Location: West Bank — Underpass at Zk1 + 809 and in the Premises of Section-4 New
Working Space
Topic: Lack of CCCC’s Safety Surveillance
Deseription:
During visiting the West Bank construction activities at underpass and near overload control
system, JV Team noticed lack of safely measures. Specifically, it was noticed that workers found
working in height without wearing safety harness or safety belt during formwork installation for top
slab construction of underpass located at chainage ZK1+809. Please refer figure-1.
Near overload control system, it is found that a new working space for CCC's S4 team, is being
constructed by some workers without wearing any proper PPE. A worker found carrying heavy
weight steel column without wearing hand gloves and helmet. Please refer figure-2. Its also found
that a group of workers working for tube well installation without wearing any single PPE. Please
refer figure 3.
i Oe
Fig.3: Without wearing any PPE even no mask in this pandemic situation.
Page 1 of 2All the mentioned things considered; we require CCCC HSE Dept. to implement an effective safety
ntioned working areas on a regular basis and to instruct all the needful
ns for all CCCC workers inside the CCCC working areas.
surveillance at the above-
to increase the safety cont
Please consider this as a matter of urgency.
Comments:
Open/Closed-Superseded Letter
Comments:
Consultant Signature:
Date:
Issued by the Consultant:
Signature:
as Cet La
Giancarlo Cardone
iancarlo Cardone / Mostafijur
Designation: SUE / OE
Date: 11/04/2021
Time: 11:30am
Received by the Contractor:
Signature:
Name. Hoe eles
Designation:
Date: en] [Gua]
fa
Time: [p29
Page 2 of 2Reply of SIN-383
The Contractor appreciates your kind concerns on this issues. CCCC
has taken immediate actions against those substandard practices.
1. CCCC has strengthened the safety management of under pass
construction west bank. Special Toolbox Meeting has been arranged
with the workers. Importance of using safety belt, has been
emphasized. Now for the height altitude works, every worker use
safety belt.
Fig! Special Toolbox Meeting Fig.2 - Use of safety belt
2. CCCC also strengthened safety management at overload control
station construction site. Now all the workers, supervisors and other
stuffs are wearing proper PPE at site.
Fig. 3- Proper PPE at Over Load Control Station construction site.
Author: Att
Date: 92}. “2 ).