METHODS OF ERECT|
ION
Scaffold method
Block Assembly method
Lift-up method
Individual elements are assembled in
place at actual elevations
Members and joints or prefab
subassembly elements are assembled
‘on their final position.
Full scaffoldings usually.
Sometimes partial scaffolding are used if
cantilever erection.
Elements fabricated at the shop
‘Transported to the construction site,
and no heavy lifting equipment is
required,
Divided on its plan into individual strips
or blocks.
‘These units fabricated on the ground
level. Then hoisted upon into its final
position and assembled on the
‘temporary supports.
Suitable for double layer grids.
‘The whale space frame is assembled at
the ground level so that most of the
wark can be done before hoisting.
Increased efficiency and better quality.SPACE FRAME CONNECTIONS
+ Welded connection