You are on page 1of 3
SF = er SSeS 4 bescpton ibaa tm Ta wm oe te ts Pf Tego ae ed ey ws pn Pre uns PaTSTSD = as [aes ae | nee ee | 7 eng oS Pipe Rot TW Cp SO Wo a Pg ONCE EA Pernt T TES as ee aa se ting ow Pe Tot Cap ON Ne rp ONSEN ESI 2s | os [aes ear] sea Ting oS pe seo aps We Pareto nNOS) ewe [| TRS] ET Te se | a 5 ng SS pe Te Gp EW PS OR OST Pernt Tere | S| |e a | ae yao as | ee | sea a =o fg of Poe erg Cp OTR) Pert ewe DE) Te ree a as | se a ee 7 fee pe Ege 8 Gn ST Te TRSD Pere Tents [TES Gas mee eae es] as es Tas fangs ago Pr a Fs athe a an id Reuse | | a] |S eS 1 [ortne ots Poets pe SO TO rer Rene | 3 | as] a ass ee 10 ning Pipe Wadena wo TST — Neen [3a] | | re ss me ee ae 7 Farin FIO Te Tee eae |e ae |e Fae aa aon TSU TTT ST 22 [ran etn en) pth 23 fae ere S| S| |e a | a = 5 aya ain ego oa oT ; Reve | aSo| 3 aoe] eae ae [ao] ae ae] Ts ae we a sa iT an RTO OWES COTO TT Wa Tar pr OTR ban Tua waa | a |e | am | ae | ee we es | 15 [rand tan oon pr Sea nes pr ace! rng shag oS as oma | es [ea fae eer 15 [Ping Panga Tmoed espe SPOR mae aes | ae) ss | ee L gw lead ocarnent Specaiet Manener Head of rociement Head ofSbeay chan tading, Unloading Uneatng &Fbrcation et 77 Joreating of wooden cseseFmachiner (be mao 15 [Siting / nloding of Machinery wth rife pio Yon eves provider wil aronge the frees per Nese andar) perks | 55t Fabrication at Neste Poni ys wate) Tabiston of HSB] Su al ung stalin or ste opto height ofS 19 | service provider will arrange the Material + Consumables + Machinary + All manpower at his own within this same price) Perks 165.00 ebrestion of WS(A6) Sucre without mateal Inui installation on site upto height of? Sv a |(Nestle will provide the Material ONLY while Consumables + Machinary + All manpower will be Service provider responsibility) bec 0); oa abr ofa lng sation on ste vote Reig of 25m ee | vem [sere prover wl arene the Mater + Consumes + Machina + Allmanpower ths own thin hs same pie) bration of 35304

You might also like