Daily Report

Date: 19 Oct 2021 - 20 Oct 2021

Department : IT Department

Reported by : Hilman Gusti A

No. Topics Follow-up By

1. Setup IP Switch HP-1920-S ALL Panel From Dynamic IP to Static IP IT

2. Pengecekan Kabel LAN Akses Point ke Arah Switch di Panel Tower C+2

3. Pengecekan Kabel LAN Akses Point ke Arah Switch di Panel Tower C+3

4. Pengecekan Kabel LAN Akses Point ke Arah Switch di Panel Tower C+4

5. Pengecekan Kabel LAN Akses Point ke Arah Switch di Panel Tower C+5

6. Pengecekan Kabel LAN Akses Point ke Arah Switch di Panel Tower C+6

7. Setup IP Static Akses Point All Room Tower C+2

Labeling Kabel LAN to Port Switch 2 (HP-1920-S IP Address:


8.
172.16.99.163) di Panel Tower C+2

9. Pemasangan UPS di Eng Coord, Eng SPV, Fbm, Fbspv, Fc Coord, Rest
Manager

10. Pemasangan UPS di POS Inspira, POS Semeja Cashier, POS Semeja
Terrace
11.
Pemasangan Akses Point Ryujie AP-720L di Alltitude
12.
Setup IP Static Akses Point All Room Tower C+3
13.
Setup IP Static Akses Point All Room Tower C+4
14.
Setup Domain POS PC untuk In Room Dinning , POS Food Truck
15.
Penarikan Kabel Lan dari Ruang Server to Room Kid Card
16.
Setup IP Static Akses Point All Room Tower C+5
17. Setup IP Static Akses Point All Room Tower C+6