD AD aM OM MO SY HO HO SMO HHH TsO Tm OM SI Dw af ch | i dy 3 ey - Hf SF 4 oa 200 saa nd mes odo 28 240 die wt tgs Sena tee Stem ta anata hm chr! ene ‘ton Pacha HOD1C caang tr cso mpeter ‘Stress S00 308 1201.6 | Cones pater Sania So! 308 201 Skat Strives Sot 308 183116 | Shut See tor and Pecking | Staries Soot 308 {Be.tm | Stat Seeetar wechancaSeing | Stariese Stet 308 1341 npr | StnieasStect 308 Ms! eter pater Starla Stet 30 fae Shin traey Staries Sao 304 aan | Mesures Sa | Catone eame zr Pasting | sett 2AE1G | Sutin 0xCove for Gland Packing | Sarees Sto 304 2124M | SufingBoxCover for Mechel Solna Starnes Sta 304 row Sing Bex Gov or Mechel Sesing ties sical 304 211 | Gan | States Soa 308 Bt Ending Staiess Stat 308 218 Secor Staless Stl 304 Poo one cnn | ‘tess Soir | Seer Gove eaten | Sion Src toe Si gone inary Sicaoe | Sear elt Don Pp Siero See Sony on Sen, Sehr eto: Serra on Sarin St 30¢ Soto eorven SRS orig Spats tow ar Sve on Seno Sut Stra So Goer Gee Seu Gor ster SRM ( CLOSE-COUPLED ) ‘opie Mel: At moc onc 90-400, 100400, 12530, 128 400 and mods wm charge dane 60rm and 200mm ‘dott Morar Seas BM StS 2, TDL, 124, 12S, 12M, EN, a, TOM ar TOL GOL Oe aes 1941 LG TOBA BOD tata za ame ass eae ia NOC | Cesn er Closed Inpster States Stal 20. Frame Abt = [TMG | Good master Sais Ste te 221 captor xenon en est ron 11 | Motor exten Shan ‘Stariess Stal se Zas | Never Asan Exner ng Gaston BRIM | Stat stove forMecanieal Seuing | Stree Stel G01 | CaengDra Pog Stness ia 08 1OA1 | rmpeter at Staries Stal 304 feat | Vereng Pug Stnese Sto 3 (ss) | Keytar ate Stariess Stal 481. | Suing Box Cover Gast eRe viva | Mecha! Set (Caron vs, Gatamec fot | Same ‘Stans Sta 304 | ia | Sting Bor Cover tormsenni Saaiag | Stara Ste! 8 201 Hangn Monies Noor = ‘Pa in mie eh pa ae KS-SR PUMP SELECTION CHART Copan PH 2 e 1450RPM] copay oe (Curve for reference ony. For final selection refer to incivcual pump curve Black dots on curves show best efciancy points EF KN KEWPUMP * toto hewpump com. Pe i mth nt re

You might also like