METHODS OF ERECT| ION Scaffold method Block Assembly method Lift-up method Individual elements are assembled in place at actual elevations Members and joints or prefab subassembly elements are assembled ‘on their final position. Full scaffoldings usually. Sometimes partial scaffolding are used if cantilever erection. Elements fabricated at the shop ‘Transported to the construction site, and no heavy lifting equipment is required, Divided on its plan into individual strips or blocks. ‘These units fabricated on the ground level. Then hoisted upon into its final position and assembled on the ‘temporary supports. Suitable for double layer grids. ‘The whale space frame is assembled at the ground level so that most of the wark can be done before hoisting. Increased efficiency and better quality. SPACE FRAME CONNECTIONS + Welded connection