You are on page 1of 2
P-T. RAYON UTAMA MAKMUR. PT. RAYON UTAMA MAKMUR J. Raya Songgorungei ~Jatipuro Km 3.8 No. 8 Ds. Plesan, Kee. Nguter, Kab, Sukoharjo Solo-Jawa Tengah 5771 ‘Tolp. (0271) 398188 Fax (0271) 593488 ‘Email -ferum‘@rum-indonesia.com PRODUCTION NOTICE No, PN.26/TP/2021/XII Date: 22-11-2021 SUBJECT : Line A Maintenance Plan( A 28/342 #203it3) ) TO: Viscose, Spinning, Spinbath, Power Plant, Electric, DCS, CS:, QC, ME, Utility. Dear: ABA RHE, 2021 4 12 A 29 A, Theltet 10 Phat. According to company arrange, December 29" 2021, schedule to maintenance 10 hours, arrange as follow: 1. (48 Stop Machine LL. 9H: 12 A 29 BA YEH 06:00 FFE, $54 DCS HH CS. FFE. Spinning: On December 29% moming at 06:00 o'clock spinning machine stop, spinning DCS notified CS2 recover to stop. ‘Jif: 29 06:00 FFRAL 500 mi, Viscose: On 29 at 06:00 o’clock stock viscose about 500 m* Tis: 29 1 06:00 FIL ARIAT. Spinbath: On 29" at 06-00 o’clock acid bath circulation will stop. CSr: 06:00 F# CS: (SUK, HLF PRT TBE. Sx: at 06;00 o’clock CS2 recovery stop, the valve of switch off. a”: Power Plant: 29 Fl 06:00 SOBER, AREA HEIR MED BE. KH 07:00 PRIA On 29% at 06:00 turbine stops, reduce consume steam according to overhaul condition, At 07:00 steam stops. 180 9001:2015 No.Dok TEC-01.02 Rev.00 18.08.2018 182 PT. RAYON UTAMA MAKMUR J, Raya Songgorunggi —Jatipuro Km 3,8 No. § Ds. Plesan, Kee. Nguter, Kab. Sukoharjo Solo-Jawa Tengah 57571 7 ‘Telp. (0271) 593188 Fax (0271) 593488 P-T. RAYON UTAMA MAKMUR a oy SN Pes OF See 2. JF Start Machine 21, BRE: AAC EE: TEACH KAR 2:1 Viscose: Pulp ratio: hard wood pulp: soft wood pulp 2:1 2.2, Gj: 15:00 WAEFE SIME, 16:00 A RIFT Spinning: at 15:00 o’clock prepare to spinning, 16:00 line A start production, 2.3. MEW: 15:00 FFM HE, TER bi. Spinbath: at 15:00 o’clock spinning circulation start for supply acid according process standard. 2.3 HL: ROEEHE IG, RAUL TE AH) 15:00 FRET. MATTE eT AHL. Power Plant: After overhaul finish give information technical production scheduling about 15:00 start transfer steam. Depending on the production situation, run the steam turbine. RT RAEI Te), BOAR RMSE. WT, Ra ii. All department shall be arrange equipment maintenance the schedule during production stop. If there is a problem, please immediately to inform it. Approved by Acknowledged by iG JIN C aie MIN PRAMONO GM. Operation: Production Director President Director CC: General Director, PPIC, Civil, HSE, Logistics, Workshop, GA. Rev.00 18.08.2018 242 480 9001-2015 ‘No.Dok TEC-01.02

You might also like