You are on page 1of 4

14.00 16.

99

17.01

6
14. 5

6.64

3.00 3.64
2.00

1.50
6.00

3.00
R.KELAS/ R.KELAS/ R.KELAS/ KM/WC
ASRAMA ASRAMA ASRAMA
10.00

NAIK

1.50
2.00
SELASAR SELASAR SELASAR
4.00

RUANG

2.00
R.TAMU
R.TAMU PENGURUS

4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.12


8.00 8.00 8.00 6.12

HALAMAN
UTARA
Company Title  Drawing Name  Drawn by  Date 
Pondok Pesantren  #CAD Technician 
"Imam Bukhori"  Checked by  Date 
Jl. Solo ­ Purwodadi ­ Selokaton 
DENAH LANTAI 1 #Architect 
Jawa Tengah  Drawing Scale  1:150 
Job Title  Drawing Status 
Layout ID  Status  Revision 
Gedung Asrama Putra 2 Lantai 
Pre­Liminary  A.01 
6.64

3.00 3.64

1.50 1.00
3.00
6.00

R.KELAS/ R.KELAS/ R.KELAS/


ASRAMA ASRAMA ASRAMA TURUN
KM/WC
10.00

1.50
2.00
SELASAR SELASAR SELASAR
4.00

R.BELAJAR RUANG

2.00
R.BELAJAR
PENGURUS

4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.33


8.00 8.00 8.00 6.33

UTARA

Company Title  Drawing Name  Drawn by  Date 


Pondok Pesantren  #CAD Technician 
"Imam Bukhori"  DENAH LANTAI 2 Checked by  Date 
#Architect 
Jl. Solo ­ Purwodadi ­ Selokaton 
Jawa Tengah  Drawing Scale  1:150 
Job Title  Drawing Status 
Layout ID  Status  Revision 
Gedung Asrama Putra 2 Lantai 
Pre­Liminary  A.02 
Company Title Drawing Name  Drawn by  Date 
Pondok Pesantren  #CAD Technician 
"Imam Bukhori"  Checked by  Date 
Jl. Solo ­ Purwodadi ­ Selokaton 
TAMPAK DEPAN #Architect 
Jawa Tengah  Drawing Scale  1:150 
Job Title  Drawing Status 
Layout ID  Status  Revision 
Gedung Asrama Putra 2 Lantai 
Pre­Liminary  A.03 
Company Title Drawing Name  Drawn by  Date 
Pondok Pesantren  #CAD Technician 
"Imam Bukhori"  Checked by  Date 
Jl. Solo ­ Purwodadi ­ Selokaton 
ILUSTRASI 3D #Architect 
Jawa Tengah  Drawing Scale  1:150 
Job Title  Drawing Status 
Layout ID  Status  Revision 
Gedung Asrama Putra 2 Lantai 
Pre­Liminary  A.04 

You might also like