Process:
1 Open Atmospheric drain of seal steam header at TG 8.5 m
2 Open slowly AS - 67 MOV ( At TG 17m) to increase seal steam inlet temperature
3 Close Vacuum breaker & start one vacuum pump
4 Open seal steam manual isolating valve at TG 8.5 m & increase seal steam inlet temperature (By
opening seal steam supply bypass & leak off bypass MOV). But It
should not be admitted to seal steam header if temperature is less than 250 deg C
5 Charge seal steam header ( By opening MOV MAW10AA010 & control valve) at vacuum 0.80 ksc
6 Start GSC fan & ensure its inlet valve opens on auto.
7 Put Seal steam header pressure controller in auto
8 Ensure Main turbine speed is in increasing trend & it will stabilize between 100 to 120 RPM
9 Ensure all drains to UFT are closed & all drains to SDFT are opened
10 Ensure Condenser vacuum should be more than 0.15 ksc.
11 Maintain Hotwell & Deaerator level.