ELECTRICITY SUPPLY APPLICATION
TYPE OF APPLICATION
New Electricity Supply PV Generator Interconnection*
New Electricity Supply (Pre-Payment) Change to Pre-Payment System
Syarikat SESCO Berhad (672931-A) Upgrading/Downgrading of Supply Separate Meter
A Subsidiary of Sarawak Energy Group
Rewiring/Retesting of Installation Rural Electrification Scheme (RES)
- -
A2. ADDRESS
Premises Address
Postcode
Town
State S A R A W A K
Telephone (H) Telephone (O)
Handphone Fax
E-mail
Premise Status Own Rent Others, please specify
Type of Premise Terrace House - Single/Double Semi Detached House - Single/Double Detached House - Single/Double
Apartment/Flat/Condominium Shophouse Showroom Factory Others, please specify
Penghulu/ Ketua Kampung's authorisation letter (for kampung house only) Business Document : Form 49 & Trading License
Consent letter from co-owners for multiple ownerships of premises Authorisation Letter from relevant Government Dept.
Name of Applicant
Date
*Note : Size of PV should not exceed MD applied. This is to ensure that the system capacity is adequate.
Page 1
SECTION B: TO BE COMPLETED BY REGISTERED ELECTRICAL CONTRACTOR
B3. ATTACHMENT
I enclosed herewith :-
1 copy of site plan indicating clearly the location of the premises, meter position, location of proposed substation (if any), location of proposed
main switch board room (if any), pole position & etc.
1 copy of schematic diagram ** The Electrical Consultant is required to sign on all documents submitted for building under their design.
Letter of approval of building plan from relevant council
Form EIU/ST/1.0 - Supervision and Completion/ Test Certificate
SESCO's letter of approval for Electrical Drawing and/or Centralize Metering Cabinet Drawing and/or MSB Drawing (if applicable)
One (1) copy of manufacturer's MSB drawing and factory test result
One (1) copy of MSB Primary Injection test result Additional documents required for
application of CT or HV meter
One (1) copy of letter of appointment of Electrical Contractor (EIC) by applicant
One (1) copy of letter of appointment of Electrical Consultant by applicant
Undertaking letter for temporary supply
Photocopy of paid connection charges bill (if applicable)
Photocopy of paid collateral deposit bill (if applicable)
Form AC04A & AC04B - For application of demand tariff (C2/C3/I2/I3)
Note: The company will not connect any installation which does not confirm to the Rules, Regulations and Practices
and their subsequent amendments unless by special sanction of the Director of Electricity Supply.