Professional Documents
Culture Documents
1
Message determination process
Message determination is a process of determining the messages while creating the purchasing
documents.
Message will be triggered automatically from the available master record called message condition
record.
If condition record does not exist, message details will be maintained manually in the relevant
purchasing documents.
Condition technique
It consists of 4 steps
2
Message condition table
Multiple condition tables can be created with combinations as shown below. Based on the
combinations, messages can be stored in the master data / condition tables.
Based on the business requirement new condition tables can be created from condition table number
501 to 999.
3
Access sequence
Access sequence is a message searching strategy. Access sequence is having list of message condition
tables. The condition tables are listed in the access sequence in what sequence the message should be
searched.
4
Message condition type
Message condition type is defined to maintain various mediums like print out / fax / email / EDI Idoc /
etc.
5
List of transmission medium – Print out / Fax / External send (Email) / Edi Idoc
6
Fine tune control of message condition type
Fine tuning of message type can be done for operations - New and Change
Message schema
All the required message conditions are arranged in a specific format in the calculation schema. This
message schema is linked with purchasing document category.
7
Assign message schema to purchasing document
8
Steps to configure pricing determination process
1. Condition tables to be created. Condition table contains various fields where the messages can
be stored
3. Create required condition types and enter the access sequence in the required condition types
4. Fine tune the condition types for new and change operations
6. Assign the message schema to purchasing documents like RFQ, PO , Contract and scheduling
agreement.
After setting up the message determination process, if the condition record exists while creating
purchasing documents like purchase order / contract / scheduling agreement, the message will
be triggered.
9
Sl No Purchasing document Application Condition record Print T.Code
1 RFQ EA MN01 / MN02 / MN03 ME9A
2 Purchase order EF MN04 / MN05 / MN06 ME9F
3 Contract EV MN07 / MN08 / MN09 ME9L
4 Scheduling Agreement EV MN07 / MN08 / MN09 ME9L
5 SA Delivery schedule EL MN10 / MN11 / MN12 ME9E
6 Service entry sheet ES MN13 / MN14 / MN15 ML83
6 Goods movement MB MN01 / MN02 / MN03 MB90
7 Invoice verification MR MRM1 / MRM2 / MRM3 MR90
8 Consignment & Pipeline MR MRM1 / MRM2 / MRM3 MR91
settlement
1. Print
2. Fax
3. Telex
4. Email
5. EDI
Maintaining condition records for different transmission medium for same partner is not
possible for same message output type
Maintaining condition records for different transmission medium for same partner is possible
for different message output type
10