Table 22: Reames of soins fr slagle development
BEG AE ett FS
MLD ranges of single substations requiremen
development ‘Sunea a .
A new INOW substation may be
Upto 3s0kVA | required, subject to system capability
stuly by TNB
S350 VA to =
ava Arnaw LV/.ARY substation i equited
THO4EV andor TIRV substations
1OOOKVA up to required. A new PPU may be required,
) 140mx75m_— | match — and size
(a) 132/33/11kV Without outdoor building bylaws
(b) 13233/11kV | switchyard
(vith capacitor Feiss ete Ria aasea
bank) Hata ATES