SF = er SSeS
4 bescpton ibaa tm Ta wm oe te ts Pf
Tego ae ed ey ws pn Pre uns PaTSTSD
= as [aes ae | nee ee |
7 eng oS Pipe Rot TW Cp SO Wo a Pg ONCE EA Pernt T
TES as ee aa se
ting ow Pe Tot Cap ON Ne rp ONSEN ESI
2s | os [aes ear] sea
Ting oS pe seo aps We Pareto nNOS)
ewe [| TRS] ET Te se | a
5 ng SS pe Te Gp EW PS OR OST Pernt
Tere | S| |e a | ae yao as | ee | sea
a =o
fg of Poe erg Cp OTR) Pert
ewe DE) Te ree a as | se a ee
7 fee pe Ege 8 Gn ST Te TRSD Pere
Tents [TES Gas mee eae es] as es
Tas fangs ago Pr a Fs
athe a an id
Reuse | | a] |S eS
1 [ortne ots Poets pe SO TO rer
Rene | 3 | as] a ass ee
10 ning Pipe Wadena wo TST —
Neen [3a] | | re ss me ee ae
7 Farin FIO Te
Tee eae |e ae |e
Fae aa aon TSU TTT ST
22 [ran etn en) pth 23 fae
ere S| S| |e a | a =
5 aya ain ego oa oT ;
Reve | aSo| 3 aoe] eae ae [ao] ae ae] Ts ae we a
sa iT an RTO OWES COTO TT Wa Tar pr OTR
ban
Tua waa | a |e | am | ae | ee we es |
15 [rand tan oon pr Sea nes pr ace! rng shag oS
as oma | es [ea fae eer
15 [Ping Panga Tmoed espe SPOR
mae aes | ae) ss | ee
L gw
lead ocarnent Specaiet Manener Head of rociement Head ofSbeay chantading, Unloading Uneatng &Fbrcation et
77 Joreating of wooden cseseFmachiner (be mao
15 [Siting / nloding of Machinery wth rife pio Yon eves provider wil aronge the frees per Nese andar) perks | 55t
Fabrication at Neste Poni ys wate)
Tabiston of HSB] Su al ung stalin or ste opto height ofS
19 | service provider will arrange the Material + Consumables + Machinary + All manpower at his own within this same price) Perks 165.00
ebrestion of WS(A6) Sucre without mateal Inui installation on site upto height of? Sv
a |(Nestle will provide the Material ONLY while Consumables + Machinary + All manpower will be Service provider responsibility) bec 0);
oa abr ofa lng sation on ste vote Reig of 25m ee | vem
[sere prover wl arene the Mater + Consumes + Machina + Allmanpower ths own thin hs same pie)
bration of 35304