aig SUMADHURA INFRACON PVT. LTO fref.no. _[SIPL/QAQC/FO3/09
Method statement frevnor [0
SUDHA Backfling Date: [sons
[so Description Records Responsibility
THealth & Safety
He following personal protective equoments shal be used
fa) Helmet
1 fety Induction record | Safety Er/site Er
a |b) Hand gloves | Say i ty Es
lc) Dust mask
2, Machinery/Equipment
He folowing eauipment/machinery shall be used
fa Earth moving equipments
ib} CB, Steer skid loader
4 ool inspection safety Erie Er
2 [b) Roller compactor, plater vibrator (Teols inspection focraet, carats cme,
[d) Hand tools
fe} Ladder
3. Work procedure:
3 [Prerequisite
[Surplus soll from excavated earth rom stock piles could be
used fr backfill. Soil from outside source if to be used, shall
be brought to the site premises only after determining the
sultabity by QC check
aaa]
Project Manager
soit with properties, quid limit & plasticlimit exceeding 65%
a 359% respectively shall not be used. n Sieve analysis not
nore than 50% shall pass Smm sieve & not more than 20%
shall pass 75micron sieve
Soil test report
acer.
soil with organic material, construction debris, clay content,
oveign materials, combustible materials & black cotton soil
shell not be used. Maximum sizeof stones that could be
present in backfill matorial is 100mm
sIPL/CIMIL/O3C
Site Er, QC Er.
lproctor values of soil selected for backfilling to be determined
Maximum dry density (MOD) & Optimum moisture content
(ONC) has to be found out & reports generated.
Soll test report
acer
Footing/pedestal with structural defects like honeycoms,
loose concrete shal be treated with appropriate repair
material & cured properly. Repair costs shal be captured in
cost of repair statement
a]
siPL/aaac/Foo
Site Er, QC Er
For filing near retaining wall/Underground structures, ensure
lwaterproof treatment is dane & checklists are recorded
lbefore proceeding. Take care waterproof layer is not damaged|
34.
siP/ewvil/168
Site Er
Backfill material quirement must be computed prior to start
3.1,7}of activity. Generally 30% extra volume than actual is required
to complete the activity
Project Manager
This Method statement{Mis} needs to be Kept in
|Permit/information box for reference
Permit box
Site Er, QC Er
32, [Backtiting
surface preparation must be ensured. Area for backfling
3.2.1] must be free of construction debris. Haesin cloth wrapped
lover footing & pedestals must be removed. CT jacks, steel
rebars, ply boards f any must be collected and sent to stores.
siycmiyosc
Sie Er, ACEr.
Page 10f2[Ret no.
siPL/aAac/Fo%/09
ag 'SUMADHURA INFRACON PVT. LTD
SUMADHURA
‘Method statement
Rev No:
lo
a ea Backfiling
[51No.
Date:
8.08.26
Description
Records
3.22|
[Ether backfilling in 300mm layers could be done with
|compaction by vibratory roller of minimum capacity 0.75MT
lor with plate compactor depending on type of soil, or mass
iting could be done in 0.60m layers
do:
Responsibility 4
Site Er
323]
Iwith earth rammer or vibratory roller, @ minimum oF O5
passes is recommed for effective compaction over a particular
area. n areas where mechanical compaction could not be
ldone, manual compaction shall be done with wooden or
metal rammers
oa
She Er
3.24]
When done in mass ayers(inax 0.6m) water consoldation to
loe done, followed by piercing holes in sol mass @ 3.0m cfc.
land flooding with water for settlement. After soil mass had
ldried up and enough settlement happened, proceed with
successive 0.6m layers.
do:
Site Er.
325]
lin either case, top 600mm of backfil tobe done in 2 ayers,
subjected to mechanical vibro roller compaction
-do-
Site Er,
For stepped footings locations, backing could be done
immediately after deshuttering & touchup works if any. Once
sol filled upto the step height, water shall be ponded for
Jcuring as well as consolidation
do"
She Er.
323]
inspection has to be offered to OC Dept. for carrying out
|compaction checks. Only after QC approval further work shal
proceed
Site Er, QC Er,
3.28]
[Top layer of backfil to be checked for compaction achieved
lthrough Field Density Test (FDT). Percentage of compaction to
lhe 9596 of MDD.
Field density test report
Site er.
[Frequency of compaction check shal be folowed as, For plain
area lke basement filing one test per 200sqm (03
|specimens). For retaining wal locations one test per 30Rm.
lArea of backfill & number of samples tested to be mentioned
in checklist at bottom
sipiyewitjo3c
ac Er.
32.10]
Incase of basement fling, soll profile has to be prepared in
slope in 1:200 oF as required to maintain unform PCC(200mm)
J& Screed concrete thickness (75mm)
site Er, QC Er
3.2.11]
if due to eritica ste conditions, any slushy soll or water
logging is encountered, do not carryout compaction. Soling or
sol stabilisation may be required in such cases. Consult with
| for further action
Project Manager
3.2.12
[Above laid down procedure, f any needs compromise, same
shall be discussed with VP/AVP and approval has to be
lobtained through site instruction register. Copy of same shall
be attached to checklist & intimated to HO.
Site instruction register
Site Er, QC Er.
Reviewed by
‘Approved by
ad
hs p=
yee
SSuresh Kumar,
‘Bubesh Kumar Babu
Bharat Kumar Kandukurh
Head - QA/QC
(C00 Technical
Director - Operations
Page 2 of 2