aig SUMADHURA INFRACON PVT. LTO fref.no. _[SIPL/QAQC/FO3/09 Method statement frevnor [0 SUDHA Backfling Date: [sons [so Description Records Responsibility THealth & Safety He following personal protective equoments shal be used fa) Helmet 1 fety Induction record | Safety Er/site Er a |b) Hand gloves | Say i ty Es lc) Dust mask 2, Machinery/Equipment He folowing eauipment/machinery shall be used fa Earth moving equipments ib} CB, Steer skid loader 4 ool inspection safety Erie Er 2 [b) Roller compactor, plater vibrator (Teols inspection focraet, carats cme, [d) Hand tools fe} Ladder 3. Work procedure: 3 [Prerequisite [Surplus soll from excavated earth rom stock piles could be used fr backfill. Soil from outside source if to be used, shall be brought to the site premises only after determining the sultabity by QC check aaa] Project Manager soit with properties, quid limit & plasticlimit exceeding 65% a 359% respectively shall not be used. n Sieve analysis not nore than 50% shall pass Smm sieve & not more than 20% shall pass 75micron sieve Soil test report acer. soil with organic material, construction debris, clay content, oveign materials, combustible materials & black cotton soil shell not be used. Maximum sizeof stones that could be present in backfill matorial is 100mm sIPL/CIMIL/O3C Site Er, QC Er. lproctor values of soil selected for backfilling to be determined Maximum dry density (MOD) & Optimum moisture content (ONC) has to be found out & reports generated. Soll test report acer Footing/pedestal with structural defects like honeycoms, loose concrete shal be treated with appropriate repair material & cured properly. Repair costs shal be captured in cost of repair statement a] siPL/aaac/Foo Site Er, QC Er For filing near retaining wall/Underground structures, ensure lwaterproof treatment is dane & checklists are recorded lbefore proceeding. Take care waterproof layer is not damaged| 34. siP/ewvil/168 Site Er Backfill material quirement must be computed prior to start 3.1,7}of activity. Generally 30% extra volume than actual is required to complete the activity Project Manager This Method statement{Mis} needs to be Kept in |Permit/information box for reference Permit box Site Er, QC Er 32, [Backtiting surface preparation must be ensured. Area for backfling 3.2.1] must be free of construction debris. Haesin cloth wrapped lover footing & pedestals must be removed. CT jacks, steel rebars, ply boards f any must be collected and sent to stores. siycmiyosc Sie Er, ACEr. Page 10f2 [Ret no. siPL/aAac/Fo%/09 ag 'SUMADHURA INFRACON PVT. LTD SUMADHURA ‘Method statement Rev No: lo a ea Backfiling [51No. Date: 8.08.26 Description Records 3.22| [Ether backfilling in 300mm layers could be done with |compaction by vibratory roller of minimum capacity 0.75MT lor with plate compactor depending on type of soil, or mass iting could be done in 0.60m layers do: Responsibility 4 Site Er 323] Iwith earth rammer or vibratory roller, @ minimum oF O5 passes is recommed for effective compaction over a particular area. n areas where mechanical compaction could not be ldone, manual compaction shall be done with wooden or metal rammers oa She Er 3.24] When done in mass ayers(inax 0.6m) water consoldation to loe done, followed by piercing holes in sol mass @ 3.0m cfc. land flooding with water for settlement. After soil mass had ldried up and enough settlement happened, proceed with successive 0.6m layers. do: Site Er. 325] lin either case, top 600mm of backfil tobe done in 2 ayers, subjected to mechanical vibro roller compaction -do- Site Er, For stepped footings locations, backing could be done immediately after deshuttering & touchup works if any. Once sol filled upto the step height, water shall be ponded for Jcuring as well as consolidation do" She Er. 323] inspection has to be offered to OC Dept. for carrying out |compaction checks. Only after QC approval further work shal proceed Site Er, QC Er, 3.28] [Top layer of backfil to be checked for compaction achieved lthrough Field Density Test (FDT). Percentage of compaction to lhe 9596 of MDD. Field density test report Site er. [Frequency of compaction check shal be folowed as, For plain area lke basement filing one test per 200sqm (03 |specimens). For retaining wal locations one test per 30Rm. lArea of backfill & number of samples tested to be mentioned in checklist at bottom sipiyewitjo3c ac Er. 32.10] Incase of basement fling, soll profile has to be prepared in slope in 1:200 oF as required to maintain unform PCC(200mm) J& Screed concrete thickness (75mm) site Er, QC Er 3.2.11] if due to eritica ste conditions, any slushy soll or water logging is encountered, do not carryout compaction. Soling or sol stabilisation may be required in such cases. Consult with | for further action Project Manager 3.2.12 [Above laid down procedure, f any needs compromise, same shall be discussed with VP/AVP and approval has to be lobtained through site instruction register. Copy of same shall be attached to checklist & intimated to HO. Site instruction register Site Er, QC Er. Reviewed by ‘Approved by ad hs p= yee SSuresh Kumar, ‘Bubesh Kumar Babu Bharat Kumar Kandukurh Head - QA/QC (C00 Technical Director - Operations Page 2 of 2

You might also like