KERAJAAN MALAYSIA
JABATAN KERJA RAYA MALAYSIA
STANDARD SPECIFICATION
FOR ROAD WORKS
Section 2: Earthworks
UK) SoTWATENGARAH KERIA RAY
| JABATAN KERIA RAYA MALAYSIA
JALAN SULTAN SALAHUDBIN,
S052 KUALA LUMPUR.FOREWORD
[As practices in road construction change over timo, tis imperative for Jabatan Kerja Raya
(UKR) to continuously update and improve their standard specifications. These now
specications are not only aimed at keeping abreast with currant technologies but also
helping in improving the quality of constructed product. n unison, these new specifications
have @ significant positive impact on the constuction industry especially with the
incorporation of new products and technologies.
Standard Spectication for Road Works is an essential component in the road
infrastructure constuction Industry. Tis specication provides an improved guidance in
the material selection and the production of good quality workmanship and product,
based on current best practions. The purpose of this standard specification isto establish
uniformity in road works to be used by road designers, road authorties, manufacturers
and suppliers of road related products
‘This document “Standard Specification for Road Works - Section 2: Earthworks” isa part,
ofa series of improved speciicatons in the Standard Spectication for Road Works. The
compilation ofthis document was carried out through many discussions by the technical
committee members. Adlionally it has been presented at a technical workshop held on
1 March 2011. Feedbacks and comments received were carefuily considered and
Incorporated in the specication where eppropriate,
‘This Specicaion had also been presented in the Mesyuarat Jawatankuasa Spesifikas!
Piawai JKR bagi Kera-kerfa Jalan Bil. 272012 on 12” Api 2012 and fnally approved in
the Mesyuarat Jawatankuasa Pemandy Pengurusan Bi 04/2013 on 19" February 2013.
‘Ths document willbe reviewed and updated trom time to ime to cate for any changes on
policies and current requirements. In this respect, any comments and feedback regarding
fo this specication should be forwarded to Unit Standard & Spesikasi, Cawangan
‘ojurutoraan Jalan & Geoteknik
Published by: -
CCawangan Kejurteraan Jalan & Gootoknik
Ibu PejabatJabstan Kerja Raya
Tingkat 26, Menara PD,
No. 80, Jalan Tun Razak,
‘50400 Kuala Lumpur.
Emil ussi@ike aov.my
June 2013ACKNOWLEDGEMENT
‘This Standard Speciicaton for Road Works - Section 2: Earthworks has been prepared
bya technical committee comprised ofthe faliowing members:
‘Commitee Members
ir Dr. Mohamad Nor bin Omar (Chaliman) Caw. Ke), Jalan & Geoteknik
Ir Rami bin Othman (Caw. Ke. Jalan & Geoteknik
Ir Abdu Had bin Abdul Aziz Caw, Ke, Jlan & Geoteknik
Ir Edayu tt Salleh @ Aman Caw. Ke), Jalan & Geoteknik
Pn, Norhazamawat bt Mé Desa (Caw. Ke. Jalan & Geotekik
ir Som Pong at Pichan (Caw Ko). Jalan & Got
(ik Zaiton bt Zainal Bact Caw. Ke, Jalan & Geoteknik
‘A special thanks to the Committe that prepared the "Research Report Guidelines and
Improvement of JKR Specification for Earth Works" who chairad by IN. Selvanayagam,
former Deputy Director General Public Works Deparment for thelr valuable findings and
suies used inthis document,
Finally the publisher would ke to express its gratitude to the above committee members
for ther substantial contributions towards the successful completion of ths document,
soi(oxesey201352)
SECTION 2 - EARTHWORKS
21 CLEARING, GRUBBING AND STRIPPING TOPSOIL
24.4 Description
a4
a4
a4
a4
Site Clearing
Gaubbing
Stripping Topsoil
Dumping
21.2 Construction Methods
2a2a
2122
2123
2128
2125
2126
‘Aceas to be Cleared
‘Aceas to be Cleared, Grubbed and Stipped of Topsoil
Topsail
Timber
Structures
Disposal of Material
22 EARTHWORKS
22.1 Definitions
22.2 General Requirements
223 Roadway Excavation
2234
2232
2233
2234
2235
2236
2237
2238
2239
22310
22311
Dimensional Tolerances
Separation and Stockpilng of Sutable Material
Removal of Excavated Material from Ste
Removal of Unsultable Material
Replacement of Excavated Material Under Standing Water
‘Widening Cuts
Excavation of Rock
Storage and Handling of Explosives
Blasting
Safety Measures
Insecure Material
224 Earth Embankment
2241
2242
2243
2248
2245
Matera
Borrow Pits
Placement of Fil Materials
Compaction
Frequency of Control Tests
22.5 Rock Fil Embankment
22.6 Embankment Over Soft Ground
2264
Foundation Treatment
PAGE
10
10
"
"
"
"
2
4
4
8
16(owrus 120132)
2262 Surcharge and Staged Construction 18
22.83 Geotechnical Instrumentations 5
22.64 Monitoring Records 16
22.7 Subgrade 6
2.2.8 Protective Vegetation for Erosion Control wv
2281 Topsoil wv
2282 Tung 7
2283 Hydroseoding 8
2284 Croopers 19
2285 Temporary Slope Protection 2
2286 Falure to Comply to Speciicaton 2
sowSECTION 2: EARTHWORKS24
01599201352)
SECTION 2 - EARTHWORKS
CLEARING, GRUBBING AND STRIPPING TOPSOIL
244 Description
‘This work shall consist of clearing, grubbing and stripping topsoll in the
‘areas within the limits of Works designated hereunder andlor shown onthe
Drawings andlor directed by the S.0., and of clearing only in other areas
esignated hereunder andlor shown onthe Drawings andlor directed. by
the S.0,, all as epeotied herein and as required by the S.0. Tha work shal
‘also include the demoltion and dsposal of structures in the said areas,
‘except where otherwise provided for in the Contract, 35 speciied herein
‘and as required by he S.0.
2.4.1.1 Site leering
Clearing chal consist of cutting andlor taking down, removal and disposal
‘of everthing above ground level, Including objects overhanging the areas
to be cleared such ae tree branches, except such tees, vegetation,
structures or parts of structures, and other thing which are designated in
‘the Contract to remain, or be removad by athers, or which the §.0. directs
‘are to be left undisturbed, The mater to be cleared shall include but not
necessarily be limited to trees, stumps (parts above ground), logs,
brushwood, undergrowth, long grasses, crops, loose vegetable matter anc
structures (except those structures whose removal of clearance is
ctherwise provided for inthe Contract). Clearing stall aso include leveling
of obsolete dikes, terraces, ditches, et., unless otherwise directed by the
80.
2.44.2Geubbing
rubbing shall consist of removal and disposal of surface vegetation,
bases of stumps, roots, underground parts of structures, and other
obstructions to a depth of at least 0.50 m below ground level, wih the
agreement ofthe $0.
24.4.8 Sipping Topsoil
‘Sipping topsol shall consist of the removal of topsoil to an average depth
fat least 100 mm below ground level, and its stockpiling for use in the
Works, andlor its eisposa, as directed by the S.0,
2.4.4.4 Dumping
[Al materials esuted from site clearing shal be dumped tothe Contractor's
dump site as approved by the S.0. Method statement on dumping with
particular emphasis on prevention of environmental poliuton shall be
submited tothe S.0. for approval
so(or us372013.52)
242 Construction Methods
2.1.2.1 Areas tobe Gieared
“The areas where the Works are to be carried out shall be cleared as
descibed in Sub-Secton 2.1.1, unless otherwise shown on the Drawings
andlor directed by the $.0.
Clearing shall be cariod out to the extents deemed necessary and
approved or directed by the S.O. in areas outside the road reserve where
channel excavation or ether work s required,
In areas which ae to be cleared only, and in which grubbing and stiping
topsoil are not required, the methods of work shall be such as will ot
Lnduly damage the surface vogotation and topsoil, and care shall be taken
ot to istur the topsoil and the root systems of grasses and other surface
vegetation. No topsoil shall be removed ffom such areas, excopt as
rected by the S.0., and any topsoil, grasses and other surtace vegetation
‘otherwise removed or disturbed shal be replaced and made good at the
Contractors onn expense, with the agreement of the $.0.
2.1.2.2 reas to be Cleared, Gaubbed and Stigped of Topsoil
Uniess otherwise shown on the Drawings andior directed by the S.0..
Clearing, rubbing and stripping topsoll shal be carried aut in all areas of,
roadway excavation and in all areas where embankment is to be
‘constructed, except that grubbing and sipping topsoil shall not be carried
‘ut in those areas where embankment is to be constructed on ground
‘denied as swamp or soft ground,
Coating, rubbing and stripping topsol shall be caried out to the extents
doomed necessary and approved or rected by the SO. in areas bath
Inside and outside the road reserve where channel excavation or other
work required
Except where further excavation is required, holes and cavities in the
sgtound surfac after clearing, grubbing and stpping topsoil shal be fled
with materials similar to the adjacent ground, and such fil shall be
compacted to dry density similar to that of the surrounding material, with
the agreement of the 5.0.
“This work shall be considered incidental o the work of clearing, grubbing
{and stripping topsol, and shall pot be measure fer payment
24.2.3 Topsail
“Topsoil tobe stockpiled for the Works shall be sufficiently fertile to promote
‘and suppor the growth of vegetation, and shall be taken from such areas
were clearing, grubbing and stipping lopsoiis required es approved or
rected by the S.0. Bofors stockpiling, topsol shall be seperated from
s22(oxruse 2013.2)
objectionable materials as defined in Sub-Secton 2.1.26, wih the
‘agreement of the S.0. The Contractor shall arange for stockpile sites
tether within or outside he road reserve, at his own expense, and withthe
‘agreement of the S.0. or as required by the relevant aws and regulations,
Ctherwiee, topsoil removed during grubbing and stipping operations shall
bbe separated from objectionable materials and spread within the road
reserve or borrow areas, or atherwise disposed of, a8 approved or directed
bythe S.0,
2.42.4 Timber
‘The ownership of timbers vested in the Government.
‘Saloable timber shall be timed and stacked in accordance with the
requirements ofthe appropriate Government agency, in accessible places
‘thin the road reserve as approved or directed by the S.0.
‘The Contractor shall have the right to use unsaleable timber (or saleable
limber when permission Is granted in writing by the appropriate
Government agency or author) for his own purposes in connection with
the Contact, always provided that he shall comply with the requirements of
the 5.0,
2.4.25 Sinctues
Major structures are those which cannot practicably be cleared by
bulldozer andlor hydraulic excavator, whose demolion requires pneumatic
ts, explosives andlor other specialised equipment. A brief description of
feach major structure (if any) and depth to which extent it shall be
demolished is given Inthe Bil of Quantities.
‘All fences, buildings, structures, and encumbrances of any charactor within
the limits of the road reserve, except those to be removed by others or
designated to remain, shall be demolished and removed by the Contactor.
Materials designated inthe Contract or diracted by the S.0. to be salvaged,
shall be carefully removed and slored, and shall be the property of the
Government
2.41.26 Disposal of Materia
Objectionable material such as combustible material Including all mber
(except timber to be salvaged or used), all brushwicod, stumps, roots,
vegetation from clearing, grubbing and stripping topsoll(Inctuding the