You are on page 1of 20
Ss Chandra Asri| PT. CHANDRA ASRI PETROCHEMICAL TBK PT. ASAHI KOKUSAI TECHNEION INDONESIA DOG NO. REVISION ‘STATUS PEMIIAWP/022/04 1 c SURFACE PREPARATION AND PAINTING PROCEDURE GENERAL MP CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, DesaMangunreja, Mangunreja, Serang, Banten 42455 v ‘APPROVED APPROVED AS NOTES, NOT APPROVED. 207 AS) PRONEC TENGEN SECTON FOR AS BUILD a fi 25.Nov-2021 Issued for As Buld Fei. 6 ancesh. P t6-Augusi-2024 Issued for Approval erin. © ‘Androan, P PREPARED CHECK, APPR, REV DATE DESCRIPTION | I PT. ASAHI KOKUSAI TECHNEION INDONESIA [STATUS CODE :A-= lecvs for Reviewed 8 = Issued for Approval ~C = As Build ‘TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORGIODEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER, PT. CHANDRA ASRI PETROCHEMICAL TBK Ss Chandra Asri | pr. ASAHI KOKUSAI TECHNEION INDONESIA ono sion] sar PEMIEMWPI013/00 (aro A COVID-19 PREVENTION PROCEDURE GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 FOR INFORMATION ay o O7-June ‘ssued for Information ‘Andre Erwin M.qaen | rev | ome oesorioN [_aen_| ‘STATUS CODE : A= Issue for Information ~B = Issued for Approval -C = As Build TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER REVISION SHEET DESCRIPTION PT. CHANDRA ASRI PETROCHEMICAL TBK PT, ASAHI KOKUSAI TECHNEION INDONESIA Ss Chandra Asri DOGNO. REVISION | STATUS __ PEMAWPIO41/00 see. a EXCAVATION PROCEDURE GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 FOR INFORMATION | pers | EEA [=> 0 | train Iss for formation odie Ewin | When | Nf zaen REV ate | DESCRIPTION [_reraseo | oxdox he |" PT. ASAHI KOKUSAI TECHNEION INDONESIA [STATUS CODE : A= Is0ue for Information -B = Issued for Approval ~C= AS Build TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN ‘WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL TBK Ss Chandra Asri PT. ASAHI KOKUSAI TECHNEION INDONESIA DOG NO. REVISION | STATUS PEM/INWP/010/00 o | A WORKING AT HEIGHT PROCEDURE GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL Merak Plant, Desa Mangunreja, Mengunreja, Serang, Banten 42455 FOR INFORMATION I a oo] ree ical man ae = 7 PT, ASAHI KOKUSAI TECHNEION INDONESIA ‘STATUS CODE: A = Issue fr Information 8 = Issued for Approval C = Ae Bull TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL, TBK. = Chandra Asri PT. ASAHI KOKUSAI TECHNEION INDONESIA DOCNO. Revision | sTaTus | PEMIINWP/009/00, 5 FALL PROTECTION PROCEDURE GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL Jl. Raya Anyer Km.123, Ciwandan, Cilegon, Banten 42447 peenoveo renown aswOTS or arene AEWeD sianet | OR 1 Tome ean me ff paw _[rrases 90821 (Crete aceon FOR APPROVAL | | | f st | ia Taued for Revewed Fred A PREPARED DATE DESCRIPTION [ieee ‘STATUS CODE ‘TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL TBK S chandra Asri Pi ASA KORUGNITECRNEION NDGNESIA DOC NO. REVISION | STATUS PEMI/WP/019/00 o A WORK METHOD STATEMENT FOR INSTALLATION TEST AND INSPECTION PROCEDURE GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 FOR INFORMATION [ eepebniacefinneeettreee ee 4 wr (05/05/2027 ‘Issued for Information Timron R. RC Arbiol Zaen PREPARED | CHECK faoer. DATE DESCRIPTION L PT, ASAI KOKUSAI TECHNEION INDONESIA TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL TBK = Chandra Asri | _PT. ASAHI KOKUSAI TECHNEION INDONESIA STATUS REVISION nae PEMAIWP/07 7/00, WORK METHOD STATEMENT FOR LAYING CABLES & WIRES (PULLING CABLE) GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455, FOR INFORMATION ] 0 ‘05/08/2021 Issued for Information Tnron R R. (he = PREPARED | CHECK | APPR REV DATE DESCRIPTION PT. ASAHI KOKUSAITECHNEION INDONESIA ‘STATUS CODE! A= issue for information ~ 8 = Issued for Approval - © = As Bulld TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL TBK S& chandra asi PT. ASAHI KOKUSAI TECHNION INDONESIA Jeena ‘boc | Revision | status PEMINWPI01 8/00, 0 WORK METHOD STATEMENT FOR INSTRUMENT CABLE TERMINATION GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mengunreja, Mangunreja, Serang, Banten 42455, FOR INFORMATION | - t if soz Teed fr Worn Tarn | RG Aiwa | odecna t PREPARED | CHECK. APPR. PT. ASAHI KOKUSAI TECHNEION INDONESIA STATUS CODE : A= Issue for Information - B= Issued for Approval ~C = As Bull ‘TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN (WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER, DATE DESCRIPTION PT. CHANDRA ASRI PETROCHEMICAL TBK Se Chandra Asri PT. ASAHI KOKUSAI TECHNEION INDONESIA BOGNO, REVSION | STATUS PEMIINWP/01 6/00 o A WORK METHOD STATEMENT FOR CABLE TRAY AND ACCESSORIES GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Piant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 FOR INFORMATION —s ler eee DATE DESCRIPTION [STATUS CODE : A = Issue for Information ~ B = lesuec for Approval - C= As Bull ‘TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER. PT. CHANDRA ASRI PETROCHEMICAL TBK = Chandra Asri PT. ASAHI KOKUSAI TECHNEION INDONESIA BOSH REVSION | STATUS | : aa aaa ~ a WORK METHOD STATEMENT FOR GENERAL PIPING WORK GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 0 | ainsr2024 Issued for nformation Ric. arial ‘Zeen PREPARED | CHECK. APPR, PT. ASAHI KOKUSAI TECHNEION INDONESIA REV DATE DESCRIPTION ‘STATUS CODE : A = Issue fr Information - B= Issued for Aporoval~ C= As Build ‘TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL TBK PT. ASAHI KOKUSAI TECHNEION INDONESIA BOCNO. PEMLL-WP. [REVISION NONCONFORMANCE REPORT PROCEDURE GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455, FOR INFORMATION A - p a FrMay-2021_| Tate for information Fer ‘Andrean. P Zaen DATE DESCRIPTION [STATUS CODE :A = Issue for Information - 8 = Issued for Approval -C = As Buld ‘TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER | prerareo | cHeck. | /appa. PT. ASAHI KOKUSAI TEGHNEION INDONESIA PT. CHANDRA ASRI PETROCHEMICAL TBK Ss Chandra Asri PT. ASAHI KOKUSAI TECHNEION INDONESIA DOGNO. [REVISION | STATUS PEM/INWP/O014/00 i) A INSPECTION AND TEST PLAN (ITP) GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 FOR INFORMATION lay 202i | ____lesvefornermaton Far 6 prepared | cHECK | APPR ‘ndraan. P REV DATE DESCRIPTION PT, ASAHI KOKUSAI TEGHNEION INDONESIA ‘STATUS CODE : A= Issue fr Information ~ 8 = Issued for Approval~ C= As Bull ‘TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER. T PT. CHANDRA ASRI PETROCHEMICAL TBK Ss Chandra Asri PT. ASAHI KOKUSAI TECHNEION INDONESIA ; PEMINYP/020104 i LIQUID PENETRANT EXAMINATION PROCEDURE ASME BPV, B31.3 CODE GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK ‘Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 (Qa ss roncr isonet cnn FOR AS BUILD [aspera und For Appa Fab —| “Andean P| aie [ oa Augost2i Iesved For Approval Fer | Andean | _M. aen PREPARED | CHECK APPR. DATE DESCRIPTION PT. ASAHI KOKUSAI TECHNEION INDONESIA STATUS CODE ‘TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL TBK Ss Chandra Asri) PT. ASAHI KOKUSAI TECHNEION INDONESIA __BOCNO. REVISION | STATUS. PEMIWPI007/04 1 c WELDING PROCEDURE SPECIFICATION (WPS) AND PROCEDURE QUALIFICATION RECORDS (PQR) GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, DesaMangunreja, Mangunreja, Serang, Banten 42455 Nar AROVED [es BS psarzibsri =a Qu (24-Nov-2021 Tesued for As Build Forix: G ‘Andrean. P ‘eune2iet Tend Arve Fez @ | Avdeon.P | Mf. Zaen prepare | cHecx | APPR DATE, DESCRIPTION PT. ASAHI KOKUSAI TECHNEION INDONESIA [STATUS CODE :A = Iseue for Reviewed ~ 8 = Issued for Approval-C = As Build ‘TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN ‘WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL TBK Ss Chandra Asri PT. ASAHI KOKUSAI TECHNEION INDONESIA DOCNO. REVISION | STATUS PEM/IWP/006/00 eal Ea QUALITY CONTROL PROCEDURE GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455, FOR INFORMATION (ot OS May2i Teed for Information Fare G ‘Ancrean. P prepanen | cHEcK | APPR pare | DESCRIPTION PT. ASAHI KOKUSAI TECHNEION INDONESIA ‘STATUS CODE : A= Issue for Information -8 = Issued for Approval ~ C= As Bulé TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER s Chandra Asri PT. CHANDRA ASRI PETROCHEMICAL TBK PT. ASAHI KOKUSAI TECHNEION INDONESIA DOCNO. REVISION | STATUS PEMIPRIIO04/04 ° c PROJECT DELIVERABLE LIST GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 FOR AS-BUILT ‘APPROVED NOT APPROVED REMEWED ay saved | VR ebianto| name Bebra BS pate fasittiat STATUS CODE : z i 2ENow Tene fer Arh ‘dean | Wson o 30-Aer Tssved for Asprovas ‘neon ® | _M.dasn prepared | neck | MPR rev | ate DESCRIPTION ‘TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. ASAHI KOKUSAI TECHNEION INDONESIA = leave for Reviewed ~ B = Issued for Approvel C= Ae Buld PT. CHANDRA ASRI PETROCHEMICAL TBK Ss Chandra Asri PT, ASAHI KOKUSAI TECHNEION INDONESIA. DONO. REVISION | STATUS PEM/EMP/002/00 0 A CHANGE ORDER PROCEDURE GENEREAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 FOR INFORMATION ° 8-Jun Issued for Information ‘ndrean P Zien prepareo | CHEK REV DATE DESCRIPTION PT. ASAHI KOKUSAl TEGHNEION INDONESIA STATUS CODE : A= Issue fr Information —& = Issued for Approval -C = As Build TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FOREIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNEF s Chandra Asri PT. CHANDRA ASRI PETROCHEMICAL TBK PT. ASAHI KOKUSAI TECHNEION INDONESIA DOGNO, REVISION ‘STATUS PEMMNP/O01/00 ° a DOCUMENT HANDLING PROCEDURE GENEREAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 | FOR INFORMATION N olen Teed tor inoraton Tncresnb | oon | PREPARED | CHECK DATE DESCRIPTION ‘APPR. PT. ASAHI KOKUSAI TECHNEION IN ‘STATUS CODE : A= la2ue for Information - 8 = Issued fer Appraval~ C= As Bullé TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER IDONESIA = Chandra Asri PT. CHANDRA ASRI PETROCHEMICAL TBK PT, ASAHI KOKUSAI TECHNEION INDONESIA [ DOENO, REVISION STATUS PEMII/PRJIO08/01 MATERIAL APPROVALS TUBING AND ACCESSORIES GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL 1 TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 Vv APPROVED eet ae nl wa [9 | oa we Eee] [es cece ass mrovecrencnten scot FOR AS-BUILT (ae 7 25Now Issa or Ae Boie ncreanP | _REAbiol 0 | eWay [ese for Areva AnereanP | _RCAPO! prerareo | creck | APPR rev | pate DESCRIPTION STATUS CODE : A= leave for Reviewed ~B = Issued for Approval C= PT. ASAHI KOKUSAI TECHNEION INDONESIA ‘As Build TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN ‘WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER PT. CHANDRA ASRI PETROCHEMICAL TBK Ss Chandra Asri PT. ASAHI KOKUSAI TECHNEION INDONESIA DOCNO. REVISION | STATUS PEMIPRA/O006/01 1 c MATERIAL APPROVALS CABLE TRAY GENERAL MP-INSTRUMENT CAP TAM PS-1 PROJECT PT. CHANDRA ASRI PETROCHEMICAL TBK Merak Plant, Desa Mangunreja, Mangunreja, Serang, Banten 42455 V | aseroven [APPROVED AS NOTES NOT APPROVED RewEWeD rome fae] 8s Date 2st (ace FOR AS-BUILT I x A j nS if 1 _|_25Now Issued fr As Bult ‘AndreanP | _ RGArbiol Been a eay Issued for Approvals ‘AndroanP | _ RGAtil PREPARED | CHECK, DATE DESCRIPTION | "PT. ASAHI KOKUSAI TECHNEION INDONESIA ‘STATUS CODE : A= Issue for Reviewed ~B = Issued for Approval C= As Build TOTAL OR PARTIAL REPRODUCTION ANDIOR UTILZATION OF THis DOCUMENT ARE FORSIDDEN {OUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER ae PR,

You might also like