Summary of QAQC and Engineering Submittals 
Project  Description  Design Calculation  Shop Drawings MS/RA/ITP Material Submital 
Design Calculation Submittals  9nos Shop Drawing Submittals  20nos MS/RA/ITP Submittals  14nos  
Approved (Code A/B) 3nos Approved Calculation (Code A/B) Approved Calculation (Code A/B)  
Rejected (Code C)  Rejected (Code C)  Rejected (Code C) 
Submitted to MTT (Officially)  Submitted to MTT (Officially)  16nos Submitted to MTT (Officially)   
Submitted for Advance Review  2nos Submitted for Advance Review  Submitted for Advance Review  6nos  
CALC under revision by STB Under revision by STB On progress  4nos  
CALC on progress by STB On progress by STB 2nos On Hold  4nos  
CALC on Hold  2nos On Hold  2nos  
Code  Reference  Rev Status  Target  Reference  Rev Status  Target  Reference  Rev Status  Target  (Refer to Summary below)
Submission Submission Submission Reference  Rev
Key Plan Level 00 N/a L‐AL‐DWG‐01000 01 Code C 2‐Sep N/a
Key Plan Level 01 L‐AL‐DWG‐01000 01 Code C 2‐Sep N/a

P01 Seating Pavilion Structure S‐AL‐CAL‐00030 00 Stamped Copy  1‐Sep L‐AL‐DWG‐01000 00 Submitted 2‐Sep MST‐00011‐00 00 Advance Copy  MAR‐00199 00
L‐AL‐DWG‐01000 00 Submitted 2‐Sep ITP‐00011‐00 00 Advance Copy  MAR‐00200 00
L‐AL‐DWG‐01000 00 Submitted 2‐Sep MAR‐00201 00
MAR‐00204 00
MAR‐00205 00

P02 Circular Seat Ligthing Support  S‐AL‐CAL‐00031 00 Advance Copy  1‐Sep L‐AL‐DWG‐01020 00 Advance Copy MST‐00012‐00 00 Submitted  23‐Aug MAR‐00199 00
ITP‐00012‐00 00 Submitted  23‐Aug MAR‐00201 00
MAR‐00204 00
MAR‐00205 00

P03 F&B Pavilion Structure  S‐AL‐CAL‐00032 00 Code B L‐AL‐DWG‐01000 01 Code C 2‐Sep MST‐00013‐00 00 Submitted  23‐Aug MAR‐00199 00
L‐AL‐DWG‐01000 01 Code C 2‐Sep ITP‐00013‐00 00 Submitted  23‐Aug MAR‐00201 00
MAR‐00204 00
MAR‐00205 00

P04 Balustrade at Stairs & Bridge S‐AL‐CAL‐00033 00 Advance Copy  1‐Sep L‐AL‐DWG‐01040 00 Pending MST‐00014‐00 00 Pending information  MAR‐00202 00
* CALC Failed based on MTT Details  L‐AL‐DWG‐01041 00 Pending ITP‐00014‐00 00 Pending information  MAR‐00203 00
MAR‐00204 00
MAR‐00205 00

P05 Grating at Rainscreen  S‐AL‐CAL‐00034 00 CODE B L‐AL‐DWG‐01050 00 Submitted  2‐Sep MST‐00015‐00 00 Submitted  23‐Aug MAR‐00193 01
L‐AL‐DWG‐01051 00 Submitted  2‐Sep ITP‐00015‐00 00 Submitted  23‐Aug MAR‐00194 00
MAR‐00204 00

P05.A Splash Arrester  N/A *GEMCO to provide the splash arrestor detail to STB

P06 Walkway Platform  S‐AL‐CAL‐00035 00 CODE B L‐AL‐DWG‐01060 00 Submitted  2‐Sep MST‐00016‐00 00 Submitted  23‐Aug MAR‐00193 01
ITP‐00016‐00 00 Submitted  23‐Aug MAR‐00194 00
MAR‐00204 00

P07 Access Trench Cover  * MTT to provide final details  L‐AL‐DWG‐01070 00 Pending

P08 Garden Divider  N/A L‐AL‐DWG‐01000 01 Code C 2‐Sep MST‐00018‐00 00 Submitted  23‐Aug MAR‐00193 01
ITP‐00018‐00 00 Submitted  23‐Aug MAR‐00196 00

P09 Tree Pit Divider  N/A L‐AL‐DWG‐01000 01 Code C 2‐Sep MST‐00019‐00 00 Pending Information  MAR‐00193 01


ITP‐00019‐00 00 Pending Information  MAR‐00194 00
MAR‐00204 00

P10 Edge Planter Angle Support  *STB awaits for the RFI respond regarding the location L‐AL‐DWG‐01100 00 Advance Copy  MST‐00020‐00 00 Pending Information  MAR‐00195 00


of the Anchor Bolt ITP‐00020‐00 00 Pending Information  MAR‐00204 00

P11 Grow Lights  N/a L‐AL‐DWG‐01110 00 Submitted  2‐Sep MST‐00021‐00 00 On progress  9‐Sep MAR‐00199 00
ITP‐00021‐00 00 On progress  9‐Sep MAR‐00201 00
MAR‐00204 00
MAR‐00205 00

P12 Cat Ladder  N/a L‐AL‐DWG‐01120 00 Submitted  2‐Sep MST‐00022‐00 00 On progress  9‐Sep MAR‐00199 00
ITP‐00022‐00 00 On progress  9‐Sep MAR‐00201 00
MAR‐00204 00

P13 Slab Edge Divider  N/a L‐AL‐DWG‐01130 00 Submitted  2‐Sep MST‐00023‐00 00 On progress  9‐Sep MAR‐00199 00
ITP‐00023‐00 00 On progress  9‐Sep MAR‐00204 00

P14 Grating Inside Gridshell Funnel  S‐AL‐CAL‐00037 00 Advance Copy  1‐Sep L‐AL‐DWG‐01140 00 Submitted  2‐Sep MST‐00024‐00 00 On progress  9‐Sep MAR‐00193 01
ITP‐00024‐00 00 On progress  9‐Sep MAR‐00194 00
MAR‐00204 00

P15 Water Feature Wall  *STB awaits for Design by MTT

Summary of Material Submittals 
Item  Document Description  MAR Sample REMARKS
Reference  MAR Sample P01 P02 P03 P04 P05 P06 P08 P09 P10 P11 P12 P13 P14 P15
1 MAR‐00193 SS Sheet (2mm, 3mm, 5mm thick), Grade 316 CODE C Submitted X X X X X X
2 MAR‐00194 SS Sheet (10mm thick), Grade 316 CODE B Submitted X X X X
3 MAR‐00195 SS Angle, Grade 316 On Progress 22‐Aug X X P07/P15 Design Pending 
4 MAR‐00196 SS Solid Rod, Grade 316 X To be Submitted on Sep 6
5 MAR‐00197 Not Used 
6 MAR‐00198 Not Used 
7 MAR‐00199 MS Sheet (3mm,  5mm, 6mm & 10mm thick)  Submitted  18‐Aug X X X X X
8 MAR‐00200 MS Sheet (20mm thick)  On Progress 22‐Aug X pending updated ISO Cert 
9 MAR‐00201 MS Pipe and Round Bars  Submitted  18‐Aug X X X X X
10 MAR‐00202 MS Flat Bat (40x10mm)   X P04 Handrail Issue 
11 MAR‐00203 MS Rectangular Hollow Section X P04 Handrail Issue 
12 MAR‐00204 Bolt and Nuts, Anchor Bolt Submitted  9‐Sep X X X X X X X X X X X X X X
13 MAR‐00205 Paint Materials  On Progress X X X X X Pending Tech Specs from HEMPEL