ID FIBRES DATE TIME AT BACTHING Initial Slump (mm)
MIX 4 NO 15.12.2021 10:34 AM 230
MIX 8 YES 15.12.2022 11:08 AM 210 Temperature on site TIME OF ARRIVAL ON SITE Slump on site (mm) Air content on site (%) (deg C) 11:50 AM 33 240 1.7 12:18 PM 35 240 - APPROXIMATE TIME OF POURING