Professional Documents
Culture Documents
Axia Project Budget Template - For IT Software Projects
Axia Project Budget Template - For IT Software Projects
Published by Axia Consulting Ltd, 17 New Road Avenue, Chatham, Kent ME4 6BA, United Kingdom.
Web: www.axia-consulting.co.uk Email: info@axia-consulting.co.uk
Axia Consulting Ltd gives no warranty (either expressed or implied) in relation to the quality, accuracy, performance and fitness for purpose of this
'Project Budget Template'. Axia Consulting Ltd will not be liable for any loss or damage (whether directly or indirectly suffered), or any
consequential loss arising from the use of this 'Project Budget Template'.
This ‘Project Budget Template’ is free for personal use and to help you with projects internally within your organisation. However, you are not
permitted to display this ‘Project Budget Template’ on the Internet, whether in part or whole, whether modified or not, nor to advertise, resell or
obtain a commercial benefit from it.
INSTRUCTIONS are below (click the tab at the bottom of the screen to access the Project Budget Template)
The Project Budget Template includes sample data for illustration purposes, which will need to be amended to reflect your specific situation.
Review, amend, add to or delete the descriptions of expenditures, as required, to tailor to your specific situation. Then input your cost ($) and unit
estimates. NB: expenditures in 'year 0' should be those expenditures already incurred or which will be immediately incurred, whilst expenditures in
'year 1' should include any other expenditures incurred up to the end of 'year 1'.
The worksheet is completely flexible. Rows and columns may be resized. Data may be amended. Additional worksheets may be added.
All calculated figures are in coloured in orange, to assist easy recognition, however, the colour may be changed as desired. The worksheet uses
simple Excel calculations which may be altered as required. After changes have been made to the worksheet, it is recommended that the calculations
are checked.
Year: 0 0 1 1 2 2 3 3
Rate $ per Quantity Quantity Quantity Quantity
Unit/Day Units/Days Units/Days Units/Days Units/Days Total
Ref Project Expenditures $ $ $ $ $
1 Selection process
Implementation process
2 Software costs
3 Hardware costs
Year: 0 0 1 1 2 2 3 3
Rate $ per Quantity Quantity Quantity Quantity
Unit/Day Units/Days Units/Days Units/Days Units/Days Total
Ref Project Expenditures $ $ $ $ $
4 Network costs
4.1 Cabling or wireless LAN, WAN or other network 5000 0 0 1 5000 0 0 0 0 5000
4.2 Racks 0 0 0 0 0 0 0 0 0 0
4.3 Routers 0 0 0 0 0 0 0 0 0 0
4.4 Switching devices 0 0 0 0 0 0 0 0 0 0
4.5 Modems 0 0 0 0 0 0 0 0 0 0
4.6 Leased or dedicated lines 5000 0 0 1 5000 0 0 0 0 5000
4.7 Communications software 0 0 0 0 0 0 0 0 0 0
4.8 Internet access eg ADSL / broadband, satellite 0 0 0 0 0 0 0 0 0 0
Sub total 0 10000 0 0 10000
5 Labour costs
Year: 0 0 1 1 2 2 3 3
Rate $ per Quantity Quantity Quantity Quantity
Unit/Day Units/Days Units/Days Units/Days Units/Days Total
Ref Project Expenditures $ $ $ $ $
5.1.3 Systems analysts 300 0 0 10 3000 0 0 0 0 3000
5.1.4 Programmers 300 0 0 20 6000 20 6000 0 0 12000
5.1.5 Systems testers 300 0 0 20 6000 30 9000 0 0 15000
5.1.6 Vendor consultants 1000 0 0 3 3000 3 3000 0 0 6000
Additional team resources eg contractors, temporary
5.1.7 staff, other consultants 0 0 0 0 0 0 0 0 0 0
5.1.8 Travel and expenses 0 0 0 0 0 0 0 0 0 0
Sub total 0 31000 31000 0 62000
Year: 0 0 1 1 2 2 3 3
Rate $ per Quantity Quantity Quantity Quantity
Unit/Day Units/Days Units/Days Units/Days Units/Days Total
Ref Project Expenditures $ $ $ $ $
5.4.7 Communications costs 0 0 0 0 0 0 0 0 0 0
5.4.8 Video teleconferencing 0 0 0 0 0 0 0 0 0 0
5.4.9 Printing eg user manuals 0 0 0 0 0 0 0 0 0 0
5.4.10 Project information / education / marketing materials 0 0 0 0 0 0 0 0 0 0
5.4.11 Project team or user recognition / awards 0 0 0 0 0 0 0 0 0 0
Sub total 0 0 0 0 0
6 Training
6.1 Technical training for implementation team (by vendor) 1000 0 0 10 10000 0 0 0 0 10000
6.2 Training key users (by vendor) 1000 0 0 4 4000 10 10000 0 0 14000
6.3 Temporary internal training facilities 0 0 0 0 0 0 0 0 0 0
6.4 Training remainder of users (internally or by vendor) 0 0 0 0 0 0 0 0 0 0
6.5 Training materials 100 0 0 10 1000 50 5000 0 0 6000
6.6 Travel and expenses to attend training 0 0 0 0 0 0 0 0 0 0
Sub total 0 15000 15000 0 30000
7 Data costs
8 Other costs
Year: 0 0 1 1 2 2 3 3
Rate $ per Quantity Quantity Quantity Quantity
Unit/Day Units/Days Units/Days Units/Days Units/Days Total
Ref Project Expenditures $ $ $ $ $
9 Overheads
10 Contingency
11 Ongoing costs
Year: 0 0 1 1 2 2 3 3
Rate $ per Quantity Quantity Quantity Quantity
Unit/Day Units/Days Units/Days Units/Days Units/Days Total
Ref Project Expenditures $ $ $ $ $
Number of users (software licences) 90
Total project cost per user 4022