You are on page 1of 6

PROJECTREPORT SPECIFICATION

FontSize–12/12.5FontStyle–
TimesNewRomanLineSpacing – 1.5 Standard Spacing
WrapperColour:-
PistaGreenNo.ofpages 80 –
100
Binding–Soft(K.G.BoardBinding)SpiralBindingwillberejected
Onecopyhaveto besubmittedand onecopy to beretainedforthe Viva-Voce

Certificates:
1. Original Approval Letter (Issued by the Department) should be attached to the
copysubmitted to
theDepartmentforevaluationandPhotoCopyshouldbeattachedto the othercopy.
2. ChairpersonCertificate (ProjectCertificatetobe dulysignedbytheChairperson)
3. ProjectCompletionLetterintheLetterHeadof ConcernedCompany.
4. Internalguide certificate(Dulysignedbytheguide).
5. ExternalguideCertificate (Duly signedbytheguide).
6. Acknowledgement(dulysignedbytheStudent)
7. Contentpagealongwith pagenumbers.
8. Declaration(dulysigned by theStudent)
9. ListofTables
10. ListofCharts
11. ListofAbbreviations
Details of the
Content:CHAPTERI
Chapter–I:Introduction: ZATION
a. Introduction
b. Statementof theProblem
c. Scopeof Study
d. Objectives ofthestudy
e. ResearchDesign
f. ResearchMethodology
g. Limitationsof thestudy
h. ChapterScheme(Discriptionofeachchaptersparawise).
Chapter–
II:RelatedtoyourtopicatIndustrylevelForExample:-
- LabourWelfareMeasureindifferentcompanies
- LeadingMutualFundsinIndia
- Consumerperceptiontowardstourism
Chapter–III:CompanyProfile
a. Regardingthecompany
b. Aboutthe Topicwith respectto thecompanychoosen
c. Forexample: Labourwelfaremeasurespracticedin JKTyres
Chapter–IV:Conceptual FrameWork
TheoreticalAspectsrelated toyourtopic
Chapter–V:Survey,AnalysisandInterpretation
- DataCollection
- FocusGroup
- ResearchInstrument(ex:Questionnaire,PersonalInterview…..)
- SamplingTechnique
- SampleSize
- StatisticalToolsUsedforAnalysis andInterpretation
- Survey,AnalysisandInterpretation
Chapter–VI:SummaryofFindings,SuggestionsandConclusion

BibliographyAnnex
ure
NOTE:-Allthecertificatesshould betypedonly (Nohandwritten).

The last date for submission of Project Report will be intimated


byExaminationBranch,KSOU,Mysore.

ChairpersonDepartmen
tofStudies&
ResearchinManagement
LIST OF CONTENTS

Chapter
Contents Page No.
No.

I INTRODUCTION 1-27

COST CONTROL AND COST


II REDUCTION TECHNEQUES AT 28-33
BESCOM.

III COMPANY PROFILE 34-55

Conceptual FrameWork (Theoretical


IV background of the study) 56-88

Survey,AnalysisandInterpretation
V
89-96
SUMMARY OF FINDINGS, SUGGESTIONS AND
97
CONCLUSIONS

ANNEXURES
LIST OF TABLES
TABLE PAGE
LIST OF TABLE
NO. NO.
5.1 Comparison Of Substations 39
Showing the details of power purchasing
5.2 41
from power generators.
Showing the financial performance of the
5.3 43
company
Showing the comparison of energy purchased in
5.4 45
MU’s.
Showing the comparison of total metered sale
5.5(a) 47
of energy.
Showing the comparison of unmetered sale of
5.5(b) 48
energy.
5.5(c) Showing Category wise energy sales. 48
5.5(d) Showing HT break up sales. 50
Showing Revenue and demand collection in
5.6 52
crores.
Showing the comparison of source wise power
5.7 53
purchase cost during the following years.
Showing the comparison of category wise
5.8 54
consumers.
5.9 Showing company response for various questions 56
Showing the type of tools and techniques adopted
5.10 58
by company for cost management.
Showing initiative taken by the company for
5.11 reduction of waste/rejection/inefficiency/energy 59
consumption etc.
5.12 Showing clarification of Discrepancies in the bill 60
Showing the type of measures taken for bill
5.13 61
collection
Showing period required for employees to cost
5.14 62
management training
Showing energy efficiency indicators used in
5.15 63
BESCOM
5.16 Showing the cost optimization process 64
5.17 Showing areas of cost savings 65
Showing measures taken to overcome power
5.18 66
crisis
5.19 Showing reason for underutilization of capacity 67
Showing organization perception on cost
5.20 68
management
5.21 Showing the tool to measure consumer 69
satisfaction

LIST OF GRAPH
GRAPH PAGE
LIST OF GRAPH
NO. NO.
4.1 Comparison Of Substations 40
Showing the details of power purchasing
4.2 42
from power generators.
Showing the financial performance of the
4.3 44
company
Showing the comparison of energy purchased in
4.4 46
MU’s.
Showing the comparison of total metered sale
4.5(a) 47
of energy.
Showing the comparison of unmetered sale of
4.5(b) 48
energy.
4.5(c) Showing Category wise energy sales. 49
4.5(d) Showing HT break up sales. 51
Showing Revenue and demand collection in
4.6 52
crores.
Showing the comparison of source wise power
4.7 53
purchase cost during the following years.
Showing the comparison of category wise
4.8 55
consumers.
4.9 Showing company response for various questions 57
Showing the type of tools and techniques adopted
4.10 58
by company for cost management.
Showing initiative taken by the company for
4.11 reduction of waste/rejection/inefficiency/energy 59
consumption etc.
4.12 Showing clarification of Discrepancies in the bill 60
Showing the type of measures taken for bill
4.13 61
collection
Showing period required for employees to cost
4.14 62
management training
Showing energy efficiency indicators used in
4.15 63
BESCOM
4.16 Showing the cost optimization process 64
4.17 Showing areas of cost savings 65
Showing measures taken to overcome power
4.18 66
crisis
4.19 Showing reason for underutilization of capacity 67
Showing organization perception on cost
4.20 68
management
Showing the tool to measure consumer
4.21 69
satisfaction

You might also like