LF100-7D(CJ)-CG-02

Frame Welding Assembly (white frame) Test Procedures A total of 2 Page 1


pages
No. Test Name Test Items Tech Requirement Test Method Test Ratio Remark
Outline Correct status, no missing parts, no obvious deformation of the
Visual check Cuantas muestras o va a ser PC
structure parts
The welding of key parts should be solid and reliable and
welding joint should be even and flat. Leakage welding,
1 Exterior
Welding incomplete penetration, undercut, burning through, cracks and
other obvious defects will not be allowed. The non-critical part Visual check Cuantas muestras o va a ser PC
quality
welded incompletely or the length of pseudo soldering shall not
be greater than 10% of the soldering seam.
Random inspection of the depth of welding: Choose 5-8CM
cutting at the initial sampling. When testing, the sample should
be cut perpendicular to the welding seam. And the sample
should be magnified by no less than 20 times after polishing,
then check the depth of the welding. The welding depth shall not
be less than 0.1mm. The labeling method is as follows:
Welding Welding
2
strength test penetration

Definir si la prueba va a ser externa y


con cuantas muestras.

Data Source Compilation


Revision
Standardization
Proposed Company Authorization
Approval
File No. Motorcycle Business Dept
Label Unit(pcs) Signature Date Duty Signature Date
Revised

LF100-7D(CJ)-CG-02
Frame Welding Assembly (white frame) Test Procedures A total of 2 pages Page 2
No. Test Name Test Items Tech Requirement Test Method Test Ratio Remark
Engine 94+2 +0.5
mounting 84+2 +0.5 Inspection Tool of
Mounting hole size 163.5±0.5 Engine Mounting
3 Point of Front strut Hole
26°±0.5
Frame angle
Other Comprehensive
Qualified through Inspection Tool
mounting size Inspection Tool
File No. File No. Revised Unit(pcs) File No.
Label Unit(pcs) Signature Date Label Unit(pcs) Signature Date Label Signature Date
Revised Revised