GOVERNMENT OF ANDHRA PRADESH,
WATER RSOURCES DEPARTMENT
Olo Chief Engineer, Minor & Medium Irrigation,
H. No: 14-7-29, 2°¢ floor, Vysya Bhavan,
Namburi Gopal Rao street, Hanumanpet,
Vijayawada - 520 003
Memo No. DCE-I / OT2-T4 /Enumaleru 12" EOT/ 2020, _ Dt: 07-10-2020.
Sub:- Water Resources Department — Minor Irrigation — Prakasam District — FDR to
Reservoir across Enumaleru near Mundlapadu(V), Giddaluru (M), and
restoration and Improvements to Pick up Anicut across Enumaleru near
Bainapally(V), Giddaluru (M), Prakasam Dist - Extension of time up to 30-06-
2021 — Granted - orders issued — Reg.
f:- 1) G.O. Rt. No. 94, | & CAD(PW-EA) Dept., Dt: 23-05-2006,
2) G.O. Ms. No. 102, | & CAD (PW:EA) Dept., Dt: 30-05-2008.
3) T.O. Technical Sanction No. 161/2008-09, Dt: 04-10-2008.
4) SE/IC/Ongole LS Agt. No. 2/2009-10, Dt: 02-06-2009.
5) SE/IC/Ongole Proc. No. DB/D3/1461M, Dt: 29-12-2010.
6) 1.0. Memo No. DCE. Spl. Cel/OT(T) /AE1/SOVI /RIAD/Enumaleru, Dt: 18-11-2011.
7) 7.0. Memo No. DCE. Spl. Cell/OT(T) /AE1/SOVI /RIAD/Enumaleru, Dt: 08-08-2012.
8) 7.0. Memo No. DCE. Spl. Cell/OT(T) /AE1/SOVI /RIAD/Enumaleru, Dt: 28-02-2013.
9) 7.0. Memo No. DCE. Spl. Cell/OT(T) /AE1/SOVI /RIAD/Enumaleru, Dt: 23-04-2014.
10) T.O. Memo. No. DCE-I/OT2/T1/SOVURIAD/Enumaleru, Dt: 13-02-2015.
11) T.O. Memo. No. DCE-VOT2/T1//Enumaleru EOT, Dt: 02-01-2016.
12) T.O. Memo. No. DCE-l/OT2-T1/Enumaleru EOT, Dt: 23-11-2016.
13) T.O. Memo. No. DCE-V/OT2-T1/Enumaleru EOT -2017, Dt: 22-09-2017.
14) T.O. Memo. No. DCE-VOT2-T1/Enumaleru EOT-2018, Dt: 05-10-2018,
1) T.O. Memo. No. DCE-VOT2-T1/Enumaleru 11% EOT/2020, Dt: 06-03-2020.
16) SE/IC/Ongole Lr. No. SE/ICIOGL/DB/D3/W/149/221 CE, Dt; 25-08-2020.
Under the circumstances reported and based on the recommendations of the
‘Superintending Engineer, Irrigation Circle, Ongole in the reference 16" cited, the
extension of time for the Agreement under reference 4" cited and subsequent
supplemental Agreements concluded in respect of “FDR to Reservoir across
Enumuleru near Mundlapadu (V), Giddaluru (M), and Restoration and
Improvements to anicut across Enumuleru near Bainapally(V)Giddaluru (M)-
Prakasam (Dist)” is here by granted up to 30-06-2021 under clause 59 of PS to
APSS
The Superintending Engineer is requested to take necessary action as per the
agreement conditions and as per the rules in vogue,
The Superintending Engineer is also requested to ensure the following:
1. The work shall be completed in all respects within the extended period of
agreement.
2. The Superintending Engineer shall approve the revised milestones to complete
the balance work within the extended period up to 30-06-2021 and monitor
fortnightly progress with respect to the approved revised mile stones and reportcompliance. The copy of approved milestones shall be furnished to this Office for
record.
. The Superintending Engineer shall resolve all the issues at work site so that there
shall not be any hurdles to the work
. The revalidation of Bank Guarantees towards EMD shall be obtained from the
Agency up to completion of this EOT period plus defect liability period
The receipt of this memo may be acknowledged forth with.
To
The Superintending Engineer,
Irrigation Circle - Ongole.
Sd/- Dt: 07-10-2020,
N. Pulla Rao,
Chief Engineer,
Minor & Medium irrigation,
Vijayawada.