The document contains data from stand pipe piezometers installed at different piers of a barrage for the Sainj Hydro Electric Project. It includes details like project name, location, installation date, initial water level measurements, and periodic water level readings over time. The readings show a gradual decline in the water levels at piezometers SPP-2 and SPP-3 located at Pier 3 and Pier 6 respectively, indicating settlement of the barrage foundation over time.
The document contains data from stand pipe piezometers installed at different piers of a barrage for the Sainj Hydro Electric Project. It includes details like project name, location, installation date, initial water level measurements, and periodic water level readings over time. The readings show a gradual decline in the water levels at piezometers SPP-2 and SPP-3 located at Pier 3 and Pier 6 respectively, indicating settlement of the barrage foundation over time.
The document contains data from stand pipe piezometers installed at different piers of a barrage for the Sainj Hydro Electric Project. It includes details like project name, location, installation date, initial water level measurements, and periodic water level readings over time. The readings show a gradual decline in the water levels at piezometers SPP-2 and SPP-3 located at Pier 3 and Pier 6 respectively, indicating settlement of the barrage foundation over time.
DATA FOR STAND PIPE PEIZOMETER INSTALLED AT BARRAGE , PIER NO.
-1, UP-STREAM
Project Name Sainj Hydro Electric Project (100 M.W.)
Customer Name: Hindustan Constrution Company Name of Instruments: Stand Pipe Peizometer (SPP-1) Location: Barrage Axis, U/S, Pier No.-1 Date of Installation: 01.07.2017 Initial Water Level 1754.450 m Top Level 1754.500 m Bore Pipe Height 0.170 m Depth at Water Level Settlement in Sl.No. Date which water from top Remarks mtr found (m) 1 7/1/2017 0.220 1754.450 0.000 WL 1744 2 7/2/2017 0.221 1754.449 0.001 WL 1744 3 7/20/2017 0.220 1754.450 0.000 WL 1744 DATA FOR STAND PIPE PEIZOMETER INSTALLED AT BARRAGE , PIER NO.-3, UP-STREAM
Project Name Sainj Hydro Electric Project (100 M.W.)
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs