You are on page 1of 9

questions-unit 2

UNIT II SCHEMATIC DESIGN INTEGRATING ARCHITECTURAL DESIGN


WITH
STRUCTURAL AND SERVICE CONSIDERATIONS 18
Evolving a conceptual design project into schematic design, balancing
different technical considerations. Considerations to include
appropriate structural, plumbing, electrical, mechanical and HVAC
systems. Working out schemes to decide and finalise on the best
possible design that integrates everything together. Scale of the
project could be small to medium and include any typology, involving
a newly created, quick, simple design or an older design from previous
academic years.
members:
s.kavya parvathy
s.j.kirthikaa
k.padma priya
j.r.vigneshwaran

1.Concept generation methods ; Property mapping,


Blending concepts, Concept integration
2.HVAC system a sensing device is used to compare the
actual state with target state then that system itself
decides what action as to be taken in ventilation

3.List the concept derivation methods ; Theme, Ana


logging, Scheme, Context, Symbolism, Experience,
Metaphor, Scenario

4.The process concerned with material application,


durability and affordability is called----------?
Materialization/ concretization

5.What are the categories into which human comfort is


classified? Movement patterns, Human behaviour,
Proxemics, Ergonomics, Anthropometrics

6.Which method of concept derivation focuses on


external appearance and form? A.Symbolism
B. Context
C. Analogy
D. Metaphor

7.Which of the following is a part of concept


development in technical method?
A. Site planning
B. Lighting
C. Artificial lighting
D. Ventilation
8. 15A sockets are not provided for...?
A. Lights
B. Refrigerator
C. AC
D. Heater
9. Major classification of HVAC systems
Split system, hybrid system, duct free system,
packaged heating and air system

10.
What does
red, pink, green, yellow colour pipes represent?
Red-hot water pipe
Pink- soil waste pipe
Green - cold water pipe
Yellow- sewage waste

11. What are the structural components of a


building?
Column, beam, footing, structural subfloors, bearing
walls, foundation

12. List any 3 pipe fitting used to connect two


pipes?
Tees, elbow, crosses, couplings
13. What material should not be used for drinking
water pipes? Lead pipe

14. What are the materials used for plumbing


pipes?
Cast iron, PVC (PolyVinyl Chloride), Chromed brass,
chromed copper, galvanized iron, Copper, CPVC
(Chlorinated Poly-Vinyl Chloride), PEX (Cross-linked
Polyethylene), Black iron

15.

What does that electrical symbol mean? 1 no's 5 amps,


15 amps

16.
What does this electrical
symbol mean? Spot light

17.

What does this electrical symbols mean? Two way, Tele


point,A/c point

18. In air conditioning systems______ can be used to


reduce the peak summer power demand and help to
reduce the need for costly power units.
a) r-22 b) r-410 a c) HCFC d) natural gas
19. Is the main refrigerant chemical used in small
scale air conditioning units and heat pumps?
A) Argon b) Freon c) HF d) H2S

20. In wiring colour codes


Green /green with yellow stripes-protective ground
In wiring colour codes neutral is represented with ___
(white) colour
Mention the colours of three phase line-red, black,
blue

21. _____system connect several engineered systems


together to make it more energy efficient and to trim
costs. (IBS -integrated building system)

22. What is the material used in filling the sunken slab


to bring light weight into effect_______- broken
bricks,coal lumps,burnt thar.

23. One elevator is required for every ____ net


useable area
A) 30,000 b)75,000 c)45,000 d)20,000

24. A vertical transport equipment that efficiently


moves people from and between levels or storeys-lifts
or elevators

25. Water plants, drainage, firefighting (sprinklers,


pumps, pipes) comes under ____systems for a building
project (MEP)