GES DESION CENTER 7/26/08, REVISION &
GE Healthcare Technologles
SECTION | PAGE J=i54
DEFINIUM 8000
ye oa
19
7 +
Y
=
@
tt
f
2)
14-0)
CONTROL,
ROOM
THE FOLLOWING TOMO & IMAGE PASTING
APPLICATIONS ARE POSSIBLE WITH THE
LAYOUT AS SHOWN IN THESE DRAWINGS
ONS
LEE
Sie oe aud eS [00]
ING x
LLSTAND TOMO & IMAGE
CROSS TABLE TOMO (TO WALLSTAND) [x
‘CAUTION:
OTS LONGITUDINAL DRIVE BELT ASSEMBLY.
ENSIFERA TOMO (EXTENDED waLusranp)| [x
TABLE TOMO x
(arms ToT & WoT
TaN EET)
(now
<0" [itm x 386n) | a=
Eel) 5
EE APPEND "A" FOR POWER SPECIFICATIONS
SEE PRE-INSTALLATION MANUAL #5137435~100
FOR REQUIRED CLEARANCE AREA. OF THE DEFINIUMINSTALLATION SERVICES DESIGN CENTER 7/28/08, REVISION 3 SECTION 1 PAGE 1-133
ROOM PLAN LOCATED ON PAGE 1-134
TEM] —__ QUANTITY
On TEM_DESCRIPTION WEIGHT HEAT QUTPUT
@ | |x saprocrarHre susPeNSTON wiTH 628 (bs 501 btu
Tungasb MUN TIN:
@® |e |eoncatupinen stationary RagL FoR 68
SP NSUSPENS TON
@| 2 |orcrteL ELevaTinc TABLE 1058 (es 1102 btu
@ | 1 |svstems caprner 679 (bs 1098
®|1|werout weaeine stanp 101 (bs
®|1]irmace PastING BARRIER 200 (bs
@)| 1 Joreratars consoLe 74 (es 1235 btu
@ |. fvoncitupinaL peive PELT
TOIN. WIDE
JANCHOR RAILS
2 fogrp HoLbeR: as ibs
FIELD VERIFY
TDEAC LOCATION?
@ |: jpetector 97 tbs
BE SEG So assemmty
@|:|orortay cHest untt oS ee ais
cusrowe/conrcTon ‘SUPPLIED AND INSTALLED ITEMS
NTER TOR FOR EGUIPMENT—
IWOM DESTH 24" iN. AND ADDITIONAL SHELVING May
WTRED BELOW COUNTER TOP FOR Po TOWER PSoy IDE
MMETED OPENINGS AS REGUIRED TO ROUTE CABLES.
ONTROL WALL, 7 FT, HIGH WITH LEAD GLASS VIEWING
ABLE DRAPE RAIL.
INIMUM DOOR OPENING FOR EQUIPMENT DELIVERY Is
BaNIN. wos SS IN. MH Cillian < S20amma, CONTINGENT
BA 4.56"IN. “PeaSemma CoRRTDOS WIDTH
TION.
BENING) E8S0287 QR WITH SOTO RESTART EasoeRe,
BE
ENVIRONMENT,
Ambient Operation Temperature: se—ss cF>
Allowable Temperature Change: 1e* ¢F> per hour
Hurnility 20-80 percent non condensine
Allowable Humidity Change: 10 percent per hour
Max — Altitude: 2000 $2, aeove sea level