1. This document appears to be a survey report detailing measurements taken at 7 points (titik) along a sipat datar memanjang or elongated flat surface project.
2. It includes the readings from the front, back, and middle stakes at each point, as well as the total distance, average distance, and elevation differences between points.
3. The measurements were taken on an unspecified date using an unspecified surveying instrument.
1. This document appears to be a survey report detailing measurements taken at 7 points (titik) along a sipat datar memanjang or elongated flat surface project.
2. It includes the readings from the front, back, and middle stakes at each point, as well as the total distance, average distance, and elevation differences between points.
3. The measurements were taken on an unspecified date using an unspecified surveying instrument.
1. This document appears to be a survey report detailing measurements taken at 7 points (titik) along a sipat datar memanjang or elongated flat surface project.
2. It includes the readings from the front, back, and middle stakes at each point, as well as the total distance, average distance, and elevation differences between points.
3. The measurements were taken on an unspecified date using an unspecified surveying instrument.
SIPAT DATAR MEMANJANG Proyek = Diukur oleh = Lokasi = Alat = Area = Deskripsi = Tanggal = Jarak Jarak Bacaan BLK Bacaan Muka Total Jarak Jarak Rata - Rata Beda Tinggi Bacaan MK Bacaan Blk
Belakang Muka Koreksi
No Titik
Atas Atas I Elevasi Nama Titik
Tengah Tengah (M) (M) (M) (M) Rata Rata (M) Bwh Bwh II
Beda Tinggi Seharusnya
Jumlah Titik = 96 Referensi BM BM 10 79.560 -7.349 Jumlah Beda Tinggi Rata-Rata = -7.335 M CP IB 22 72.2115
Total Jarak = 2677.350 M
Toleransi Pengukuran 10√D = 16 MM Total Kesalahan -0.014 8.56√D
Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,
Owner Konsultan Supervisi Kontraktor Pelaksana
Surveyor Geodetic Engineer Site Engineering and Standarditation (Surveyor)