You are on page 1of 4
ay 'SUMADHURA INFRACON PVT. LTD Ref. No. _[sIPL/QAQC/F02/08 ‘| |SUMADHURA Method statement [Rev No: o ame Tren poe: fistaae i San rae ao iii Se ifoenng ena rine equips awa sa pes — sey nsscton cart | sno Est ous 2; Machinery/Equipment [The folowing equloment/machinery shall be used a} Auto Level, Total station, Leveling staff, Nylon thread, spray paint, measurement tape sprit level ee by Earth moving equipments lke Front loader, Backhoe loader, | Tools inspection format, 2-1 | oclain, dump truck, steer skid roller Calbration recoras | Safe E/Sitn Er, OF Er [e) Hit Breaker/Jack hammer [d) Hand tools| e}tadder 3. Work procedure 3_|Suveying [check for boundary locations once again with surveyor prior | Survey register, 3.41) te tron navaton nthe rolect sneer | See er [check for calibration status of survey equipments ike Auto Level, Total station ete, before put nto use. Check condition 3.12)of level staff. Record instrument Serial Number 8 calibration doe Site Er. status in cheelit/ceparate register on dally basis & the area lwork 51g econ exiting around evel at 5m gd spacing. erin’ PRATT aearaced more steep/slope record @ 3m c/c and document it. Establish at east 03 Temporary Bench marks (T6M) at locations, away from the building, which may not be disturbed] 3.1.4|during entie course of projec. Write Reduced levels (.t) & Survey register, site er, Project Manager |Coordinates in TBM. TBM should be related to Permanent Seca ench Mark (OM ven by Got Suey Sody sual PON tat SATE en ar Fest ioritae asta BOTERE TROT RTT —| Sang oo wing Fmschng wh sncon sewing opectionhustobe fered | Actua 8 required saclenemnayeconinar approvanasobetsantefore | cinenboraenet be | oWeeMemee Poet focnaton any dcrepaney eae to manageren wat | handwritten or turhernetructan, seinowedge Seog oerenes G1 BIaT 3 TTT OGRE TIM fem he bling ine oes maul oases & ros vaaton To of plas must et ue eel 0 saz} dances mestred are slong horontal pane. Inspine| — SIAUCVI/002 see, acer rou rts tp upsep down pls al beconsreted fominimie errs apn. cptre lation of ilesin ig lyouaving Eco wih eat Reference pillars must be alteast one foot above the adjacent Leen pba str grondievleswellembedseditsolwiestone | PMastobecaotredin | 3.1.8lfoot with PCC base. Grid lines must be marked on the pillar Fs rea a “i ger Neaherdname ont Selvefremert must erected on |

You might also like