Table 22: Reames of soins fr slagle development BEG AE ett FS MLD ranges of single substations requiremen development ‘Sunea a . A new INOW substation may be Upto 3s0kVA | required, subject to system capability stuly by TNB S350 VA to = ava Arnaw LV/.ARY substation i equited THO4EV andor TIRV substations 1OOOKVA up to required. A new PPU may be required, ) 140mx75m_— | match — and size (a) 132/33/11kV Without outdoor building bylaws (b) 13233/11kV | switchyard (vith capacitor Feiss ete Ria aasea bank) Hata ATES