Refer to the article titled “Schedule Modeling to Estimate Typical Construction Durations
and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants” by Hyun-Chul Lee
Et al. (2018). After thoroughly reading and understanding the article, attempt the following
questions:
Q#1: Which method(s) the researchers have adopted to estimate the construction duration of
the project? What justification and gap in the literature they have identified?
Q#2: How the researchers have obtained the critical path of the project? Follow the procedure
in the article.
Q#3: What key lessons did you learn from this article with respect to the activities scheduling
of a typical project?