Professional Documents
Culture Documents
745
20
3"x3"
570
3185 1020
5. ANY DISCREPANCY IN THE DRAWING SHALL BE NOTIFIED
75 75
TO THE ARCHITECT BEFORE STARTING WORK
565
4"down
970
75 from the ceiling
565
75
565
75
915
2095
from the ceiling
565
4"down
75 from the ceiling
565
75 75
2020 940 1020
1025
75
75
230
210
50
50 75
REVISION
180 530 2340 530
Hollow
455
75
305
455
305
455
LED stripe
lighting
305
455
150
75
75
REMARKS
NOTE:-
6935
500
115
1400
Fan point
115
75
640
500
75
STATUS CONSTRUCTION
150
150
SCALE NOT TO SCALE
75 75 75
305 545 1950 965 305 DATE 25-JAN-2017
75
DRAWING CEILING FIRST FLOOR
DRAWN BY SURAJ
CHECKED BY ASHRAY
Fan point
3000
3440
75
365
75 75
305
305
jyamiti@gmail.com
ARCHITECTURAL STUDIO jyaamiti@gmail.com