You are on page 1of 7
No, 4286-GIGLM-1004-PL-DOC-PRO-R-0021 9.noa cde wD Ree) Page 1 of 5 | PROJECT MEHSANA-BATHINDA PIPELINE PROJECT (MBPL), PHASE-lI, ‘SECTION -lII (HARSOLI - NAWALGARH) | OWNER GSPL INDIA GASNET LIMITED (GIGL) | ENGINEERING : | ENGINEERS INDIA LIMITED (EIL) COSULTANT (@ONSTRUCTION : | INTERTEK INDIA PVT. LTD. (IPL) UPERVISION TPIA : | CERTIFICATION ENGINEERS INTERNATIONAL LIMITED (CEIL) EPC CONTRACTOR : | JSIW INFRASTRUCTURE PVT LTD.(JSIW) PROC! —E FOR APPLICATION OF ROCK SHIELD For Review or | 05.12.19 | Ra ewey For Review SHAZLEND EA 00 | 17.10.19" |e poroval V3iilia | ; Prepared by | Checked by | Reviewed by | Approved by Bert) Daa eer |S JSIW CEIL IPLIGIGL Doe No, : A286-GIGLM-1004-PJ-DOC-PRO-R-021 5 Rev :01 5 wou und —] Page 2 of 5 Date: 05-12-2019 PROCEDURE FOR APPLICATION OF ROCK SHIELD ‘| TABLE OF CONTENTS SR.NO. | DESCRIPTION PAGE NO. : oe 1.0 PURPOSE 3 20 | score. 7 3 3.0 | REFERENCES ane rw 4.0 RESPONSIBILITIS 3 5.0 EQIUPMENTS: j 4 6.0 METHODOLOGY 4 7.0 HEALTH, SAFETY AND ENVIRONMENT 4 8,0 ITP/EORMATS 5 1.0 3.0 4.0 + A286-GIGLM-1004-PJ-DOC-PRO-R-021 Rev 01 Page 3 of 5 Date: 05-12-2019 PROCEDURE FOR APPLICATION OF ROCK SHIELD | PURPOSE: The purpose of this procedure is to lay the guidelines and requirements to establish a method or a system to provide the protection of anticorrosion coatings of pipeline laid in rocky terrain by the installation of Rock Shield Mess to be used in Laying & Construction of Stee! Gas Pipeline at Section-III, Phase-II in Mehsana- Bathinda Pipeline project. ‘SCOPE: ‘The scope of work covers the minimum requirements to be complied during the installation of Rock Shield in the trench of Rocky area during lowering or prior to post padding for Laying & Construction of Steel Gas Pipeline at Section-III, Phase-II in Mehsana- Bathinda Pipeline project. REFERENCES: Following documents in totality or in part shall form the reference documents: 6-71-0051 Rev. 4 - Standard Specification for Pipeline Construction GIGL/HSE/02 Rev.1 ~ Health, Safety and Environment Management A286-000-11-42-EDB-0001 Rev. 10-Engineering Design Basis RESPONSIBILITY: QA/QC Manager: Reporting to RCM and reports directly to Head-QHSE and shall have overall authority and responsibility for implementation of QA/QC programs at Construction stages. He will have sufficient authority and Organizational freedom to achieve ‘Quality Objectives’ at ProcuremenSite Offices and that the Project Schedule shall not compromise quality. QA/QC Team shall assist him for carrying out surveillance on various activities during execution of Project and ensure implementation of Quality Management System in order to meet QA/QC requirement for the Project and cross check on QA/QC activities carried out by Quality Inspectors. QC EngineeriForman: Coordinate with QC Manager! RCM and take the program to organize and plan their activity schedule, Work in line with Procedures & Inspection Test Plans approved by CEIUIIPLGIGL. Direct and supervise Subcontractors in their area of work. Responsible for maintaining quality and HSE on assigned work at project site. HSE Officer: shall be reporting to RCM and shall have overall authority and responsibility for Health, Safety, and Environment. Coordinate with CEIL/IPLIGIGL discipline Engineers, Subcontractor and the workforce in general for overall safe practices to be adhered during the execution of Project. Plan, organize and co-ordinate basic induction training and orientation & maintain records. To confirm that all lifting equipment, tools / tackles and lifting belts for us Doc No. : A286-GIGLM-1004-PJ-DOC-PRO-R-021 un = i GP NO GME UTED Page 4 of 5 Date 0: 019 PROCEDURE FOR APPLICATION OF ROCK SHIELD 5.0 6.0 7.0 EQUIPMENTS: Side Boom/HYDRA Lowering Belts/Cradles ROCK SHIELDS (Raychem RPG Limited/SINGHAL) or equivalent. ‘STRAPPING TAPES PLIER / Heating Torch with Flash Back Arrestors. METHODOLOGY: JSIW shall install the Rock shield (manufacturer Raychem RPG Limited / Tuflex or Equivalent ). In addition to compacted padding Shall be atleast 150 mm of sand /soft soil padding around the pipes in Rocky area. Padding Materials that are approved byclient shall be graded soil/sand containing no gravel .rock or lumps of hard soil suitable sand Approved by Engineer-Incharge shall be used for padding Rock shield shall be of high density extruded polyethylene mesh with following properties: Thickness - 6 mm (minimum) Compressive Strength - 250 PSI Impact Resistance 100 in-Ib. Material HDPE. Application Method Unroll the mesh parallel to the already lowered pipe to be protected. Cut the mesh into pieces of more than 6" of the circumference of the pipe. Wrap the pipe with the mesh overlapping the previously installed mesh by around 6” (min) Fix the mesh with plastic bands/strapping polypropylene tapes.Alternatevly self adhesive polypropylene tapes may be used. Before Procurement submit the Material Sample along with MTC to get approved by client. + Rock shield net can be installed along the pipe or around the pipe as per the diagrams below, and can be joined using a gas torch by pressing the faces together, or can be secured by means of strapping tapes or similar. HEALTH, SAFETY AND ENVIRONMENT: ‘+ Prior to commencement for the application of Rock Shield, Tool Box Talk Meeting should conducted ‘We shall ensure that a high degree of housekeeping is maintained ichine operator involved shall be an experienced person. ‘be noted that the special care to be adopted against snake / insects bite. fai e Doc No, | : A286-GIGLM-1004-PJ-DOC-PRO-R-021 Rev ol : “Page 5 of 5 Date 05-12-2019 PROCEDURE FOR APPLICATION OF ROCK SHIELD Seda PPE shall be used in this activity Only trained rigging personnel to be deployed for this activity. Personnel around the machine (if any) should be cautious about overhead falling object. During the movement of earth moving equipment the operator should blow horn to caution the people around All Measuringllifing and Test Equipment used shall be inspected & well maintained. «First aid box should be available at site. Restrict the personal to move under the lifted pipes. + The approved procedure of Health, Safety & Environment shall be followed during the installation of Rock Shield. 8.0 ITP AND FORMATS : Inspection Test Plan for the application of Rock Shield ‘A286-GIGLM-1004-PL-DOC-ITP-R-0021 Inspection Report for the application of Rock Shield ‘A266-GIGLM-1004-PL-FR-01-0021 <<} Project: Mehsana Bathinda Pipeline Project, Phase 2 (Section Ill) leuenr ‘GSPLINDIA GASNET LIMTED (GiGL) lec ENGINEERS INOIALTD(EIL) [doe No A206-GiGLM-1004 PL DOC-TP.R.G021 les INTERTAK INDIA PVT. LTO, (NPL) [Revo frew ‘CERTIFIGATION ENGINEERS INTERNATIONAL LTD. (GEIL) [CONTRACTOR JSIW INFRASTRUCTURE PYT LTO,USM) INSPECTION TEST PLAN FOR THE INSTALLATION OF ROCK SHIELD o Activities syusw |eycei.| BY IPLCIGL | Docs tobe verified Remarks lh es Manufacturer Test 2 |e toc Rock Shes Materia we | Rw | Rw - Manufacturer Test Nertcaton of Manufacture, Thickness & a: [eerie we | w | Rw | certeate approves tenia of Rock ies Proce 4 [Mel nspecton we | s S__| Approved Procedure 5 [Aeplicaton of Rock Shit we ‘Approved Procedure [ese WO] 1005 WITNESS Ay CONTRACTOR "HPP HOLD PONT a REVIEW OF DOCUMENTS = SURVEVLLANCE ah Witness. HP-A point which requires witnessing, inspection , verification and acceptanc hy a Random Witness, Client before any further processing is permitted Suastent os Wslrelig PROJECT MEHSANA BATHINDA PIPELINE oe: E <> | PROJECTS PHASE II (SECTION III) &» thd ir mainte lcuest Mis GSPL INDIA GASNET LIMITED. Report No. ee = ngneers tna Limited (E1L) Date les Mis INTERTEK INDIA PVT, LTD( HPL) [rer Fu Certified Engineers International Ltd (CEI) [CONTRACTOR = 38! (FRASTRUCTURE PVT LTD INSPECTION REPORT FOR THE APPLICA’ N OF ROCK SHIELD Teena ieeamo rT cara ee teva] ‘Stamegem | ockantea | td nat | Rook ind ea remake wins irene) | (Uw) inmetor Progress Today (square m) | Progress previous | Progress Comite ay FORUP) 9, S % [ala N zg 4 Ei 5 oh is Ng ates isIpNe = poche CIOLAT Oe PL-AICOTOn Resor Be

You might also like