Preventive Maintenance Report for NGN
(Supplied by M/s UTStarcom)
Pkg-II Equipment
er GUT JAHD J RATPUR GATE
“ /
TP Address & ENS pe ook éJ F
Annexure -1
Hostname ofthe
et] seu | [ERON ZUR PON
nD SS ee
3 | Assam | Ass7MM/NEN CLASS 5 GOPN OLT & ONT/2019-20/1
RE/To/NEN es OLT £ONT/UTSarcon/=OU
Tihg/20-24/2017- 10] NGN/ UYStrcen/ Aldon dated at B68
Preventive
Rano rors a #019 39/a00-ON/FONOLTS
(Please tick the rr Sean gta FHT OETA OTROS
concemed PO) i re Frocareinen of FOUTS
1 rev 22 360/201920/ADD-ON/GTONOLTS ONT
no 71g-19/53 347 /201930/A0R-ON/EPON OUT ONTA
o nIeo/FO [OUT ONT [RET
ze rwinm/ro-as (3039-20
aE Ts W/W-9576/RTHEN ADT on GRONBID3D
LMG Detail
18G Detail
LSW Detail
PON GNX 3/04%G
Name & Dasignaion of
BSNL in charge
| Name of UTStarcom
Engineer:
Period of ae
Oct-21 to Dec-21Part 1
Inventory History Details:
{ [Oty Description
S.N |Name Product Code
ae = Installed
~ |Line Media Gateway (LMG) - ~ ForPols &Data
| l Bi20eF(oraKe——«d
1 |B1205F chassis ae
2 |B1205E Chassis i 81205E for 512P LMGs.
B1205 for
3 |B1205 Chassis Pease én
LMGs
[4 |POW Card For all LMGs.
5 __|PCU card For all LMGs
| 6 |csm Cara For all LMGs
ame ENC For all LMGs
| 8 _| FXS2F Card, FXS module 96 Ports For all LMGs
9 FXS2C Card , FXS module 32 ports For all LMGs
10 | FXS1A, FXS module, 64 ports For all LMGs.
11 | ASL, ADSL2+ module, 64 ports For all LMGs
ISDN Access Gateway(IAG) For ISDN PRI
12 | Chassis and Back Plane
13 | Controller Board
14 | DSP board
15. | ISDN Ports (EPRI) for IAG — Hardware
LAN Switches (LSW) sw
46 | NUBIZ GS8000 Switch Chassis
17_| NUBIZ GS8000 600W DC Power Supply
4 | NU BIZ GS8000 LS68-MSU-II-B Module
19 | NUBIZ GS8000 LS85-24 GE-SFPE
GPON OLT
20 | GX3104G Chassis Of
21 | GX3108G Chassis
EMS
22 | LAN Switch
23 | Server 2
2 a
StoragePart ll: Preventive Maintenance Procedure
A. PM Check List
Check list for PM activity of LMG &
Sno oe Name/Observation Remarks
1__ | LMG — CSM SW Version
2 | LMG—CSM Card Status
3_| LMG—FXS SW Version sei
4 __ | LMG—FXS Card Status 2s
5 _ | LMG—ADSL SW Version
6 | LMG—ADSL Card Status act é
7__| LMG -Total-Ports Present
8 _| LMG — Temperature
9 | LMG—FAN Status za
10 _| IAG —SW Version
11__ | IAG — Controller card status
12 | |AG—Line card status a
13_ | LSW—SW Version ae
14 _ | LSW— Controller card status
45 _| LSW—Uplink Status
16 _ | LSW—Line card Status
17__ | GPON Sw Version DP OTO0O) ORF a
18 __| GPON Uplink status OK ie
19 _| GPON control card check (6K / NOT OK)
20 _| EMS Sw Version
21 | EMS uplink connectivity (ping OK / NOT OK)
B. Confirmation on the Cards Status
Abovelistedcards/modulesaretestedandfoundOK. Theoulputtromthe vaiouscommands(thatwereexeculed
during preventive maintenance is attached/seen (as applicable)pl: Conclusion & Summary
51 No Preventive Maintenance
1 | Addre
~2| IP Address & Site name of the Node
x
(0
WUE G be BSNCEKC liye
-2a6 67
3 | Working Condition of Chassis
(remarks)
QA
Contact Numbers:
Remarks, if any (for overall)
Signature of
=
names MO pe] Gag
Location: Atyry — Raygur 4ahe_
Date:
Signature of
wont menage: HWS HON,
JTO (FTTH)
‘Ahmedabad Telecom District,
Navrangpura, Ahmedabad.
Name:
Location:
Date: