P-T. RAYON UTAMA MAKMUR.
PT. RAYON UTAMA MAKMUR
J. Raya Songgorungei ~Jatipuro Km 3.8 No. 8
Ds. Plesan, Kee. Nguter, Kab, Sukoharjo
Solo-Jawa Tengah 5771
‘Tolp. (0271) 398188 Fax (0271) 593488
‘Email -ferum‘@rum-indonesia.com
PRODUCTION NOTICE
No, PN.26/TP/2021/XII
Date: 22-11-2021
SUBJECT : Line A Maintenance Plan( A 28/342 #203it3) )
TO: Viscose, Spinning, Spinbath, Power Plant, Electric, DCS, CS:, QC, ME, Utility.
Dear:
ABA RHE, 2021 4 12 A 29 A, Theltet 10 Phat.
According to company arrange, December 29" 2021, schedule to maintenance
10 hours, arrange as follow:
1. (48 Stop Machine
LL.
9H: 12 A 29 BA YEH 06:00 FFE, $54 DCS HH CS. FFE.
Spinning: On December 29% moming at 06:00 o'clock spinning machine
stop, spinning DCS notified CS2 recover to stop.
‘Jif: 29 06:00 FFRAL 500 mi,
Viscose: On 29 at 06:00 o’clock stock viscose about 500 m*
Tis: 29 1 06:00 FIL ARIAT.
Spinbath: On 29" at 06-00 o’clock acid bath circulation will stop.
CSr: 06:00 F# CS: (SUK, HLF PRT TBE.
Sx: at 06;00 o’clock CS2 recovery stop, the valve of switch off.
a”: Power Plant:
29 Fl 06:00 SOBER, AREA HEIR MED BE. KH 07:00 PRIA
On 29% at 06:00 turbine stops, reduce consume steam according to overhaul
condition, At 07:00 steam stops.
180 9001:2015 No.Dok TEC-01.02 Rev.00 18.08.2018 182PT. RAYON UTAMA MAKMUR
J, Raya Songgorunggi —Jatipuro Km 3,8 No. §
Ds. Plesan, Kee. Nguter, Kab. Sukoharjo
Solo-Jawa Tengah 57571
7 ‘Telp. (0271) 593188 Fax (0271) 593488
P-T. RAYON UTAMA MAKMUR a oy SN Pes OF See
2. JF Start Machine
21, BRE: AAC EE: TEACH KAR 2:1
Viscose: Pulp ratio: hard wood pulp: soft wood pulp 2:1
2.2, Gj: 15:00 WAEFE SIME, 16:00 A RIFT
Spinning: at 15:00 o’clock prepare to spinning, 16:00 line A start production,
2.3. MEW: 15:00 FFM HE, TER bi.
Spinbath: at 15:00 o’clock spinning circulation start for supply acid according
process standard.
2.3 HL: ROEEHE IG, RAUL TE AH) 15:00 FRET. MATTE
eT AHL.
Power Plant: After overhaul finish give information technical production
scheduling about 15:00 start transfer steam. Depending on the production
situation, run the steam turbine.
RT RAEI Te), BOAR RMSE. WT, Ra
ii.
All department shall be arrange equipment maintenance the schedule during
production stop. If there is a problem, please immediately to inform it.
Approved by Acknowledged by
iG JIN C aie MIN PRAMONO
GM. Operation: Production Director President Director
CC: General Director, PPIC, Civil, HSE, Logistics, Workshop, GA.
Rev.00 18.08.2018 242
480 9001-2015 ‘No.Dok TEC-01.02