You are on page 1of 3

Full-Time Information and Knowledge Management Examination Rubric (GIE 825)

Information Knowledge Management Exam – Rubrics Cube

Section / Criterion Mark Ranges Total

0–5 6 – 10 11 - 15
The advantages and The advantages and The advantages and
Question 1 disadvantages depicted are not disadvantages depicted are disadvantages depicted are
15 Marks
A aligned or relevant to the relevant but not fully aligned to the Insightful, relevant to the
reading or themes. themes mentioned & is not 100% themes mentioned & clearly
related to the reading. aligns with the reading.
0–5 6 – 10 11 - 15
The mitigating points made to The mitigating points made to reap The mitigating points made to
reap the benefits and stay the benefits, stay relevant and reap the benefits, stay relevant
Question 1
relevant and competitive are not competitive are fair but don’t fully and competitive clearly 15 Marks
B
useful no insightful and show illustrate the IKM material in use illustrate the IKM material in
limited application of the IKM nor bring about the best outcome practice through the insightful
material. to the case in question. output.
0–4 5–7 8 - 10
The approach does not deal The approach provided is fair in The approach provided in
with the resistance to a culture theory but not sustainable in dealing with the resistance and
Question 2
that sees sharing as practice, lacks further insight and counterproductive mind-set to 10 Marks
A
counterproductive and doesn’t thought application to the scenario sharing in order to benefit from
address the problem at hand. depicted. tacit knowledge practices is
well-articulated, well thought

-1-
Information Knowledge Management Exam – Rubrics Cube

Section / Criterion Mark Ranges Total

through and shows to be


practical and sustainable in
practice.
0–4 5–7 8 - 10
The approach depicted does not The approach is not clearly divided The short, medium and long
deal with the causes of the between short, medium and long term approach depicted in this
Question 2 counterproductive resistance term with limited application of the answer directly deals with
10 Marks
B culture to sharing with no to SECI model. resolving the resistances
non-relevant application of the depicted in Question 2 A with
SECI model. effective application of the
SECI model.
Question 3 0–2 3–4 5
A The plan of action and approach The plan of action and approach The plan of action and
does not relate to the results in what KPI’s to focus on, approach to illustrate the value
measurement concept to without depicting the detailed value of IKM is well articulated and
measure the organisations of why these KPI’s and what structured in what KPI’s in
ability to apply and track the picture it would paint in terms of the details can be applied and 5 Marks
results of IKM. organisation ability to apply IKM measured to successfully
effectively. illustrate the benefit IKMM
brings to the organisation.

-2-
Information Knowledge Management Exam – Rubrics Cube

Section / Criterion Mark Ranges Total

Question 3 0–2 3–4 5 5 Marks


B The plan gets executives to The plan gets executives to The plan gets executives to
participate in IKM is not well participate in IKM is fair in participate in IKM as strategic
thought through with little to no application but seems more enabler to the business is well
buy-in by not addressing the operational examples than thought through with effective
sustainability concept nor the strategic in depiction and applies application of the sustainability
IKM material to support it some but not all IKM material of IKM material applied.
further. mainly to the sustainability concept
of IKM.
Question 3 0–4 5–7 8 - 10 10 Marks
C Did not apply the dimensions Applied the dimensions of IKM but Question 3B’s answer is well
effectively to question 3B. did so by applying question 3B to depicted against the 3
all three without looking at which dimensions of IKM and places
ones more relevant to its the right emphasis on the
sustainability versus a good idea to people and process
implement in isolation. dimensions with technology
being seen as an enabler and
not the core to its
sustainability.

-3-

You might also like